CN202237709U - Control system for pressure varying adsorption gas separating equipment - Google Patents

Control system for pressure varying adsorption gas separating equipment Download PDF

Info

Publication number
CN202237709U
CN202237709U CN2011203596390U CN201120359639U CN202237709U CN 202237709 U CN202237709 U CN 202237709U CN 2011203596390 U CN2011203596390 U CN 2011203596390U CN 201120359639 U CN201120359639 U CN 201120359639U CN 202237709 U CN202237709 U CN 202237709U
Authority
CN
China
Prior art keywords
tower
air inlet
pipeline
pipe
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203596390U
Other languages
Chinese (zh)
Inventor
李勤
盛之圭
黄光玉
董洁丹
夏建伟
胡莎莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QINCE AIR SEPARATION UNIT CO Ltd
Original Assignee
ZHEJIANG QINCE AIR SEPARATION UNIT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QINCE AIR SEPARATION UNIT CO Ltd filed Critical ZHEJIANG QINCE AIR SEPARATION UNIT CO Ltd
Priority to CN2011203596390U priority Critical patent/CN202237709U/en
Application granted granted Critical
Publication of CN202237709U publication Critical patent/CN202237709U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Gases By Adsorption (AREA)

Abstract

The utility model relates to a control system for pressure varying adsorption gas separating equipment. The system comprises a tower A, a tower B and corresponding pipelines, wherein the pipelines include an air inlet pipeline and an air outlet pipeline; the air inlet pipeline is provided with a two-position five-way solenoid valve; one side of each valve position of the two-position five-way solenoid valve is connected with a tower A exhaust pipe, a tower B exhaust pipe and a total air inlet pipe respectively; and the other side of each valve position of the two-position five-way solenoid valve is connected with a tower A air inlet pipe and a tower B air inlet pipe respectively. The control system for the pressure varying adsorption gas separating equipment has a simple structure and is convenient to operate, the pipelines are utilized fully, and air-tightness can be ensured easily.

Description

A kind of control system of transformation adsorbed gas separation equipment
Technical field
The utility model relates to a kind of gas separation equipment, especially relates to a kind of transformation adsorbed gas separation equipment.
Background technology
The transformation absorption principle is to utilize adsorbent that adsorbate has been depressed different adsorption capacity, adsorption rate and absorption affinity at different branches; And the characteristic that under certain pressure, each component of separated admixture of gas is had the absorption selected; The impurity composition in the unstripped gas is removed in pressurization absorption, decompression these impurity of desorption and make adsorbent obtain regeneration.
Variable-pressure adsorption equipment mainly is made up of adsorption tower and the control system that A, two of B are equipped with molecular sieve.When compressed air passed through the A tower from bottom to up, oxygen, carbon dioxide and moisture were adsorbed by carbon molecular sieve, and nitrogen is then passed through and flows out from cat head.When molecular sieve adsorption is saturated in the A tower, just switch to the B tower and carry out above-mentioned adsorption process and simultaneously A tower molecular sieve being regenerated.So-called regeneration drains into atmosphere and makes pressure be reduced to normal pressure rapidly thereby is about in the adsorption tower gas.
But in the prior art, adsorption process and regenerative process need be provided with corresponding pipeline respectively, and its structure is comparatively complicated, and the part pipeline but obtains vacantly for a long time, and the air-tightness of system also more is difficult to guarantee.
Summary of the invention
The utility model mainly be solve that the existing in prior technology pipeline is many, complex structure, pipeline can not rationally be utilized, air-tightness is difficult to guarantee technical problem; Provide a kind of simple in structure, easy to operate; Pipeline is fully used, the control system of the transformation adsorbed gas separation equipment that air-tightness guarantees easily.
The above-mentioned technical problem of the utility model mainly is able to solve through following technical proposals: a kind of control system of transformation adsorbed gas separation equipment; Comprise A tower, B tower and corresponding pipeline; It is characterized in that described pipeline is divided into air inlet pipeline and outlet pipe; Described air inlet pipeline is provided with a two-position-five-way solenoid valve; Each valve position one side of this two-position-five-way solenoid valve links to each other with A tower blast pipe, B tower blast pipe and total inlet pipe respectively, and opposite side links to each other with B tower air inlet pipe with A tower air inlet pipe respectively.When the air inlet of A tower, during the emptying of B tower, compressed air enters into filtration, the screening of A tower inlet air through magnetic valve and A tower air inlet pipe, and the residual gas of B tower is oppositely through B tower air inlet pipe and magnetic valve discharge; When the air inlet of B tower, during the emptying of A tower, magnetic valve switches valve position, and compressed air enters into filtration, the screening of A tower inlet air through magnetic valve and B tower air inlet pipe, and the residual gas of A tower is oppositely through A tower air inlet pipe and magnetic valve discharge.Thereby realized simple in structurely, easy to operate, pipeline is fully used, the characteristic that air-tightness guarantees easily.
As preferably, be respectively equipped with quick release valve on described A tower air inlet pipe and the B tower air inlet pipe.
As preferably, described outlet pipe is respectively equipped with check valve by A tower escape pipe and B tower escape pipe on A tower escape pipe and the B tower escape pipe, and the logical scavenging pipeline of the inlet end of this check valve links to each other, and this scavenging pipeline is provided with a stop valve.When the pressure of regenerator is identical with ambient pressure, need purge its air inlet through finished product gas and could realize it is carried out holomorphosis, open stop valve at this moment, by finished product gas regenerator is purged.
The beneficial effect that brings of the utility model is; Solved that the existing in prior technology pipeline is many, complex structure, pipeline can not rationally be utilized, air-tightness is difficult to guarantee technical problem; Realized a kind of simple in structure, easy to operate; Pipeline is fully used, the control system of the transformation adsorbed gas separation equipment that air-tightness guarantees easily.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the utility model.
The specific embodiment
Pass through embodiment below, and combine accompanying drawing, do further bright specifically the technical scheme of the utility model.
Embodiment: as shown in Figure 1; The present invention is a kind of control system of transformation adsorbed gas separation equipment; Comprise A tower 1, B tower 2 and corresponding pipeline; Described pipeline is divided into air inlet pipeline 4 and outlet pipe 3, and described air inlet pipeline 4 is provided with a two-position-five-way solenoid valve 6, is respectively equipped with quick release valve 5 on A tower air inlet pipe 41 and the B tower air inlet pipe 42; Each valve position one side of two-position-five-way solenoid valve 6 links to each other with A tower blast pipe 43, B tower blast pipe 44 and total inlet pipe 45 respectively, and opposite side links to each other with B tower air inlet pipe 42 with A tower air inlet pipe 41 respectively.Outlet pipe 3 is respectively equipped with check valve 33 by A tower escape pipe 31 and B tower escape pipe 32 on A tower escape pipe 31 and the B tower escape pipe 32, and the inlet end of this check valve 33 links to each other with a scavenging pipeline 34, and this scavenging pipeline is provided with a stop valve 35.
The utility model is in the use process, and when the air inlet of A tower, during the emptying of B tower, compressed air enters into filtration, the screening of A tower inlet air through magnetic valve and A tower air inlet pipe, and the residual gas of B tower is oppositely through B tower air inlet pipe and magnetic valve discharge; When the air inlet of B tower, during the emptying of A tower, magnetic valve switches valve position, and compressed air enters into filtration, the screening of A tower inlet air through magnetic valve and B tower air inlet pipe, and the residual gas of A tower is oppositely through A tower air inlet pipe and magnetic valve discharge.When the pressure of regenerator is identical with ambient pressure, need purge its air inlet through finished product gas and could realize it is carried out holomorphosis, open stop valve at this moment, by finished product gas regenerator is purged.Thereby realized simple in structurely, easy to operate, pipeline is fully used, the characteristic that air-tightness guarantees easily.

Claims (3)

1. the control system of a transformation adsorbed gas separation equipment; Comprise A tower (1), B tower (2) and corresponding pipeline; It is characterized in that described pipeline is divided into air inlet pipeline (4) and outlet pipe (3); Described air inlet pipeline (4) is provided with a two-position-five-way solenoid valve (6); Each valve position one side of this two-position-five-way solenoid valve (6) links to each other with A tower blast pipe (43), B tower blast pipe (44) and total inlet pipe (45) respectively, and opposite side links to each other with B tower air inlet pipe (42) with A tower air inlet pipe (41) respectively.
2. the control system of a kind of transformation adsorbed gas separation equipment according to claim 1 is characterized in that being respectively equipped with quick release valve (5) on described A tower air inlet pipe (41) and the B tower air inlet pipe (42).
3. the control system of a kind of transformation adsorbed gas separation equipment according to claim 1 and 2; It is characterized in that described outlet pipe is by A tower escape pipe (31) and B tower escape pipe (32); Be respectively equipped with check valve (33) on A tower escape pipe (31) and the B tower escape pipe (32); The inlet end of this check valve links to each other with a scavenging pipeline (34), and this scavenging pipeline (34) is provided with a stop valve (35).
CN2011203596390U 2011-09-23 2011-09-23 Control system for pressure varying adsorption gas separating equipment Expired - Fee Related CN202237709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203596390U CN202237709U (en) 2011-09-23 2011-09-23 Control system for pressure varying adsorption gas separating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203596390U CN202237709U (en) 2011-09-23 2011-09-23 Control system for pressure varying adsorption gas separating equipment

Publications (1)

Publication Number Publication Date
CN202237709U true CN202237709U (en) 2012-05-30

Family

ID=46099014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203596390U Expired - Fee Related CN202237709U (en) 2011-09-23 2011-09-23 Control system for pressure varying adsorption gas separating equipment

Country Status (1)

Country Link
CN (1) CN202237709U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102954810A (en) * 2012-09-28 2013-03-06 济南夫驰科技有限公司 High/low-pressure air circuit system for test bed
CN109723866A (en) * 2018-06-12 2019-05-07 珠海市思卡净化技术有限公司 A kind of air outlet valve of list ball and conical surface sealing structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102954810A (en) * 2012-09-28 2013-03-06 济南夫驰科技有限公司 High/low-pressure air circuit system for test bed
CN102954810B (en) * 2012-09-28 2015-09-30 济南夫驰科技有限公司 Detect test stand high-low pressure air-channel system
CN109723866A (en) * 2018-06-12 2019-05-07 珠海市思卡净化技术有限公司 A kind of air outlet valve of list ball and conical surface sealing structure
CN109723866B (en) * 2018-06-12 2024-01-30 珠海市思卡净化技术有限公司 Single ball and conical surface seal structure's air outlet valve

Similar Documents

Publication Publication Date Title
CN101088591B (en) Pressure swing adsorption process with improved recovery of high-purity product
CN104066493B (en) Nitrogen-rich gas preparation method, gas separating method and nitrogen-rich gas preparation facilities
CN101274752B (en) Separation and utilization process for sulfuric dioxide and carbon dioxide in stack gas
CN202237710U (en) Energy-saving pressure swing adsorption gas separating device
CN101511448A (en) Vpsa process and enhanced oxygen recovery
CN203144108U (en) Small pressure-swing adsorption nitrogen-making device
CN103071364B (en) System and method for trapping carbon dioxide from flue gases in multi-stage manner
CN201263957Y (en) Middle-top pressure equalizing high-purity nitrogen PSA series nitrogen production system according to concentration gradient
CN108236829B (en) From the content of CO2Separation of high purity CO from raw material gas2Method and apparatus
CN203728792U (en) High-purity methane purification device
CN104192807A (en) Oxygen generating equipment system and process flow thereof
CN101700876B (en) Nitrogen making method by pressure swing adsorption
JP5647388B2 (en) Blast furnace gas separation method and blast furnace gas separation apparatus
CN202823095U (en) High yield gas purifying device
CN202569906U (en) Dry gas pressure swing adsorption (PSA) ethylene-and-hydrogen recycling device in oil refinery
CN109432947A (en) The device and method of sulfur hexafluoride gas is purified from sulfur hexafluoride gas mixture
JP6163238B2 (en) Method for separating and obtaining oxygen from air by adsorption separation and apparatus therefor
CN209065416U (en) A kind of low pressure adsorbent oxygenerator
CN202237709U (en) Control system for pressure varying adsorption gas separating equipment
CN201930684U (en) Non-deep-cold transforming, adsorbing and separating device for oxygen and argon mixture
CN101531342B (en) Device and method for producing oxygen by means of pressure swing adsorption (PSA) by five beds
WO2021207909A1 (en) Method of movable pressure swing adsorption oxygen production device
CN101700877A (en) Process method for making nitrogen by pressure swing adsorption
CN206328151U (en) Plasma cut special nitrogen making machine
CN216038664U (en) Argon purification device based on series pressure swing adsorption separation technology

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20130923