CN203393743U - Reusable external immersed tube tunnel vertical supporting device - Google Patents

Reusable external immersed tube tunnel vertical supporting device Download PDF

Info

Publication number
CN203393743U
CN203393743U CN201320322756.9U CN201320322756U CN203393743U CN 203393743 U CN203393743 U CN 203393743U CN 201320322756 U CN201320322756 U CN 201320322756U CN 203393743 U CN203393743 U CN 203393743U
Authority
CN
China
Prior art keywords
jack
immersed tube
immersed
vertical supporting
tube tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320322756.9U
Other languages
Chinese (zh)
Inventor
林金雄
贺维国
胡勇前
钟伟春
邢永辉
杨海涛
周华贵
张毅
吕洋
梁志伟
赵朋辉
孙斌
曾珂
李汉君
林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRTG Survey and Design Institute Co Ltd
Guangzhou Salvage Bureau
Original Assignee
CRTG Survey and Design Institute Co Ltd
Guangzhou Salvage Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd, Guangzhou Salvage Bureau filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201320322756.9U priority Critical patent/CN203393743U/en
Application granted granted Critical
Publication of CN203393743U publication Critical patent/CN203393743U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a reusable external immersed tube tunnel vertical supporting device. The reusable external immersed tube tunnel vertical supporting device comprises temporary cushion blocks, jacks and jack support bases, wherein the jack support bases are vertically arranged on the temporary cushion blocks, the jacks are vertical arranged and are inserted onto the jack support bases in embedding modes, and the top parts of the jacks extend out from the interiors of the jack support bases. The immersed tube section in an immersed tube tunnel is subjected to sinking butt joint through the jacks, the jacks are externally arranged in the immersed tube section in the construction process and are used for pushing the immersed tube section to the appropriate construction position in a vertical supporting mode, further and the jacks and the jack support bases can be removed and recovered after construction of the immersed tube section, and can reused in vertical supporting and sinking butt joint of the next immersed tube section to be sunk. The reusable external immersed tube tunnel vertical supporting device can reuse the jacks and the jack support bases, does not damage the immersed tube section structure, and is simple in structure and low in manufacturing cost.

Description

The external immersed tube tunnel vertical supporting device that can reuse
Technical field
The utility model relates to a kind of braced structures of immersed tube tunnel, specifically refers to the external immersed tube tunnel vertical supporting device that can reuse.
Background technology
The braced structures of immersed tube tunnel is the necessary equipment in immersed tube tunnel construction, at present, the braced structures of existing immersed tube tunnel is normally built in the built-in immersed tube tunnel vertical support structure of immersed segment, structure is as Fig. 1, shown in Fig. 2, this braced structures comprises temporary cushion block 1, push rod 4 and jack 3, when immersed segment 2 being carried out to vertical support and sinking docking, vertical support structure need to be embedded in the base plate 22 or side wall 21 of immersed segment 2, while using this vertical support structure to support, vertical support structure is embedded in the base plate 22 or side wall 21 of immersed segment 2, when immersed segment 2 sinking, utilize jack 3 that the push rod in braced structures 4 is released and is supported on temporary cushion block 1, after immersed segment 2 based process complete by jack 3 and expose braced structures and remove, and cap holes.
There is following defect in above-mentioned existing vertical support structure:
(1) existing vertical support structure is embedded in the inside of immersed segment, after one section of immersed segment is used, can not be recycled and reused for next immersed segment again;
(2) the pre-buried part of existing vertical support structure must penetrate the base plate of whole immersed segment when pre-buried, and stressed, the waterproof of immersed segment and durability are all had to adverse effect;
(3) existing vertical support structure steel using amount is large, watertightness requirement is strict, cause construction costs high.
Utility model content
The purpose of this utility model is to provide a kind of external immersed tube tunnel vertical supporting device reusing, and this bracing or strutting arrangement can reuse jack and jacking bracket, not destroy immersed segment structure, and simple in structure, cost is low.
This purpose of the present utility model realizes by the following technical solutions: the external immersed tube tunnel vertical supporting device that can reuse, comprise temporary cushion block and jack, it is characterized in that: described bracing or strutting arrangement also comprises jacking bracket, described jacking bracket is vertically arranged on described temporary cushion block, described jack also vertically arranges, jack is embedded to be inserted on described jacking bracket, stretch out in jacking bracket at the top of jack, described jack carries out being placed on immersed segment in sinking docking work progress at the immersed segment of immersed tube tunnel, for immersed segment vertical support pushing tow is arrived to suitable construction location, and described jack and jacking bracket can remove recovery after immersed segment has been constructed, be recycled and reused for again vertical support and the sinking docking of next immersed segment for the treatment of sinking.
Bracing or strutting arrangement of the present utility model is regulated and is made it to immersed segment, play vertical support effect by jack when immersed segment sinking, after treating that immersed segment based process completes, by jack and jacking bracket recycling.
In the utility model, described jacking bracket is up-small and down-big, jacking bracket comprises the bearing fore-set of the vertical setting that is positioned at top, the circular bearing waist dish of horizontally set that is positioned at middle part and the circular bearing chassis of horizontally set that is positioned at bottom, the center of described bearing fore-set vertically offers for the centre bore of jack is installed, between described bearing fore-set and bearing waist dish, be also vertically provided with deep floor, between described bearing waist dish and bearing chassis, be also vertically provided with deep floor.
In the utility model, described jacking bracket is arranged on described temporary cushion block by bolt.
In the utility model, described jack is hydraulic jack.
Compared with prior art, the utlity model has following remarkable result:
(1) bracing or strutting arrangement of the present utility model, is placed on immersed segment during use, jack and jacking bracket can be recycled and reused for next immersed segment after one section of immersed segment is used again, and can reuse.
(2) bracing or strutting arrangement of the present utility model, without punching on the base plate of immersed segment, stressed unaffected to immersed segment, also avoided the problems such as waterproof that immersed segment may occur and durability simultaneously.
(3) bracing or strutting arrangement construction costs of the present utility model is low.
(4) method for supporting easy construction of the present utility model.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the floor map that in prior art, immersed tube tunnel vertical support is arranged;
Fig. 2 is the stereogram of built-in immersed tube tunnel vertical support structure in prior art;
Fig. 3 is the perspective view of the utility model external immersed tube tunnel vertical supporting device that can reuse during for immersed tube tunnel vertical support;
Fig. 4 is the lateral view of the utility model external immersed tube tunnel vertical supporting device that can reuse during for immersed tube tunnel vertical support;
Fig. 5 is that in the utility model external immersed tube tunnel vertical supporting device that can reuse, jack is installed to the assembling drawing after jacking bracket;
Fig. 6 is the top view of Fig. 5.
Description of reference numerals
1, temporary cushion block; 2, immersed segment; 21, side wall; 22, base plate; 3, jack;
4, push rod; 5, jacking bracket; 51, bearing fore-set; 52, bearing waist dish;
53, bearing chassis; 54, deep floor; 55, deep floor; 6, bolt
The specific embodiment
The external immersed tube tunnel vertical supporting device reusing as shown in Figures 3 to 6, comprise temporary cushion block 1 and jack 3, jack 3 is hydraulic jack, this bracing or strutting arrangement also comprises jacking bracket 5, jacking bracket 5 is vertically arranged on temporary cushion block 1, concrete mounting structure is that jacking bracket 5 is arranged on temporary cushion block 1 by bolt 6, jack 3 also vertically arranges, jack 3 is embedded to be inserted on jacking bracket 5, stretch out in jacking bracket 5 at the top of jack 3, jack 3 carries out being placed on immersed segment 2 in sinking docking work progress at the immersed segment 2 of immersed tube tunnel, for immersed segment 2 vertical support pushing tows are arrived to suitable construction location, and jack 3 and jacking bracket 5 can remove recovery after immersed segment 2 has been constructed, be recycled and reused for again vertical support and the sinking docking of next immersed segment for the treatment of sinking.
In the present embodiment, jacking bracket 5 is up-small and down-big, jacking bracket 5 comprises the bearing fore-set 51 of the vertical setting that is positioned at top, the circular bearing waist dish 52 of horizontally set that is positioned at middle part and the circular bearing chassis 53 of horizontally set that is positioned at bottom, bearing fore-set 51 center vertically offers for the centre bore of jack 3 is installed, between bearing fore-set 51 and bearing waist dish 52, be also vertically provided with deep floor 54, between bearing waist dish 52 and bearing chassis 53, be also vertically provided with deep floor 55.
The method for supporting of the above-mentioned external immersed tube tunnel vertical supporting device reusing, the method comprises the steps:
(1) make temporary cushion block and jacking bracket;
(2) in the corresponding region under water of the immersed segment for the treatment of sinking, temporary cushion block is installed; ;
(3) jacking bracket is arranged on temporary cushion block, then jack is arranged on jacking bracket;
(4) by the immersed segment support for the treatment of sinking on jack, make the jack can vertical support immersed segment, by control device, jack is regulated, jack arrives suitable construction location by immersed segment vertical support pushing tow in the work progress of immersed segment sinking docking;
(5) after immersed segment based process completes, regain jack, remove jack and jacking bracket, the jack after removing and jacking bracket can be recycled and reused for the immersed segment that next treats sinking again.
Above-described embodiment of the present utility model is not the restriction to the utility model protection domain; embodiment of the present utility model is not limited to this; all this kind is according to foregoing of the present utility model; according to ordinary skill knowledge and the customary means of this area; do not departing under the above-mentioned fundamental technics thought of the utility model prerequisite; the modification of other various ways that the utility model said structure is made, replacement or change, within all should dropping on protection domain of the present utility model.

Claims (4)

1. the external immersed tube tunnel vertical supporting device that can reuse, comprise temporary cushion block (1) and jack (3), it is characterized in that: described bracing or strutting arrangement also comprises jacking bracket (5), described jacking bracket (5) is vertically arranged on described temporary cushion block (1), described jack (3) also vertically arranges, jack (3) is embedded to be inserted on described jacking bracket (5), stretch out in jacking bracket (5) at the top of jack (3), described jack (3) carries out being placed on immersed segment (2) in sinking docking work progress at the immersed segment (2) of immersed tube tunnel, for immersed segment (2) vertical support pushing tow is arrived to suitable construction location, and described jack (3) and jacking bracket (5) can remove recovery after immersed segment (2) has been constructed, be recycled and reused for again vertical support and the sinking docking of next immersed segment for the treatment of sinking.
2. the external immersed tube tunnel vertical supporting device reusing according to claim 1, it is characterized in that: described jacking bracket (5) is up-small and down-big, jacking bracket (5) comprises the bearing fore-set (51) of the vertical setting that is positioned at top, be positioned at the circular bearing waist dish (52) of the horizontally set at middle part, and the circular bearing chassis (53) that is positioned at the horizontally set of bottom, the center of described bearing fore-set (51) vertically offers for the centre bore of jack (3) is installed, between described bearing fore-set (51) and bearing waist dish (52), be also vertically provided with deep floor (54), between described bearing waist dish (52) and bearing chassis (53), be also vertically provided with deep floor (55).
3. the external immersed tube tunnel vertical supporting device reusing according to claim 1, is characterized in that: described jacking bracket (5) is arranged on described temporary cushion block (1) by bolt (6).
4. according to the external immersed tube tunnel vertical supporting device reusing described in claims 1 to 3 any one, it is characterized in that: described jack (3) is hydraulic jack.
CN201320322756.9U 2013-06-06 2013-06-06 Reusable external immersed tube tunnel vertical supporting device Withdrawn - After Issue CN203393743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320322756.9U CN203393743U (en) 2013-06-06 2013-06-06 Reusable external immersed tube tunnel vertical supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320322756.9U CN203393743U (en) 2013-06-06 2013-06-06 Reusable external immersed tube tunnel vertical supporting device

Publications (1)

Publication Number Publication Date
CN203393743U true CN203393743U (en) 2014-01-15

Family

ID=49905285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320322756.9U Withdrawn - After Issue CN203393743U (en) 2013-06-06 2013-06-06 Reusable external immersed tube tunnel vertical supporting device

Country Status (1)

Country Link
CN (1) CN203393743U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321248A (en) * 2013-06-06 2013-09-25 交通运输部广州打捞局 Recycling external immersed tube tunnel vertical supporting device and supporting method thereof
CN103758150A (en) * 2014-01-17 2014-04-30 天津市市政工程设计研究院 Method for constructing temporary support of twin-bore immersed tube tunnel with three tube corridors and perpendicular jack of temporary support
CN107419749A (en) * 2017-08-31 2017-12-01 中交第四航务工程局有限公司 FS final spice transport base method for supporting and verification method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321248A (en) * 2013-06-06 2013-09-25 交通运输部广州打捞局 Recycling external immersed tube tunnel vertical supporting device and supporting method thereof
CN103321248B (en) * 2013-06-06 2015-05-20 交通运输部广州打捞局 Recycling external immersed tube tunnel vertical supporting device and supporting method thereof
CN103758150A (en) * 2014-01-17 2014-04-30 天津市市政工程设计研究院 Method for constructing temporary support of twin-bore immersed tube tunnel with three tube corridors and perpendicular jack of temporary support
CN103758150B (en) * 2014-01-17 2015-10-28 天津市市政工程设计研究院 The construction method of diplopore three piping lane immersed tube tunnel temporary support and vertical jack thereof
CN107419749A (en) * 2017-08-31 2017-12-01 中交第四航务工程局有限公司 FS final spice transport base method for supporting and verification method
CN107419749B (en) * 2017-08-31 2019-10-29 中交第四航务工程局有限公司 FS final spice transport base method for supporting and verification method

Similar Documents

Publication Publication Date Title
CN203393743U (en) Reusable external immersed tube tunnel vertical supporting device
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN104109999A (en) Construction method for bridge tower transverse beams
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN106320736B (en) Building moving climbing lifting forward method
CN103321248B (en) Recycling external immersed tube tunnel vertical supporting device and supporting method thereof
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
JP2009052306A (en) Construction method for replacing bridge girder
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN204727362U (en) Control setup draw-in box
CN103122642B (en) Construction method of vertical post support change
CN104005431B (en) Oblique orthogonal makes template for group's pile-pile cap-superstructure scale model
CN106978810A (en) A kind of concrete inner support end uses the construction method of shaped steel tectonic system
CN105507329B (en) Silt soil strata base plate of foundation pit support replacement system in deep foundation pit supporting construction
CN107642089A (en) A kind of small space concreting method
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN103422508A (en) Mechanical stuffy demolition method and structure of inner supporting platform structure of deep foundation pit
CN206174967U (en) Construction trolley car of bow member among tunnel and underground works
JP2010275708A (en) Method for forming building
CN211313626U (en) Town road foundation ditch safety device
CN203795449U (en) Vertical rod footstool base for constructing raft foundation upturned beam
CN204679074U (en) Novel surface observation pier structure
CN103993612B (en) A kind of construction method of underwater concrete cushion cap
CN203741847U (en) Channel reverse formwork construction device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140115

Effective date of abandoning: 20150520

RGAV Abandon patent right to avoid regrant