CN203463238U - Small-scale wind driven generator tower - Google Patents

Small-scale wind driven generator tower Download PDF

Info

Publication number
CN203463238U
CN203463238U CN201320114300.3U CN201320114300U CN203463238U CN 203463238 U CN203463238 U CN 203463238U CN 201320114300 U CN201320114300 U CN 201320114300U CN 203463238 U CN203463238 U CN 203463238U
Authority
CN
China
Prior art keywords
tower
king
bar
pylon
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320114300.3U
Other languages
Chinese (zh)
Inventor
逄淑强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO RICHUAN PRECISION MACHINERY Co Ltd
Original Assignee
QINGDAO RICHUAN PRECISION MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO RICHUAN PRECISION MACHINERY Co Ltd filed Critical QINGDAO RICHUAN PRECISION MACHINERY Co Ltd
Priority to CN201320114300.3U priority Critical patent/CN203463238U/en
Application granted granted Critical
Publication of CN203463238U publication Critical patent/CN203463238U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • Y02E10/722

Abstract

The utility model provides a small-scale wind driven generator tower. The tower is used for overcoming the problems the wind driven generator tower in the prior art is difficult to lift up. The tower comprises a tower body and a lifting auxiliary device. The tower body comprises a main tower rod and an auxiliary tower rod. The main tower rod is provided with a first fixing hole, a main tower rod fixing device and a main tower hinge. The first fixing hole is connected with a first pulley. The main tower rod is fixed on a workbench through the main tower rod fixing device and the main tower rod hinge. The auxiliary tower rod comprises a second fixing hole and an auxiliary fixing device. The second fixing hole is connected with a second pulley. The auxiliary tower rod is fixed on the workbench through the auxiliary tower rod fixing device. The tower can be lifted up without a crane or other machinery. The tower is simple in structure, laborsaving in operation, and safe and reliable.

Description

A kind of small-sized wind power generator pylon
Technical field
The utility model relates to wind-driven generator field, refers to especially a kind of small-sized wind power generator pylon that need to just can not erect by crane or other motive power machine devices.
Background technique
At present, small-sized wind power generator is widely applied, by traditional agriculture, herd, fishing use, turned to gradually the fields such as industrial production, public service.Small-sized wind power generator pylon mainly contains independent pylon and two kinds of structures of zip pylon, wherein take free stand tower as many.The mode of holding up of wind-driven generator free stand tower mainly contains hoist and erects and utilize the gin pole carrying on pylon to hold up two kinds, and hoist is holded up this mode and is mainly used in the place that job site is more spacious; The place that mountain area, island etc. are remote and job site is narrow, the gin pole that general using pylon carries is holded up, gin pole is arranged on pylon below and meets at right angles with pylon, specific operation (as shown in Figure 3): whole tower post tilting is put on ground, then by tractive force, pylon is erected, and utilize drag-line and earth anchor to be fixed.But this setting mode needs larger tractive force, practical operation difficulty.
Model utility content
The utility model proposes a kind of small-sized wind power generator pylon, solved free stand tower in prior art and erect difficult problem.
The technical solution of the utility model is achieved in that
A small-sized wind power generator pylon, comprising: pylon body and setting auxiliary device; Pylon body comprises: king-tower bar and stand-by still bar; On king-tower bar, be provided with the first fixed hole, king-tower lever fixing apparatus and king-tower bar hinge, be connected with the first pulley on the first fixed hole, king-tower bar fixes on worktable by king-tower lever fixing apparatus and king-tower bar hinges fixing; Stand-by still bar comprises the second fixed hole and stand-by still lever fixing apparatus, is connected with the second pulley on the second fixed hole, and stand-by still bar is fixed on worktable by stand-by still lever fixing apparatus.
As a kind of preferred technological scheme, erect auxiliary device and comprise drag-line, cushion block and manual worm gear.
As a kind of preferred technological scheme, king-tower lever fixing apparatus is specially king-tower bar mounting flange; Stand-by still lever fixing apparatus is specially stand-by still bar mounting flange.
As a kind of preferred technological scheme, pylon also comprises: for binding the tower bar integrating apparatus of king-tower bar and stand-by still bar.
As a kind of preferred technological scheme, tower bar integrating apparatus comprises: fixing hoop and fixing bolt.
As a kind of preferred technological scheme, the first pulley and the second pulley can be 1 or a plurality of pulley, can be static pulley, can be also movable pulleys, can also be the combinations of static pulley and movable pulley.
As a kind of preferred technological scheme, one end of king-tower bar mounting flange and king-tower bar chain connection, the other end is fixed on worktable by stone bolt.
As a kind of preferred technological scheme, the first fixed hole is arranged on the middle and upper part of king-tower bar, and the second fixed hole is arranged on the top of stand-by still bar.
As a kind of preferred technological scheme, the height of the second fixed hole is lower than the height of the first fixed hole.
A kind of small-sized wind power generator pylon the utility model proposes, need not just can erect by crane or other machinery, simple in structure, easy and simple to handle, safe and reliable.In addition, the king-tower bar of this pylon and stand-by still bar are combined into an integral body by tower bar integrating apparatus, increased the intensity of pylon, improved the wind loading rating of wind power generating set, after erecting, do not need suspension cable to reinforce pylon, reduce difficulty of construction, also do not needed periodic maintenance drag-line tensioning mechanism simultaneously.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technological scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is a kind of small-sized wind power generator pylon the utility model proposes;
Fig. 2 is for erectting the operation chart of pylon shown in Fig. 1;
Fig. 3 is the existing pylon that utilizes gin pole to hold up.
In figure:
1, wind power generating set; 2, king-tower bar; 3, the first fixed hole; 4, the second fixed hole; 5, fixing hoop; 6, fixing bolt; 7, stand-by still bar; 8, king-tower bar hinge; 9, stone bolt; 10, cushion block; 11, manual worm gear; 12, the first pulley; 13, the second pulley.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technological scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiments.Embodiment based in the utility model, those of ordinary skills are not making the every other embodiment who obtains under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, the utility model embodiment provides a kind of small-sized wind power generator pylon, comprising: pylon body and setting auxiliary device; Pylon body comprises: king-tower bar 2 and stand-by still bar 7; On king-tower bar 2, be provided with on the first fixed hole 3, king-tower lever fixing apparatus and king-tower bar hinge 8, the first fixed holes 3 and be connected with the first pulley 12, king-tower bar 2 is fixed on worktable by king-tower lever fixing apparatus and king-tower bar hinge 8; Stand-by still bar 7 comprises the second fixed hole 4 and stand-by still lever fixing apparatus, is connected with the second pulley 13 on the second fixed hole 4, and stand-by still bar 7 is fixed on worktable by stand-by still lever fixing apparatus.
During specific operation, first by stand-by still lever fixing apparatus, stand-by still bar 7 is fixed on worktable; Secondly king-tower bar hinge 8 is fixed on worktable, the king-tower lever fixing apparatus of king-tower bar 2 bottoms is connected on king-tower bar hinge 8 and is tentatively fixed; Again, wind power generating set 1 is arranged on to the top of king-tower bar 2, by erect auxiliary device and be arranged on the first fixed hole 3 and the second fixed hole 4 on pulley, the king-tower bar 2 with generator set is holded up, finally tighten king-tower lever fixing apparatus.The pylon the utility model proposes is when erectting, simple to operate, has reduced the difficulty that pylon is erect, and has reduced pylon and has erect needed dynamics.
As a kind of preferred technological scheme, erect auxiliary device and comprise drag-line, cushion block 10 and manual worm gear 11.
As a kind of preferred technological scheme, king-tower lever fixing apparatus is specially king-tower bar mounting flange; Stand-by still lever fixing apparatus is specially stand-by still bar mounting flange.
Before setting, stand-by still bar 7 is fixed by stand-by still bar mounting flange, stand-by still bar mounting flange is fixed on worktable with stone bolt 9; Then, the king-tower bar mounting flange of king-tower bar 2 bottoms is connected on king-tower bar hinge 8, by king-tower bar mounting flange and king-tower bar hinge 8, king-tower bar 2 is tentatively fixed; By stand-by still bar 7 and setting auxiliary device, after pylon is holded up, tighten king-tower bar mounting flange.King-tower bar 2 is fixing respectively with stand-by still bar 7, and steadiness is high.Therefore, the pylon the utility model proposes, after erectting, does not need to use suspension cable to reinforce pylon, does not need periodic maintenance drag-line tensioning mechanism yet, has reduced the workload of periodic maintenance.
As a kind of preferred technological scheme, pylon also comprises: for binding the tower bar integrating apparatus of king-tower bar 2 and stand-by still bar 7.
As a kind of preferred technological scheme, tower bar integrating apparatus comprises: fixing hoop 5 and fixing bolt 6.
After pylon is erect, although utilized king-tower bar mounting flange and king-tower bar hinge 8, fix, utilize stand-by still bar mounting flange that stand-by still bar 7 is fixing on king-tower bar 2, but in order further to improve stability and the Security of pylon integral body, the utility model is also provided with tower bar integrating apparatus: be enclosed within the fixing hoop 5 on king-tower bar 2 and stand-by still bar 7, utilize fixing bolt 6 that fixing hoop 5 is tightened, king-tower bar 2 is just combined into as a whole with stand-by still bar 7 like this, increase the intensity of pylon, improved the wind loading rating of wind power generating set.
As a kind of preferred technological scheme, the first pulley 12 and the second pulley 13 can be 1 or a plurality of pulley, can be static pulley, can be also movable pulleys, can also be the combinations of static pulley and movable pulley.
Movable pulley can be economized the power of half, and static pulley can change power thrusts, in practical operation, can select according to site specific (as the weight of wind-driven generator integral body or working environment etc.) number and the kind of pulley.
As a kind of preferred technological scheme, one end of king-tower bar mounting flange is connected with king-tower bar hinge 8, and the other end is fixed on worktable by stone bolt 9.
As a kind of preferred technological scheme, the first fixed hole 3 is arranged on the middle and upper part of king-tower bar 2, and the second fixed hole 4 is arranged on the top of stand-by still bar 7.
As a kind of preferred technological scheme, the height of the second fixed hole 4 is lower than the height of the first fixed hole 3
Concrete operation step (as shown in Figure 2):
First, in the place of holding up in advance, first build a cement work platform, king-tower bar hinge 8 is arranged on worktable in advance;
Secondly, stand-by still bar 7 is fixed on cement work platform by stand-by still bar mounting flange and stone bolt 9; The king-tower bar mounting flange of king-tower bar 2 bottoms is connected on king-tower bar hinge 8, then king-tower bar 2 is placed on cushion block 10, wind power generating set 1 is installed to the top of king-tower bar 2;
Again, drag-line is first fixed on stand-by still bar 7, afterwards by drag-line respectively through the first pulley 12 and the second pulley 13 and around to manual worm gear 11.The handle shaking on manual worm gear 11 can be holded up king-tower bar 2;
Finally, when king-tower bar 2 is erected to while approaching vertical angle, utilize fixing bolt 6 that the fixing hoop 5 being enclosed within on king-tower bar 2 and stand-by still bar 7 is tightened, so just king-tower bar 2 and stand-by still bar 7 can be fixed into an integral body; , the king-tower bar mounting flange on king-tower bar 2 is tightened with stone bolt 9 meanwhile, the stand-by still bar mounting flange of stand-by still bar 7 bottoms is tightened with stone bolt 9.
A kind of small-sized wind power generator pylon the utility model proposes, need not just can erect by crane or other machinery, simple in structure, easy and simple to handle, safe and reliable.In addition, king-tower bar 2 and the stand-by still bar 7 of this pylon are combined into an integral body by tower bar integrating apparatus, increased the intensity of pylon, improved the wind loading rating of wind power generating set, after erecting, do not need suspension cable to reinforce pylon, reduce difficulty of construction, also do not needed periodic maintenance drag-line tensioning mechanism simultaneously.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (9)

1. a small-sized wind power generator pylon, is characterized in that, comprising: pylon body and setting auxiliary device;
Described pylon body comprises: king-tower bar (2) and stand-by still bar (7);
On described king-tower bar (2), be provided with the first fixed hole (3), king-tower lever fixing apparatus and king-tower bar hinge (8), on described the first fixed hole (3), be connected with the first pulley (12), described king-tower bar (2) is fixed on worktable by described king-tower lever fixing apparatus and described king-tower bar hinge (8);
Described stand-by still bar (7) comprises the second fixed hole (4) and stand-by still lever fixing apparatus, is connected with the second pulley (13) on described the second fixed hole (4), and described stand-by still bar (7) is fixed on worktable by described stand-by still lever fixing apparatus.
2. pylon according to claim 1, is characterized in that, described setting auxiliary device comprises drag-line, cushion block (10) and manual worm gear (11).
3. pylon according to claim 1, is characterized in that, described king-tower lever fixing apparatus is specially king-tower bar mounting flange; Described stand-by still lever fixing apparatus is specially stand-by still bar mounting flange.
4. pylon according to claim 1, is characterized in that, described pylon also comprises: for binding the tower bar integrating apparatus of described king-tower bar (2) and described stand-by still bar (7).
5. pylon according to claim 4, is characterized in that, described tower bar integrating apparatus comprises: fixing hoop (5) and fixing bolt (6).
6. the pylon described in any one according to claim 1-5, it is characterized in that, described the first pulley (12) can be 1 or a plurality of pulley with described the second pulley (13), can be static pulley, also can be movable pulley, can also be the combination of static pulley and movable pulley.
7. pylon according to claim 6, is characterized in that, one end of described king-tower bar mounting flange is connected with described king-tower bar hinge (8), and the other end is fixed on worktable by stone bolt (9).
8. pylon according to claim 7, is characterized in that, described the first fixed hole (3) is arranged on the middle and upper part of described king-tower bar (2), and described the second fixed hole (4) is arranged on the top of described stand-by still bar (7).
9. pylon according to claim 8, is characterized in that, the height of described the second fixed hole (4) is lower than the height of described the first fixed hole (3).
CN201320114300.3U 2013-03-13 2013-03-13 Small-scale wind driven generator tower Expired - Fee Related CN203463238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320114300.3U CN203463238U (en) 2013-03-13 2013-03-13 Small-scale wind driven generator tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320114300.3U CN203463238U (en) 2013-03-13 2013-03-13 Small-scale wind driven generator tower

Publications (1)

Publication Number Publication Date
CN203463238U true CN203463238U (en) 2014-03-05

Family

ID=50175607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320114300.3U Expired - Fee Related CN203463238U (en) 2013-03-13 2013-03-13 Small-scale wind driven generator tower

Country Status (1)

Country Link
CN (1) CN203463238U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609732A (en) * 2015-10-17 2017-05-03 扬州力德工程技术有限公司 Method for installing portable wind driven generator
CN111486058A (en) * 2020-04-13 2020-08-04 宁波长风风能科技有限公司 Fan mounting method and mounting clamp
CN111980866A (en) * 2019-05-22 2020-11-24 北京金风科创风电设备有限公司 Stay cable type tower, wind generating set and stay cable anchoring part
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609732A (en) * 2015-10-17 2017-05-03 扬州力德工程技术有限公司 Method for installing portable wind driven generator
CN111980866A (en) * 2019-05-22 2020-11-24 北京金风科创风电设备有限公司 Stay cable type tower, wind generating set and stay cable anchoring part
CN111486058A (en) * 2020-04-13 2020-08-04 宁波长风风能科技有限公司 Fan mounting method and mounting clamp
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower

Similar Documents

Publication Publication Date Title
CN204370830U (en) A kind of electric pole centralizer
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN203463238U (en) Small-scale wind driven generator tower
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
JP2022519449A (en) Installation of wind power generator, separation device and construction method using this
CN103630416B (en) The test platform of hoisting mechanism
CN103613031A (en) Simple transformer hoisting device
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN202997425U (en) Hoisting device capable of replacing suspension type insulator chain under electrified state
CN104695752A (en) Rapid repairing tower system and erection method thereof
CN105905815A (en) Work method of seating-type self-balance holding pole
CN202260265U (en) Wire stretcher for emergency rapid first-aid repair
CN203653080U (en) Mooring rope hanging mechanism capable of meeting motion of portal crane
CN206972169U (en) Drilling equipment
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN203289011U (en) Tension cross arm hoisting device
CN111157211A (en) Large-scale hydraulic pile hammer test bench
CN201723387U (en) Column type small-sized wind driven generator tower capable of automatically standing
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN110690589A (en) Grounding pile capable of being pulled up and pulled out quickly
CN202519621U (en) Steel hoop used for suspending support system
CN215803636U (en) Rack base for double-arm holding pole
CN105881734B (en) A kind of concrete pre-stress stake tensioning apparatus
CN207999218U (en) A kind of mast installation and rotary drilling rig
CN102535337A (en) Overwater bridge lifting equipment and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140305

Termination date: 20190313