CN203429919U - Assembled-type antique looking pagoda top - Google Patents
Assembled-type antique looking pagoda top Download PDFInfo
- Publication number
- CN203429919U CN203429919U CN201320426180.0U CN201320426180U CN203429919U CN 203429919 U CN203429919 U CN 203429919U CN 201320426180 U CN201320426180 U CN 201320426180U CN 203429919 U CN203429919 U CN 203429919U
- Authority
- CN
- China
- Prior art keywords
- decorative pearl
- official cap
- antique
- pedestal
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an assembled-type antique looking pagoda top which comprises a top bead and a base. The top bead and the base are both hollow, a square steel tube is installed inside the top bead and the base, and the top bead and the base are integrally formed and are connected together in a bolting mode. According to the assembled-type antique looking pagoda top, manufacturing is simple, transportation is convenient, bolts are used for achieving mutual connection, mounting is convenient, the construction period is short, and due to the fact that non-traditional materials are used, environmental protection and portability are archived.
Description
Technical field
The utility model relates to a kind of building in the style of the ancients component technology field, especially a kind of assembling Bao Ding modelled after an antique.
Background technology
During precious top, be used in and collect together sharp building top, the Bao Ding in past connects and composes after partly being carried out by each split again, its way is according to model, to cut mill respectively with brick and wood, then with ironwork connection and cement injection, install, this kind of Bao Ding need to be used cement, mortar concrete perfusion anchoring when building that weight is large, labour intensity is high and installing at the scene, there is the problems such as surrounding enviroment, long in time limit, construction process requirement is high, operation is numerous and diverse that affect, therefore need us to this, to improve.Because precious top overall volume is larger, if transport again or install after Bao Ding is made to integral body, take up room large and inconvenient.
Utility model content
The utility model, for the deficiencies in the prior art, proposes a kind of assembling Bao Ding modelled after an antique, make simple, convenient transportation, and be inter-connected via a bolt joint easy for installationly, short construction period, utilizes non-traditional materials, environmental protection and light.
In order to realize above-mentioned utility model object, the utility model provides following technical scheme:
Assembling Bao Ding modelled after an antique, comprises the decorative pearl on top of an official cap and pedestal, and the described decorative pearl on top of an official cap and described pedestal are hollow, and at the described decorative pearl on top of an official cap and described base interior, a square steel pipe is installed,
Together with the described decorative pearl on top of an official cap is respectively one formation bolt with described pedestal.
Further, the longitudinal section of the described decorative pearl on top of an official cap is circular arc cap shape, and its bottom is provided with the junction plate in order to be connected with described pedestal.
Further, described pedestal is mixed by the circle being connected in turn from top to bottom, upper a tree, used in making timber for boats, upper owl, with a tight waist, lower waist, lower a tree, used in making timber for boats, Gui Jiao and base one form,
At described circle, mix the round bowl-type into turned upside down, its top is provided with the junction plate being connected with the described decorative pearl on top of an official cap.
The utility model assembling Bao Ding modelled after an antique, two parts decorative pearl on top of an official cap and pedestal are pasted and are formed by mould die sinking, make simple, the convenient transportation of two-part structure, and being inter-connected via a bolt joint easy for installationly, short construction period, utilizes non-traditional materials, adopt FRIM(magnesium cement) make environmental protection and light.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of assembling described in the utility model Bao Ding modelled after an antique.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail, the description of this part is only exemplary and explanatory, should not have any restriction to protection domain of the present utility model.
Assembling Bao Ding modelled after an antique as shown in Figure 1, comprises the decorative pearl on top of an official cap 1 and the pedestal that are hollow, and at the described decorative pearl on top of an official cap and described base interior, a square steel pipe 11 is installed, and by this square steel pipe 11, is connected with outside.The longitudinal section of the decorative pearl on top of an official cap 1 is circular arc cap shape, and its bottom is provided with the junction plate in order to be connected with pedestal.Pedestal is mixed 2 by the circle being connected in turn from top to bottom, upper a tree, used in making timber for boats 3, upper brave 4, with a tight waist 5, lower waist 6, lower a tree, used in making timber for boats 7, Gui angle 8 and base 9 one form.
The longitudinal section of circle mixed 2 is up-small and down-big inversion bowl-type, and its top is provided with the junction plate in order to be connected with the decorative pearl on top of an official cap 1.The longitudinal section of upper a tree, used in making timber for boats 3 is rectangle, the upper surface of upper a tree, used in making timber for boats 3 is connected with the soffit of circle mixed 2, upper brave 4 longitudinal section is up big and down small bowl-type, its upper surface is connected with the soffit of upper a tree, used in making timber for boats 3, with a tight waist 5 longitudinal section is rectangle, its upper surface is connected with upper brave 4 soffit, the longitudinal section of lower waist 6 is up-small and down-big inversion bowl-type, its upper surface is connected with 5 soffits with a tight waist, the longitudinal section of lower a tree, used in making timber for boats 7 is rectangle, its upper surface is connected with lower waist 6 soffits, the longitudinal section at Gui angle 8 is up-small and down-big inversion bowl-type, its upper surface is connected with lower a tree, used in making timber for boats 7 soffits, the longitudinal section of base 9 is rectangle, its upper surface is connected with the soffit at Gui angle 8.
The utility model is to adopt FRIM(magnesium cement) to make, integral body is hollow structure.
The utility model assembling Bao Ding modelled after an antique, two parts decorative pearl on top of an official cap 1 and pedestal are pasted and are formed by mould die sinking, make simple, the convenient transportation of two-part structure, and being inter-connected via a bolt joint easy for installationly, short construction period, utilizes non-traditional materials, adopt FRIM(magnesium cement) make environmental protection and light.
Claims (3)
1. assembling Bao Ding modelled after an antique, is characterized in that, comprises the decorative pearl on top of an official cap and pedestal, and the described decorative pearl on top of an official cap and described pedestal are hollow, and at the described decorative pearl on top of an official cap and described base interior, a square steel pipe is installed,
Together with the described decorative pearl on top of an official cap is respectively one formation bolt with described pedestal.
2. assembling Bao Ding modelled after an antique as claimed in claim 1, is characterized in that, the longitudinal section of the described decorative pearl on top of an official cap is circular arc cap shape, and its bottom is provided with the junction plate in order to be connected with described pedestal.
3. assembling Bao Ding modelled after an antique as claimed in claim 1, is characterized in that, described pedestal is mixed by the circle being connected in turn from top to bottom, upper a tree, used in making timber for boats, upper owl, with a tight waist, lower waist, lower a tree, used in making timber for boats, Gui Jiao and base one form,
At described circle, mix the round bowl-type into turned upside down, its top is provided with the junction plate being connected with the described decorative pearl on top of an official cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320426180.0U CN203429919U (en) | 2013-07-18 | 2013-07-18 | Assembled-type antique looking pagoda top |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320426180.0U CN203429919U (en) | 2013-07-18 | 2013-07-18 | Assembled-type antique looking pagoda top |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203429919U true CN203429919U (en) | 2014-02-12 |
Family
ID=50058967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320426180.0U Expired - Fee Related CN203429919U (en) | 2013-07-18 | 2013-07-18 | Assembled-type antique looking pagoda top |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203429919U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881850A (en) * | 2019-03-12 | 2019-06-14 | 北京市园林古建设计研究院有限公司 | A kind of pseudo-classic architecture Bao Ding |
CN114941408A (en) * | 2022-06-01 | 2022-08-26 | 中国五冶集团有限公司 | Construction method of archaized building roof pagoda |
-
2013
- 2013-07-18 CN CN201320426180.0U patent/CN203429919U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881850A (en) * | 2019-03-12 | 2019-06-14 | 北京市园林古建设计研究院有限公司 | A kind of pseudo-classic architecture Bao Ding |
CN114941408A (en) * | 2022-06-01 | 2022-08-26 | 中国五冶集团有限公司 | Construction method of archaized building roof pagoda |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203420389U (en) | Environment-friendly built-in floor die core | |
CN204804038U (en) | Air film reinforced concrete shell structure of building | |
CN203429919U (en) | Assembled-type antique looking pagoda top | |
CN201933740U (en) | Decorating ceramic tile | |
CN204983237U (en) | Framework composition outer wall system | |
CN206554324U (en) | Realize that the Stone brick component of comprehensive fixation is assembled into the structure of wall, dam body | |
CN204609353U (en) | Unsettled building structure | |
CN204080656U (en) | A kind of sound barrier wall | |
CN204001214U (en) | High accuracy capital embedded board | |
CN203247750U (en) | Assembled type cement brick | |
CN206928435U (en) | Load-bearing pillar and the attachment structure on basis | |
CN206090817U (en) | Steel construction assemblyization house | |
CN204753932U (en) | Can assemble into floor that ceiling takes shape | |
CN207363149U (en) | A kind of board house exterior wall external corner | |
CN205907685U (en) | Bury pull box prefabricatedly | |
CN204492019U (en) | A kind of leading ridge | |
CN204609294U (en) | A kind of radian template for radian pillar formwork | |
CN204238830U (en) | A kind of gate, assembly type building site | |
CN201400962Y (en) | Archaizing building connecting body pagoda top | |
CN202324317U (en) | Brick used for building | |
CN202767229U (en) | Hollow building coping structure | |
CN203603474U (en) | Formwork anti-floating system | |
CN202416705U (en) | Wood plastic upright | |
CN203393900U (en) | Light foam concrete hanging beam | |
CN202745073U (en) | Assemble type prefabricated reinforcement concrete inspection well closing section connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 Termination date: 20210718 |