CN203419944U - Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas - Google Patents

Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas Download PDF

Info

Publication number
CN203419944U
CN203419944U CN201320415140.6U CN201320415140U CN203419944U CN 203419944 U CN203419944 U CN 203419944U CN 201320415140 U CN201320415140 U CN 201320415140U CN 203419944 U CN203419944 U CN 203419944U
Authority
CN
China
Prior art keywords
electric field
blast furnace
furnace gas
spray header
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320415140.6U
Other languages
Chinese (zh)
Inventor
兰文龙
胡祥东
陈耀华
唐令
朱小棣
张维
朱彩飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cecep Ningxia New Energy Resources Joint Stock Co ltd
Original Assignee
CHONGQING CECEP SANFENG ENERGY Co Ltd
Middle Energy-Saving Industrial Power Conservation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CECEP SANFENG ENERGY Co Ltd, Middle Energy-Saving Industrial Power Conservation Ltd filed Critical CHONGQING CECEP SANFENG ENERGY Co Ltd
Priority to CN201320415140.6U priority Critical patent/CN203419944U/en
Application granted granted Critical
Publication of CN203419944U publication Critical patent/CN203419944U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model relates to the technical field of electric precipitation, in particular to a device for optimizing an electric field of a wet electrostatic precipitator for blast furnace gas. The device comprises a casing provided with a gas inlet, a gas outlet and a drain outlet, wherein dedusting pole plates are arranged inside the casing, a spraying water inlet is formed in the upper part of the casing, a spraying pipe connected with the spraying water inlet is arranged at the upper part of the inside of the casing and provided with a sprayer, and the device further comprises a self-cleaning filter arranged on the spraying pipe. According to the technical scheme, the adopted device for optimizing the electric field of the wet electrostatic precipitator for blast furnace gas has the advantages of low maintenance cost and good dust removal effect.

Description

Blast furnace gas wet-esp electric Field Optimization device
Technical field
The utility model relates to electrostatic precipitation technology field, is specifically related to a kind of blast furnace gas wet-esp electric Field Optimization device.
Background technology
Electric precipitator principle of work is that dusty gas enters by electric precipitator entrance, enters equably electric field after airflow-distribution board current-sharing.After making water fogging, the nozzle that is configured in gas feed and electric field top sprays in the coal gas of the electric field of flowing through, the temperature, pressure, the humidity that make to be cleaned coal gas reach purification requirement, when containing suspension liquid particle, enter after electric field, by charged and trapped by dust collecting electrode under the effect of electrical forces, and flow in ash bucket along dust collecting electrode, then by ash bucket, enter settling tank, and coal gas after purifying is discharged from electric precipitator outlet by electric field.
Adopt traditional blast furnace gas wet-esp to have following problem, 1, no matter be underground water, tap water or pure water, the impurity that contains various compositions and mineral substance in various degree all, therefore, for spray into atomized water clear up the spray header of dedusting pole plate can be because of the long-term precipitation plug nozzle of underground water or tap water impurity, need regularly clear up it, increase later stage cleaning maintenance cost; Because the impurity that spray water is contained can be distinguished to some extent because of the difference of water quality, and if spray water impurity is more, in the process of cleaning dedusting pole plate, in water, impurity is brought into dedusting area, thick laying dust on dedusting pole plate is combined, and not only dust removing effects does not reach set(ting)value and also strengthened dedusting difficulty; 2, the hydraulic pressure size due to spray header can have influence on the cleaning effect to dedusting pole plate, and traditional mode is not all controlled the hydraulic pressure size of spray header, causes water resource waste, affects dust removing effects.
Therefore, the high and dust removing effects of cleaning apparatus maintenance cost expense is bad is urgent problem in current blast furnace gas wet-esp electric Field Optimization.
Utility model content
It is low that the technical problems to be solved in the utility model is to provide a kind of maintenance cost, the blast furnace gas wet-esp electric Field Optimization device of good dedusting effect.
In order to solve the problems of the technologies described above, the utility model provides blast furnace gas wet-esp electric Field Optimization device, comprise the housing that is provided with inlet mouth, air outlet and sewage draining exit, described enclosure interior is provided with dedusting pole plate, described housing top is provided with spray water entrance and its inner upper is provided with the spray header being connected with spray water entrance, and described spray header is provided with shower nozzle, wherein, also comprise self-cleaning filter, described self-cleaning filter is located on described spray header.
Adopt the blast furnace gas wet-esp electric Field Optimization device of technique scheme to have following advantage: 1, owing to being provided with self-cleaning filter on spray header, can improve spray water water quality, spacing is cleaned the effect of incrustation scale, therefore avoided stopping up because of the formation of incrustation scale the situation of shower nozzle, make spray header current smooth and easy, also reduced the trouble of artificial cleaning, saved the maintenance cost in later stage use procedure simultaneously; Meanwhile, due to the raising of water quality, avoid the impurity in spray water and again flowed into the situation that the thick laying dust of dedusting region on dedusting pole plate is combined, dust removing effects is improved, also reduced dedusting difficulty simultaneously; 2, owing to being provided with differential pressure meter on spray header, to the hydraulic pressure of spray water, can carry out suitable adjusting, control as required hydraulic pressure and also further saved water cost, also can reach good dust removing effects simultaneously.
As preferred version, consider the comprehensive of air inlet, exhaust and blowdown, described inlet mouth, air outlet and sewage draining exit are uncovered inside funnel-form.
As preferred version, consider the flexible control to spray water hydraulic pressure, also comprise differential pressure meter, described differential pressure meter is connected with described spray header.
As preferred version, consider that spray water rinses dedusting pole plate comprehensive, at least two, described shower nozzle.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment blast furnace gas wet-esp electric Field Optimization device;
Wherein: housing 1; Inlet mouth 11; Air outlet 12; Sewage draining exit 13; Dedusting pole plate 2; Spray water entrance 3; Spray header 4; Shower nozzle 5; Self-cleaning filter 6; Differential pressure meter 7.
embodiment
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
As shown in Figure 1, a kind of blast furnace gas wet-esp electric Field Optimization device, comprise the housing 1 that is provided with inlet mouth 11, air outlet 12 and sewage draining exit 13, housing 1 inside is provided with dedusting pole plate 2, housing 1 top is provided with spray water entrance 3 and its inner upper is provided with the spray header 4 being connected with spray water entrance 3, and spray header 4 is provided with shower nozzle 5, wherein, also comprise self-cleaning filter 6, self-cleaning filter 6 is located on spray header 4.In addition, consider the comprehensive of air inlet, exhaust and blowdown, inlet mouth 11, air outlet 12 and sewage draining exit 13 are uncovered inside funnel-form, consider the flexible control to spray water hydraulic pressure, also comprise differential pressure meter 7, differential pressure meter 7 is connected with spray header 4, considers that spray water rinses dedusting pole plate 2 comprehensive, and shower nozzle 5 is four.
In the dust removal process of actual blast furnace gas, first the gas of composite grain thing enters housing 1 inside from inlet mouth 11, and by dedusting pole plate 2, the particulate matter in blast furnace gas is removed, last clean gas is got rid of by air outlet 12, and 6 pairs of spray waters of self-cleaning filter of being located on spray header 4 are done filtration treatment in advance, spray water after filtering is sprayed by shower nozzle 5, rinse dedusting pole plate 2, the spray water that has absorbed particulate matter is discharged by sewage draining exit 13, has completed the dedusting work to blast furnace gas.
Above-described is only preferred implementation of the present utility model; should be understood that; for a person skilled in the art; do not departing under the prerequisite of the utility model structure; can also make some distortion and improvement; these also should be considered as protection domain of the present utility model, and these can not affect effect and practical applicability that the utility model is implemented.

Claims (4)

1. a blast furnace gas wet-esp electric Field Optimization device comprises and is provided with inlet mouth, air outlet and sewage draining exit, housing, described enclosure interior is provided with dedusting pole plate, described housing top is provided with spray water entrance and its inner upper is provided with the spray header being connected with spray water entrance, described spray header is provided with shower nozzle, it is characterized in that: also comprise self-cleaning filter, described self-cleaning filter is located on described spray header.
2. blast furnace gas wet-esp electric Field Optimization device according to claim 1, is characterized in that: described inlet mouth, air outlet and sewage draining exit are uncovered inside funnel-form.
3. blast furnace gas wet-esp electric Field Optimization device according to claim 2, is characterized in that: also comprise differential pressure meter, described differential pressure meter is connected with described spray header.
4. according to the blast furnace gas wet-esp electric Field Optimization device described in claim 1 or 3, it is characterized in that: at least two, described shower nozzle.
CN201320415140.6U 2013-07-12 2013-07-12 Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas Expired - Lifetime CN203419944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320415140.6U CN203419944U (en) 2013-07-12 2013-07-12 Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320415140.6U CN203419944U (en) 2013-07-12 2013-07-12 Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas

Publications (1)

Publication Number Publication Date
CN203419944U true CN203419944U (en) 2014-02-05

Family

ID=50019044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320415140.6U Expired - Lifetime CN203419944U (en) 2013-07-12 2013-07-12 Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas

Country Status (1)

Country Link
CN (1) CN203419944U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170332A (en) * 2015-10-15 2015-12-23 江苏亨通光电股份有限公司 Dedusting tower for waste gas treatment
CN106622668A (en) * 2017-01-18 2017-05-10 山东艾派仕环保科技有限公司 Low temperature plasma waste gas dedusting device
CN110586325A (en) * 2019-08-07 2019-12-20 江苏瑞洁环境工程科技有限责任公司 Efficient self-cleaning wet-type electric dust removal system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170332A (en) * 2015-10-15 2015-12-23 江苏亨通光电股份有限公司 Dedusting tower for waste gas treatment
CN106622668A (en) * 2017-01-18 2017-05-10 山东艾派仕环保科技有限公司 Low temperature plasma waste gas dedusting device
CN110586325A (en) * 2019-08-07 2019-12-20 江苏瑞洁环境工程科技有限责任公司 Efficient self-cleaning wet-type electric dust removal system

Similar Documents

Publication Publication Date Title
CN104437068B (en) A kind of high-efficiency wet-desulfurizing dust pelletizing system and method
CN104190543B (en) A kind of wet electrical dust precipitator and comprise the electric precipitation desulfurizer of this wet electrical dust precipitator
CN101816975A (en) Wet-dry mixing electric dust remover
CN103962240A (en) Wet type electric precipitation device and method for removing fine particulate matters in smoke desulfurized by wet process
CN103056031A (en) Ash water circulation treatment system of wet-type electric dust remover
CN204320089U (en) A kind of high-efficiency wet-desulfurizing dust pelletizing system
CN204122244U (en) A kind of wet electrical dust precipitator and comprise the electric precipitation desulfurizer of this wet electrical dust precipitator
CN105057101A (en) Cylindrical vertical wet-type explosion-proof and voltage-resistant electric precipitator
CN105413871B (en) A kind of hot electrostatic precipitator subregion spray coupling moisture film rinses deashing technique and device
CN201906655U (en) Wet process-static electricity secondary dedusting and desulphurization device
CN103041923A (en) Process of recycling ash removing water of wet electrostatic precipitator in thermal power plant
CN104190540A (en) Dry-wet mixed electric precipitation device
CN203419944U (en) Device for optimizing electric field of wet electrostatic precipitator for blast furnace gas
CN105457407A (en) Double-filtration exhaust gas purification equipment
CN201644221U (en) Dry-wet mixed electrical dust remover
CN203853168U (en) Device for removing PM2.5 from wet flue gas
CN102586523B (en) Blast furnace gas purification plant
CN207462906U (en) A kind of fresh air system purifying and dedusting device
CN104841221A (en) Air purifying device
CN204485562U (en) A kind of gas and oil separating plant
CN203710771U (en) Filter element type automatic back-flushing filtering device
CN203235567U (en) High-efficiency wet method static dust collector
CN202519281U (en) Blast furnace gas purification device
CN205627500U (en) High -efficient dust treatment device
CN104436974A (en) Device for purifying waste gas of boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160810

Address after: 750001 the Ningxia Hui Autonomous Region Province jinfeng District of Yinchuan City, Lane No. 156

Patentee after: CECEP NINGXIA NEW ENERGY RESOURCES JOINT STOCK Co.,Ltd.

Address before: 100041, room 3, building 3, No. 6796, West well road, Badachu science and Technology Park, Beijing, Shijingshan District

Patentee before: CECEP INDUSTRIAL ENERGY CONSERVATION Co.,Ltd.

Patentee before: CHONGQING CECEP SANFENG ENERGY Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20140205

CX01 Expiry of patent term