CN203407367U - Ecological frog raising pond - Google Patents

Ecological frog raising pond Download PDF

Info

Publication number
CN203407367U
CN203407367U CN201320389436.5U CN201320389436U CN203407367U CN 203407367 U CN203407367 U CN 203407367U CN 201320389436 U CN201320389436 U CN 201320389436U CN 203407367 U CN203407367 U CN 203407367U
Authority
CN
China
Prior art keywords
pond
frog
raising
ecology
supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320389436.5U
Other languages
Chinese (zh)
Inventor
刘春军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cultivation Co Ltd Of Liu Chun Army Of Mianzhu City
Original Assignee
Cultivation Co Ltd Of Liu Chun Army Of Mianzhu City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cultivation Co Ltd Of Liu Chun Army Of Mianzhu City filed Critical Cultivation Co Ltd Of Liu Chun Army Of Mianzhu City
Priority to CN201320389436.5U priority Critical patent/CN203407367U/en
Application granted granted Critical
Publication of CN203407367U publication Critical patent/CN203407367U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Farming Of Fish And Shellfish (AREA)

Abstract

The utility model discloses a raising pond and particularly relates to an ecological frog raising pond, belonging to the technical field of raising infrastructure and equipment. The ecological frog raising pond comprises a pond body, wherein the pond body is provided with a shallow water area and a deep water area which are transitioned through a slope. The ecological frog raising pond disclosed by the utility model is delicate in design, so that one raising pond can be used for a whole process of laying eggs, hatching eggs, raising tadpoles, intensively taming and feeding froglets and obtaining adult frogs in frog growth, thereby improving utilization rate of the infrastructure and effectively avoiding influences on growth of froglets after the froglets are transferred to the pond; and meanwhile, the raising pond can be used for providing three-dimensional water depth and water temperature for the frogs, so that the raising pond is more suitable for raising the frogs, raising efficiency can be effectively improved and practicability is strong.

Description

A kind of ecology is supported frog pond
Technical field
The utility model relates to a kind of culturing pool, and particularly a kind of ecology is supported frog pond, belongs to cultivation capital construction and equipment technical field.
Background technology
Batrachia meat products matter is bright, nutritious and be subject to liking of people.But the process of batrachia growth has particularity than other animals, tradition cultivation is generally fed in different raising ponds according to the different stages, raises pond and also adopts traditional vertical wall structures design, and the degree of depth of whole pond body is consistent.Because the growth of batrachia has seasonality, need the nursing pond of different depth to feed the frog seedling of different phase, in the different seasons of growth, can cause the idle of other pond bodies; Moving in the process of pond of frog seedling simultaneously, because difference is raised the variation of pond water quality, makes the laundering period that frog seedling need to be longer, particularly in the seedling stage, even causes the death of seedling; This integral body is with the design in the raising pond of the degree of depth, and the temperature of the water body in whole pond is all consistent, can not for the frog of different physique conditions, provide different habitats, has also restricted culture benefit.
Summary of the invention
Goal of the invention of the present utility model is: for the problem of above-mentioned existence, provide a kind of ecology of Multifunction to support frog pond, to realize one, raise that pond can be used in that frog in batrachia growth lays eggs, ovum hatching, tadpole are raised, froglet is concentrated and tames and dociles food and the overall process that becomes the frog, improve the availability of infrastructure, the phase that is not suitable with of avoiding frog seedling to move behind pond affects its survival and cultivation efficiency, simultaneously, this pond body can also provide the three-dimensional depth of water and water temperature for batrachia, make to be more suitable for the raising of batrachia, improve cultivation efficiency.
The technical solution adopted in the utility model is as follows:
Support a frog pond, comprise pond body, described pond body is provided with phytal zone and profundal zone, and described phytal zone and profundal zone are through domatic transition.
Ecology of the present utility model is supported frog pond, described domatic curved structure.
Ecology of the present utility model is supported frog pond, the described domatic ladder-type structure that is.
Further, described ladder-type structure domatic, the height of each ladder is 1-20cm.
Ecology of the present utility model is supported frog pond, and described pond body is also provided with feeding platform.
Further, the top of described feeding platform is provided with sunshade net.
Ecology of the present utility model is supported frog pond, the surface of described pond body bottom be equipped with one can pull-up fish for net.
Ecology of the present utility model is supported frog pond, and body bottom in described pond is also provided with impervious barrier.
Ecology of the present utility model is supported frog pond, and the degree of depth of described profundal zone is 20-100cm.
Span between described phytal zone to profundal zone is 100-300cm.
Ecology of the present utility model is supported frog pond, described pond body is provided with phytal zone and the profundal zone through domatic transition, than all consistent designs of the traditional tank body All Ranges degree of depth, this structure can provide different water depths for batrachia, to adapt to the demand of its different vegetative stages to water depth, phytal zone design meets frog and lays eggs in phytal zone, the custom of spawn incubation and tadpole food, making raising of the present utility model pond can be used in frog in batrachia growth lays eggs, ovum hatching, tadpole is raised, froglet is concentrated and tames and dociles food and the overall process that becomes the frog, effectively avoided traditional pond process of moving to bring adverse influence to its growth, also improved the availability of infrastructure, simultaneously, the design of this many water depths, also make the distribution of water temperature of whole pond body there is the variation of certain gradient, utilize this variation that the different spaces of perching can be provided for different cultivation individualities, can also utilize the inconsistency of this water depth, under different weather conditions, maintain cleverly the relatively stable of water body warm area.The design of domatic transition, can adopt inclined plane structural transition, arcwall face structural transition or ladder face structure transition, and arcwall face structure can be divided into again outer convex globoidal or inner concave arc surface structure.
The feeding platform of pond body setting makes batrachia to feeding platform, go feed and to have a rest, the solar protection devices arranging on it can be beneficial to its feed and growth for batrachia provides shady and cool environment, feeding platform can be arranged at contiguous bank, body waters, pond, also can be arranged in the waters of pond body, the height of feeding platform and horizontal plane maintain an equal level or are slightly high, and described solar protection devices can be for being arranged on sunshade net, sunshade or the other forms of sunshade design on frame; Meanwhile, be arranged at pond body bottom fish for net can be when becoming the results of the frog standby, fish at ordinary times net laying and be located at body bottom, pond, when results, directly by net pull-up, effectively improved efficiency of crop, overcome the inconvenience that beating of frog brought to seizure; Design of impervious layer is conducive to guarantee that water body does not run off, and simultaneously can all can for soil matrix or mixed earth base in the bottom surface of pond body.
In sum, owing to having adopted technique scheme, the beneficial effects of the utility model are: it is ingenious that described ecology is supported the design of frog pond, having realized one raises pond and can be used in frog in batrachia growth and lay eggs, ovum hatching, tadpole is raised, froglet is concentrated and tames and dociles food and the overall process that becomes the frog, improved the availability of infrastructure, effectively avoided frog seedling to move the impact on its growth of phase that is not suitable with behind pond, this raising pond can also provide the three-dimensional depth of water and water temperature for batrachia simultaneously, make to be more suitable for the raising of batrachia, can effectively improve cultivation efficiency, there is very strong practicality.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of a kind of structure of the present utility model,
Fig. 2 is the schematic diagram of another kind of structure of the present utility model.
Mark in figure: Ti,2-phytal zone, 1-pond, 3-profundal zone, 4-are domatic, 5-impervious barrier, 6-mesozone, 7-feeding platform.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail.
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
embodiment 1
Batrachia of the present utility model is raised, its section signal as shown in Figure 1, comprise pond body 1, on whole pond body 1, be provided with phytal zone 2 and profundal zone 3 through domatic 4 transition of arc, and form the mesozone 6 of depth of water transition, the bottom of whole pond body 1 is also provided with impervious barrier 5, body 1 bottom in pond is equipped with one and fishes for net, the vicinity waters of pond body 1 is provided with the feeding platform 7 of band sunshade net (not illustrating in the drawings) on the bank, described domatic 4 is soil matrix, the span of phytal zone 2 and profundal zone 3 is 100-300cm, the degree of depth of profundal zone 3 is 20-100cm, the width of whole profundal zone 3 is 200-600cm, the length in pond can cultivate scale according to reality and determine, also can pond body be built up to rectangle or circle according to situation, or other shapes, only need to guarantee phytal zone 2, domatic 4 designs of profundal zone 3 and arc.
embodiment 2
Batrachia of the present utility model is raised, its section signal as shown in Figure 2, comprise pond body 1, on whole pond body 1, be provided with phytal zone 2 and profundal zone 3 through domatic 4 transition of stairstepping, and form the mesozone 6 of depth of water transition, the bottom of whole pond body 1 is also provided with impervious barrier 5, body 1 bottom in pond is equipped with one and fishes for net, 2 positions, phytal zone of pond body 1 are provided with the feeding platform 7 of band sunshading top (not illustrating in the drawings), feeding platform 7 height maintains an equal level with horizontal plane or high being advisable slightly, described domatic 4 is coagulation soil matrix, the span of phytal zone 2 and profundal zone 3 is 100-300cm, the degree of depth of profundal zone 3 is 20-100cm, the height of each ladder is advisable with 1-20cm, not interrupted to guarantee beating of batrachia, the progression of ladder can need to design according to using, in the present embodiment, design 3 ladders, the width of whole profundal zone 3 is 200-600cm, the length in pond can cultivate scale according to reality and determine, also can pond body be built up to rectangle or circle according to situation, or other shapes, only need to guarantee domatic 4 designs of phytal zone 2, profundal zone 3 and arc.
It is ingenious that ecology of the present utility model is supported the design of frog pond, realized one raise that pond can be used in that frog in batrachia growth lays eggs, ovum hatching, tadpole are raised, froglet is concentrated and tames and dociles food and the overall process that becomes the frog, improved the availability of infrastructure, effectively avoided frog seedling to move the impact on its growth of phase that is not suitable with behind pond, this raising pond can also provide the three-dimensional depth of water and water temperature for batrachia simultaneously, make to be more suitable for the raising of batrachia, can effectively improve cultivation efficiency, there is very strong practicality.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (10)

1. ecology is supported a frog pond, comprises pond body (1), it is characterized in that: described pond body (1) is provided with phytal zone (2) and profundal zone (3), and described phytal zone (2) and profundal zone (3) are through domatic (4) transition.
2. ecology as claimed in claim 1 is supported frog pond, it is characterized in that: described domatic (4) curved structure.
3. ecology as claimed in claim 1 is supported frog pond, it is characterized in that: described domatic (4) are ladder-type structure.
4. ecology as claimed in claim 3 is supported frog pond, it is characterized in that: domatic (4) of described ladder-type structure, the height of each ladder is 1-20cm.
5. ecology is as claimed in claim 1 or 2 or 3 or 4 supported frog pond, it is characterized in that: described pond body (1) is also provided with feeding platform (7).
6. ecology as claimed in claim 5 is supported frog pond, it is characterized in that: the top of described feeding platform (7) is provided with solar protection devices.
7. the ecology as described in claim 1 or 2 or 3 or 4 or 6 is supported frog pond, it is characterized in that: the surface of described pond body (1) bottom be equipped with one can pull-up fish for net.
8. the ecology as described in claim 1 or 2 or 3 or 4 or 6 is supported frog pond, it is characterized in that: described pond body (1) bottom is also provided with impervious barrier (5).
9. ecology as claimed in claim 1 is supported frog pond, it is characterized in that: the degree of depth of described profundal zone (3) is 20-100cm.
10. the ecology as described in claim 1 or 9 is supported frog pond, it is characterized in that: the span between described phytal zone (2) to profundal zone (3) is 100-300cm.
CN201320389436.5U 2013-07-02 2013-07-02 Ecological frog raising pond Expired - Fee Related CN203407367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320389436.5U CN203407367U (en) 2013-07-02 2013-07-02 Ecological frog raising pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320389436.5U CN203407367U (en) 2013-07-02 2013-07-02 Ecological frog raising pond

Publications (1)

Publication Number Publication Date
CN203407367U true CN203407367U (en) 2014-01-29

Family

ID=49970305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320389436.5U Expired - Fee Related CN203407367U (en) 2013-07-02 2013-07-02 Ecological frog raising pond

Country Status (1)

Country Link
CN (1) CN203407367U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103749387A (en) * 2014-02-21 2014-04-30 龙南源头活水生态科技有限责任公司 Method for building aquatic rare amphibian industrial culture pond
CN103782958A (en) * 2014-02-21 2014-05-14 龙南源头活水生态科技有限责任公司 Imitative-ecological one-button factory breeding and domesticating method for frogs
CN105494235A (en) * 2015-09-16 2016-04-20 浙江长兴创意生态农业发展有限公司 Multifunctional frog culturing pond and culturing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103749387A (en) * 2014-02-21 2014-04-30 龙南源头活水生态科技有限责任公司 Method for building aquatic rare amphibian industrial culture pond
CN103782958A (en) * 2014-02-21 2014-05-14 龙南源头活水生态科技有限责任公司 Imitative-ecological one-button factory breeding and domesticating method for frogs
CN103782958B (en) * 2014-02-21 2015-08-26 龙南源头活水生态科技有限责任公司 The one-touch plant modification domesticating method of a kind of frog Ecology
CN105494235A (en) * 2015-09-16 2016-04-20 浙江长兴创意生态农业发展有限公司 Multifunctional frog culturing pond and culturing method
CN105494235B (en) * 2015-09-16 2019-04-12 浙江长兴创意生态农业发展有限公司 The multi-functional feeding frog pond of one kind and cultural method

Similar Documents

Publication Publication Date Title
CN202999086U (en) Batrachia ecology-imitated aquaculture pool
CN103733972B (en) A kind of manufacture method of Overwater plant cultivation raft
CN201332627Y (en) Novel ecological pond for high-density loach fry raising and mature loach breeding
CN102726242B (en) Water planting-raising combination device and method for manufacturing same
CN203709046U (en) Pond for high-density crab breeding
CN204070143U (en) A kind of rice field carp culture system
KR101395758B1 (en) Artificial reef for sea cucumber
CN104041449A (en) Trachidermus fasciatus breeding and culturing workshop system for simulating natural ecological environment
CN203407367U (en) Ecological frog raising pond
CN202043542U (en) Wild farm for soft-shelled turtles
CN103283689A (en) Propagation control method for indoor cultivation of Perinereis aibuhitensis
CN205093370U (en) Shrimp culturing net cage
CN203748460U (en) Parent fish domesticating pool
CN106305533A (en) Floating raft type culture method of oysters
CN105494235A (en) Multifunctional frog culturing pond and culturing method
CN204174581U (en) Embedded and locked type noise grass planting dust block
CN103875585B (en) A kind of high-quality crab forms the method for construction in pond
CN203748456U (en) Mudflat shellfish efficient mixed culture pool
CN204090771U (en) A kind of box blue crab cultivation device
CN202697336U (en) Water planting and breeding combined device
CN103070108B (en) Fishery auxiliary breeding device
CN205180093U (en) High yield pond of breeding of frog class integration
CN105010228A (en) Cave type bamboo rat reproduction pool and three-dimensional bamboo rat pool thereof
CN103141423B (en) Artificial fish reef
CN203762084U (en) Ecological breeding pond for baby turtles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

Termination date: 20170702