CN203420283U - 一种隧道明挖段深基坑 - Google Patents

一种隧道明挖段深基坑 Download PDF

Info

Publication number
CN203420283U
CN203420283U CN201320369254.1U CN201320369254U CN203420283U CN 203420283 U CN203420283 U CN 203420283U CN 201320369254 U CN201320369254 U CN 201320369254U CN 203420283 U CN203420283 U CN 203420283U
Authority
CN
China
Prior art keywords
concrete
foundation ditch
deep foundation
cut section
open cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320369254.1U
Other languages
English (en)
Inventor
杨平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320369254.1U priority Critical patent/CN203420283U/zh
Application granted granted Critical
Publication of CN203420283U publication Critical patent/CN203420283U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本实用新型公开了一种隧道明挖段深基坑,该基坑为在两排混凝土桩中间设置拱形通道。混凝土桩的顶端设置钢筋混凝土冠梁,混凝土桩的侧面设有锚索;拱形通道的底面为面层,面层下铺设粘结层,粘结层下铺设钢筋砼层,钢筋砼层下铺设基层。该基坑在施工过程中将支护桩与锚拉式支护结构相结合,形成一个整体,架设支撑可以与后续开挖土方同时进行,从而就可以合理的分配施工空间,提高整体的施工进度,进而有效地保证了工期,并且还避免了工作机械与支撑之间碰撞,施工过程中能有效地控制基坑对周围环境的影响,同时确保基坑自身的稳定,保证了施工安全。

Description

一种隧道明挖段深基坑
技术领域
本实用新型属于建筑施工领域,尤其涉及一种隧道明挖段深基坑。
背景技术
随着城市化步伐的加快,在建(构)筑物林立的市区修建深大基坑已成为一种必然,深基坑开挖在保证自身坑壁稳定的前提下,还要确保相邻建筑物的安全。桩锚支护结构适用于基坑周围施工场地狭小、邻近基坑周边有建筑物的情况。一般在施工过程中不能有效地控制基坑对周围环境的影响,同时基坑自身的稳定差。
实用新型内容
本实用新型的目的在于提供一种隧道明挖段深基坑,旨在解决施工过程中不能有效地控制基坑对周围环境的影响,同时基坑自身的稳定差的问题。
本实用新型是这样实现的:一种隧道明挖段深基坑,基坑为在两排混凝土桩中间设置拱形通道。混凝土桩的顶端设置钢筋混凝土冠梁,混凝土桩的侧面设有锚索;拱形通道的底面为面层,面层下铺设粘结层,粘结层下铺设钢筋砼层,钢筋砼层下铺设基层。
进一步,混凝土桩采用φ1000mm的钻头钻孔,用C30混凝土浇注,受力钢筋采用HRB335钢筋;
进一步,冠梁为80cm*100cm;
进一步,混凝土桩侧面采用4道预应力锚索锚固,长度分别为8m、9m、10m、11m,锚索竖向间距为3.5m;
进一步,面层由9cm厚沥青砼构成;
进一步,粘结层由1cm土工布构成;
进一步,钢筋砼层为23cm厚;
进一步,基层由15cm厚的C20混凝土构成;
进一步,拱形通道的拱体由70cm厚的C25混凝土构成。
本实用新型提供得隧道明挖段深基坑,该基坑在施工过程中将支护桩与锚拉式支护结构相结合,形成一个整体,架设支撑可以与后续开挖土方同时进行,从而就可以合理的分配施工空间,提高整体的施工进度,进而有效地保证了工期,并且还避免了工作机械与支撑之间碰撞,施工过程中能有效地控制基坑对周围环境的影响,同时确保基坑自身的稳定,保证了施工安全。
附图说明
图1是本实用新型提供的隧道明挖段深基坑结构示意图;
图中:1、混凝土桩;2、拱形通道;3、冠梁;4、锚索;5、面层;6、粘结层;7、钢筋砼层;8、基层。
具体实施方式
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。
图1是本实用新型提供的一种隧道明挖段深基坑结构示意图。为了便于说明,仅仅示出了与本实用新型相关的部分。该基坑为在两排混凝土桩1中间设置拱形通道2。混凝土桩1的顶端设置钢筋混凝土冠梁3,混凝土桩1的侧面设有锚索4;拱形通道2的底面为面层5,面层5下铺设粘结层6,粘结层6下铺设钢筋砼层7,钢筋砼层7下铺设基层8。
混凝土桩1采用φ1000mm的钻头钻孔,用C30混凝土浇注,受力钢筋采用HRB335钢筋;混凝土桩1的顶端设置80cm*100cm钢筋混凝土冠梁3;混凝土桩1侧面采用4道预应力锚索4锚固,长度分别为8m、9m、10m、11m,锚索4竖向间距为3.5m;混凝土桩1背后面采用高压旋喷咬合桩形成止水帷幕,旋喷咬合桩桩径80cm,桩心纵向间距130cm。基坑内侧土体开挖后在钻孔桩之间喷射10cm厚C20混凝土。拱形通道2的底面为由9cm厚沥青砼构成的面层5,面层5下铺设由1cm土工布构成的粘结层6,粘结层6下铺设23cm厚的钢筋砼层7,钢筋砼层7下铺设由15cm厚的C20混凝土构成的基层8。
本实用新型提供了一种隧道明挖段深基坑,该基坑在施工过程中将支护桩与锚拉式支护结构相结合,形成一个整体,架设支撑可以与后续开挖土方同时进行,从而就可以合理的分配施工空间,提高整体的施工进度,进而有效地保证了工期,并且还避免了工作机械与支撑之间碰撞,施工过程中能有效地控制基坑对周围环境的影响,同时确保基坑自身的稳定,保证了施工安全。
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。

Claims (9)

1.一种隧道明挖段深基坑,其特征在于,该基坑为在两排混凝土桩中间设置拱形通道;混凝土桩的顶端设置钢筋混凝土冠梁,混凝土桩的侧面设有锚索;拱形通道的底面为面层,面层下铺设粘结层,粘结层下铺设钢筋砼层,钢筋砼层下铺设基层。
2.如权利要求1所述的隧道明挖段深基坑,其特征在于,混凝土桩采用φ1000mm的钻头钻孔,用C30混凝土浇注,受力钢筋采用HRB335钢筋。
3.如权利要求1所述的隧道明挖段深基坑,其特征在于,冠梁为80cm*100cm。
4.如权利要求1所述的隧道明挖段深基坑,其特征在于,混凝土桩侧面采用4道预应力锚索锚固,长度分别为8m、9m、10m、11m,锚索竖向间距为3.5m。
5.如权利要求1所述的隧道明挖段深基坑,其特征在于,面层由9cm厚沥青砼构成。
6.如权利要求1所述的隧道明挖段深基坑,其特征在于,粘结层由1cm土工布构成。
7.如权利要求1所述的隧道明挖段深基坑,其特征在于,钢筋砼层为23cm厚。
8.如权利要求1所述的隧道明挖段深基坑,其特征在于,基层由15cm厚的C20混凝土构成。
9.如权利要求1所述的隧道明挖段深基坑,其特征在于,拱形通道的拱体由70cm厚的C25混凝土构成。
CN201320369254.1U 2013-06-26 2013-06-26 一种隧道明挖段深基坑 Expired - Fee Related CN203420283U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320369254.1U CN203420283U (zh) 2013-06-26 2013-06-26 一种隧道明挖段深基坑

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320369254.1U CN203420283U (zh) 2013-06-26 2013-06-26 一种隧道明挖段深基坑

Publications (1)

Publication Number Publication Date
CN203420283U true CN203420283U (zh) 2014-02-05

Family

ID=50019383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320369254.1U Expired - Fee Related CN203420283U (zh) 2013-06-26 2013-06-26 一种隧道明挖段深基坑

Country Status (1)

Country Link
CN (1) CN203420283U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343549A (zh) * 2013-07-15 2013-10-09 杨平 一种隧道明挖段深基坑及设计方法
CN106013238A (zh) * 2016-05-31 2016-10-12 中铁第四勘察设计院集团有限公司 一种软弱地层大覆土明挖隧道沉降控制方法
CN106968690A (zh) * 2017-04-20 2017-07-21 中冶建工集团有限公司 坍塌土质的隧道施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343549A (zh) * 2013-07-15 2013-10-09 杨平 一种隧道明挖段深基坑及设计方法
CN106013238A (zh) * 2016-05-31 2016-10-12 中铁第四勘察设计院集团有限公司 一种软弱地层大覆土明挖隧道沉降控制方法
CN106013238B (zh) * 2016-05-31 2018-10-16 中铁第四勘察设计院集团有限公司 一种软弱地层大覆土明挖隧道沉降控制方法
CN106968690A (zh) * 2017-04-20 2017-07-21 中冶建工集团有限公司 坍塌土质的隧道施工方法

Similar Documents

Publication Publication Date Title
CN105041349B (zh) 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法
CN102226403B (zh) 地铁大跨度车站主体拱盖法施工方法及车站主体结构
CN102758632B (zh) 岩质地层双初支分层法修建大型地下结构的方法
CN102605792B (zh) 多排迷你桩挡土围护结构及施工工艺
CN103195069B (zh) 预应力式双排桩强约束深基坑支护方法
CN204418187U (zh) 地铁保护区域土钉墙结合双排桩深基坑复合支护结构
CN110318770A (zh) 一种公路隧道半明半暗进洞施工方法
CN203905018U (zh) 组合双排桩结合斜向锚杆支护体系
CN103821167A (zh) 一种地铁车站主体的施工方法
CN103898916B (zh) 迷你桩复合式支挡结构及施工方法
CN105064397A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法
CN201991017U (zh) 基于拱盖法施工成型的地铁大跨度车站主体结构
CN102808628A (zh) 大断面巷道过导水断层的施工方法
CN103774675A (zh) 组合双排桩联合竖向预应力锚杆支护体系及其施工方法
CN102691302B (zh) 一种用于深基坑支护的混凝土结构
CN102322266A (zh) 一种隧道开挖施工方法
CN105201516A (zh) 一种地铁车站主体结构及其四联拱pba暗挖施工方法
CN105370289A (zh) 一种复杂环境既有管线超长浅埋暗挖施工方法
CN206034454U (zh) 一种支护结构
CN105089670A (zh) 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法
CN103114595A (zh) 支护桩预留核心土双支墩斜内撑基坑支护方法及装置
CN104653188A (zh) 一种在暗挖风道内设置大直径盾构接收和始发井的方法
CN203420283U (zh) 一种隧道明挖段深基坑
CN203716156U (zh) 一种深基坑内设坑中坑城门洞式出土施工结构
CN205776250U (zh) 一种设有地拉锚型式的双排桩结构体系

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Yang Ping

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Yang Ping

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140205

Termination date: 20180626