CN203445460U - Prefabricated secondary combination equipment cabin - Google Patents

Prefabricated secondary combination equipment cabin Download PDF

Info

Publication number
CN203445460U
CN203445460U CN201320503784.0U CN201320503784U CN203445460U CN 203445460 U CN203445460 U CN 203445460U CN 201320503784 U CN201320503784 U CN 201320503784U CN 203445460 U CN203445460 U CN 203445460U
Authority
CN
China
Prior art keywords
cabin
frame
prefabricated
equipment
screen cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320503784.0U
Other languages
Chinese (zh)
Inventor
林传伟
陈国华
朱秀琴
林盛兴
宋志强
林文钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Electric Power Survey And Design Institute
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Original Assignee
Fujian Electric Power Survey And Design Institute
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Electric Power Survey And Design Institute, State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical Fujian Electric Power Survey And Design Institute
Priority to CN201320503784.0U priority Critical patent/CN203445460U/en
Application granted granted Critical
Publication of CN203445460U publication Critical patent/CN203445460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a prefabricated equipment cabin and particularly relates to a prefabricated secondary combination equipment cabin which comprises a cabin body. The structural element of the prefabricated equipment cabin is that the middle part of the cabin body is provided with an upper layer frame, a middle layer frame and a lower layer frame which are distributed in three rows from up to down, each layer frame is a single-row cubicle array, and each cubicle is equipped with an independent electrical equipment respectively. The prefabricated equipment cabin is characterized in that a frame type arrangement is employed especially, and the space in the cabin body is utilized to the maximum limit so as to achieve the purposes of reducing the number of cabins, saving space occupation and reducing the investment.

Description

Prefabricated secondary unit equipment cabin
Technical field
The utility model relates to a kind of prefabricated equipment compartment, particularly a kind of prefabricated secondary unit equipment cabin.
Background technology
In transformer station, secondary field connection, debugging work load are large, yet but need to wait for the construction of just marching into the arena after civil engineering, an electric inferior professional construction.So, just seriously restrict the construction period of engineering, limited project progress.At present, transformer station adopts prefabricated secondary unit equipment cabin, a whole set of secondary device is completed in factory to the work such as relevant distribution, debugging, and is transported to engineering site as the framework of an over all Integration.Yet existing prefabricated cabin screen cabinet arranges it is all to adopt single single file to arrange, the screen cabinet negligible amounts that causes a cabin to arrange, need to make a plurality of prefabricated cabin, and space availability ratio is too low; If strengthen prefabricated cabin lateral dimension to increase screen cabinet quantity, length can be subject to the restriction of road transport condition, cannot realize.
Summary of the invention
The purpose of this utility model is that according to the deficiencies in the prior art part, providing a kind of can make full use of space, and convenient-to-running prefabricated secondary unit equipment cabin.
The purpose of this utility model realizes by following approach:
Prefabricated secondary unit equipment cabin, includes cabin body, and its structural feature is, the centre of cabin body has upper strata frame, middle level frame and lower rack, three layers of frame are from top to bottom three row and distribute, and every layer of frame is single screen cabinet array, and each screen cabinet is separately installed with independently electric equipment.
What prefabricated secondary unit equipment described in the utility model cabin adopted is that rack is arranged, for single three row vertical distribution, at prefabricated cabin interior framework, is divided into independently upper, middle, and lower part, and is separately installed with independently power equipment.Like this, just take full advantage of the space of short transverse, and without the lateral dimension that strengthens prefabricated cabin, greatly increased screen cabinet quantity, and be not subject to the restriction of road transport condition, convenient and easy.
The utility model can further be specially:
Electric equipment cable outlet mouth in Ti Zhong, upper strata, cabin frame is positioned at upper strata frame top, and the electric equipment cable outlet of middle level frame and lower rack is positioned at the bottom of corresponding frame.
That is to say, the electric equipment cable of upper strata frame is by enclosure top outlet, in, the electric equipment cable of lower rack is by the cabling in the raised floor of rack.
The place ahead of cabin body is provided with glass door, and body rear, cabin take each screen cabinet as unit, back pullout (BPO) is set.
Like this, before frame, large-size glass door is set, can be convenient to observe the ruuning situation of equipment in cabinet, and the back pullout (BPO) that frame rear arranges, can be so that wiring and on-the-spot operation maintenance.
In sum, the utility model provides a kind of prefabricated secondary unit equipment cabin, adopts especially rack to arrange, can utilize to greatest extent body inner space, cabin, to reach, reduces cabin body quantity, saves and takes up an area, and reduces the object of investment.
Accompanying drawing explanation
Figure 1 shows that the structural representation in the prefabricated secondary unit equipment cabin described in the utility model most preferred embodiment.
Figure 2 shows that the plan structure schematic diagram of Fig. 1.
Below in conjunction with embodiment, the utility model is described further.
Embodiment
Most preferred embodiment:
With reference to accompanying drawing 1 and accompanying drawing 2, prefabricated secondary unit equipment cabin, include cabin body, the centre of cabin body has upper strata frame 1n, middle level frame 2n and lower rack 3n, three layers of frame are from top to bottom three row and distribute, every layer of frame is single screen cabinet array, and each screen cabinet is separately installed with independently electric equipment.
Electric equipment cable outlet mouth at Ti Zhong, upper strata, cabin frame 1n is positioned at upper strata frame top, and the electric equipment cable outlet of middle level frame 2n and lower rack 3n is positioned at the bottom of corresponding frame.
Before frame, large-size glass door is set, can be convenient to observe the ruuning situation of equipment in cabinet, and the back pullout (BPO) that frame rear arranges, can be so that wiring and on-the-spot operation maintenance.
Frame dimensions is 600mm deeply, and each screen cabinet compartment wide be 600mm.
It is same as the prior art that the utility model is not stated part.

Claims (3)

1. prefabricated secondary unit equipment cabin, includes cabin body, it is characterized in that, the centre of cabin body has upper strata frame, middle level frame and lower rack, three layers of frame are from top to bottom three row and distribute, and every layer of frame is single screen cabinet array, and each screen cabinet is separately installed with independently electric equipment.
2. prefabricated secondary unit equipment according to claim 1 cabin, it is characterized in that, electric equipment cable outlet mouth in Ti Zhong, upper strata, cabin frame is positioned at upper strata frame top, and the electric equipment cable outlet of middle level frame and lower rack is positioned at the bottom of corresponding frame.
3. prefabricated secondary unit equipment according to claim 1 cabin, is characterized in that, the place ahead of cabin body is provided with glass door, and body rear, cabin take each screen cabinet as unit, back pullout (BPO) is set.
CN201320503784.0U 2013-08-19 2013-08-19 Prefabricated secondary combination equipment cabin Expired - Fee Related CN203445460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320503784.0U CN203445460U (en) 2013-08-19 2013-08-19 Prefabricated secondary combination equipment cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320503784.0U CN203445460U (en) 2013-08-19 2013-08-19 Prefabricated secondary combination equipment cabin

Publications (1)

Publication Number Publication Date
CN203445460U true CN203445460U (en) 2014-02-19

Family

ID=50096479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320503784.0U Expired - Fee Related CN203445460U (en) 2013-08-19 2013-08-19 Prefabricated secondary combination equipment cabin

Country Status (1)

Country Link
CN (1) CN203445460U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104901221A (en) * 2015-06-25 2015-09-09 国家电网公司 Storage rack type secondary equipment compartment
CN109301704A (en) * 2018-09-05 2019-02-01 中国电建集团河北省电力勘测设计研究院有限公司 Intelligent substation prefabricated Intelligent control cabinet with cable arrangement standard interface cabin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104901221A (en) * 2015-06-25 2015-09-09 国家电网公司 Storage rack type secondary equipment compartment
CN109301704A (en) * 2018-09-05 2019-02-01 中国电建集团河北省电力勘测设计研究院有限公司 Intelligent substation prefabricated Intelligent control cabinet with cable arrangement standard interface cabin

Similar Documents

Publication Publication Date Title
CN104409989A (en) Rack type modular secondary screen cabinet in prefabricated cabin
CN203445460U (en) Prefabricated secondary combination equipment cabin
CN204369372U (en) A kind of lift car
CN204304264U (en) Prefabricated cabin interior framework formula modularization secondary screen cabinet
CN104295147B (en) A kind of framework being applicable to transformer station's outlet
CN203961363U (en) A kind of integrated form integrated base station
CN202098780U (en) Multilayer transport vehicle
CN204362452U (en) A kind of extensible universal cabinet and combined case thereof fast
CN205894699U (en) Pipeline rack for civil construction
CN207853383U (en) A kind of communication antenna terminal box
CN204835216U (en) A regulator cubicle and city rail vehicle that is used for city rail vehicle to bear weight of seat
CN204538483U (en) Rack bus-type prefabricated cabin
CN205469076U (en) Low -floor vehicle headwall
CN203722075U (en) A power distribution cabinet cable chamber back plate
CN206117286U (en) Power supply system's vertical lift stereo garage is synthesized with solar energy power supply and commercial power
CN203320501U (en) Novel wind shielding wall of drilling platform
CN203052111U (en) High-bearing force dispersing frame
CN204156372U (en) 10kV switch cubicle Vertical collection installs special frame
CN205254941U (en) Electric power tool places support frame
CN203891514U (en) Main transformer framework for omitting end support in substation
CN205938537U (en) SF6 steel bottle bracket with from movable pulley
CN203026039U (en) Process control system frame type mobile teaching platform
CN204174995U (en) A kind of framework being applicable to transformer station's outlet
CN203403704U (en) Transformer maintenance workshop
CN203871726U (en) Preassembled transformer substation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20200819