CN203392756U - Water tower cylinder wall construction device - Google Patents

Water tower cylinder wall construction device Download PDF

Info

Publication number
CN203392756U
CN203392756U CN201320469493.4U CN201320469493U CN203392756U CN 203392756 U CN203392756 U CN 203392756U CN 201320469493 U CN201320469493 U CN 201320469493U CN 203392756 U CN203392756 U CN 203392756U
Authority
CN
China
Prior art keywords
wall construction
armstand
tower crane
cylindrical shell
upgrade block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320469493.4U
Other languages
Chinese (zh)
Inventor
高昌义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Nuclear Engineering Co Ltd
Original Assignee
SEPCO2 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO2 Electric Power Construction Co Ltd filed Critical SEPCO2 Electric Power Construction Co Ltd
Priority to CN201320469493.4U priority Critical patent/CN203392756U/en
Application granted granted Critical
Publication of CN203392756U publication Critical patent/CN203392756U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Jib Cranes (AREA)

Abstract

The utility model discloses a water tower cylinder wall construction device which comprises a tower crane, a cylinder wall template detachment lifting device and a spiral buffer concrete casting funnel, wherein the tower crane comprises a vertical arm; a lifting device is arranged on the vertical arm and comprises a lifting seat arranged on the vertical arm in a sliding mode; a hydraulic device is arranged between the lifting seat and the vertical arm; two telescopic arms and a balance bridge are respectively arranged on two sides of the lifting seat; a walking pedal is arranged between the two telescopic arms; safety fences are respectively arranged on the two telescopic arms; the tower crane also comprises an elevator taken by people, a cylinder wall template detachment lifting device comprising an arc-shaped guide rail lifted by the tower crane, a winch used for lifting a cylinder wall template and arranged on the arc-shaped guide rail in a sliding mode, and a spiral buffer concrete pouring funnel. The tower crane can rapidly lift steel bars, concrete pouring and template members used for cylinder wall construction, the personnel are transported through the elevator taken by people, the materials and the personnel are lifted separately, and the working efficiency is greatly improved.

Description

Water tower Wall Construction device
Technical field
The utility model relates to a kind of water tower Wall Construction device.
Background technology
The construction of concrete tube wall is at present by huge scaffold building and reinforces installation form manual work, adopts elevator construction when barrel is higher, but also will set up derrick scaffold, does personnel and material walking channel.The construction of employing elevator, upper and lower man winding material all relies on elevator, and when template is installed lifting and placing concrete, by manual work, labour intensity is large, and operating personnel is arduous, and danger is many, long construction period.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of constructability operation, working stability failure-free water tower Wall Construction device.
For solving the problems of the technologies described above, the technical solution of the utility model is: water tower Wall Construction device, comprise: tower crane, comprise armstand, described armstand is provided with bont, described bont comprises the upgrade block that in described armstand, slip is provided with, and between described upgrade block and described armstand, is provided with hydraulic efficiency gear; A side that is positioned at described armstand on described upgrade block is provided with two telescopic booms, the opposite side that is positioned at described armstand on described upgrade block is provided with balance bridge, described in two, between telescopic boom, be provided with walking pedal, on described two flexible walls, be also respectively equipped with safe fence, described tower crane also comprises that people takes a lift; Barrel formwork assembling and disassembling bont, comprises the arc-shaped rail of being sling by tower crane, is slidably fitted with the winch of handling barrel template on described arc-shaped rail; Helical buffer concrete casting funnel, comprises funnel housing, and the bottom of described funnel housing is provided with discharging cylindrical shell, in described discharging cylindrical shell, is provided with discharging controlling device, and the bottom of described discharging cylindrical shell is provided with discharge valve.
As preferred technical scheme, between described upgrade block bottom and described telescopic boom, be provided with support cylinder; Between described upgrade block top and described telescopic boom, be provided with telescopic boom pull bar.
As preferred technical scheme, between described upgrade block top and described balance bridge, be provided with balance bridge pull bar.
As preferred technical scheme, described discharging controlling device comprises the helical-blade bobbin being rotatably installed in described discharging cylindrical shell, on described helical-blade bobbin, helicallobe is installed, and on described discharging cylindrical shell, is also provided with helicallobe control device for pivoting.
As preferred technical scheme, described helicallobe control device for pivoting comprises that one end is against the leading screw on described helical-blade bobbin, on described discharging cylindrical shell, is installed with screw, and the other end of described leading screw is provided with rotation handwheel.
As preferred technical scheme, the tapering of described funnel housing is 30 °.
Owing to having adopted technique scheme, water tower Wall Construction device, comprising: tower crane, comprise armstand, described armstand is provided with bont, and described bont comprises the upgrade block that in described armstand, slip is provided with, and between described upgrade block and described armstand, is provided with hydraulic efficiency gear, a side that is positioned at described armstand on described upgrade block is provided with two telescopic booms, the opposite side that is positioned at described armstand on described upgrade block is provided with balance bridge, described in two, between telescopic boom, be provided with walking pedal, on described two flexible walls, be also respectively equipped with safe fence, described tower crane also comprises that people takes a lift, barrel formwork assembling and disassembling bont, comprises the arc-shaped rail of being sling by tower crane, is slidably fitted with the winch of handling barrel template on described arc-shaped rail, helical buffer concrete casting funnel, comprises funnel housing, and the bottom of described funnel housing is provided with discharging cylindrical shell, in described discharging cylindrical shell, is provided with discharging controlling device, and the bottom of described discharging cylindrical shell is provided with discharge valve, the upper and lower safe operation of tower crane constructability personnel, tower crane can also lift by crane Wall Construction reinforcing bar used and the installation of concreting and modular shuttering element by fast speed, personnel are taken a lift and are carried by people, material separates lifting with personnel, greatly increase work efficiency, and described bont comprises two telescopic booms that are positioned at described armstand one side, described in two, between telescopic boom, be provided with walking pedal, on the trouble free service face that workmen can form at telescopic boom described in two, construct, bont has facilitated workmen to launch construction in each position, efficiency is higher, barrel formwork assembling and disassembling bont comprises the arc-shaped rail of being sling by tower crane, can arc-shaped rail be allocated and transported to construction working face as required, on described arc-shaped rail, be slidably fitted with the winch of handling barrel template, can change as required the position of winch, construct convenient, in the discharging cylindrical shell that described helical buffer concrete casting is leaked, be provided with discharging controlling device, described discharging controlling device comprises helicallobe, by adjusting the velocity of rotation of helicallobe, can regulate easily concrete discharging speed, convenient and reliable.
accompanying drawing explanation
Fig. 1 is the tower type crane structure schematic diagram in the utility model embodiment;
Fig. 2 is the structural representation of barrel formwork assembling and disassembling bont in the utility model embodiment;
Fig. 3 is the structural representation of helical buffer concrete casting funnel in the utility model embodiment;
Fig. 4 is the cutaway view of helical buffer concrete casting funnel in the utility model embodiment;
In figure: 1-armstand; 2-telescopic boom; 3-balance bridge; 4-people takes a lift; 5-arc-shaped rail; 6-winch; 7-funnel housing; 8-discharging cylindrical shell; 9-discharge valve; 10-helical-blade bobbin; 11-helicallobe; 12-leading screw; 13-rotates handwheel; 14-upgrade block; 15-support cylinder; 16-telescopic boom pull bar; 17-balance bridge pull bar.
The specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, water tower Wall Construction device, comprising:
Tower crane, comprises armstand 1, and described armstand 1 is provided with bont, and described bont comprises the upgrade block 14 that in armstand, slip is provided with, and between described upgrade block 14 and described armstand 1, is provided with hydraulic efficiency gear; A side that is positioned at described armstand 1 on described upgrade block 14 is provided with two telescopic booms 2, the opposite side that is positioned at described armstand 1 on described upgrade block 14 is provided with balance bridge 3, described in two, between telescopic boom 2, be provided with walking pedal, on described two flexible walls 2, be also respectively equipped with safe fence, described tower crane also comprises that people takes a lift 4;
Barrel formwork assembling and disassembling bont, comprises the arc-shaped rail 5 of being sling by tower crane, is slidably fitted with the winch 6 of handling barrel template on described arc-shaped rail 5; Described arc-shaped rail has facilitated winch to move along water tower barrel, and described winch 6 is electric winch or manual slide fastener winch.
Between described upgrade block 14 bottoms and described telescopic boom 2, be provided with support cylinder 15; Between described upgrade block 14 tops and described telescopic boom 2, be provided with telescopic boom pull bar 16.Between described upgrade block 14 tops and described balance bridge 3, be provided with balance bridge pull bar 17.
Helical buffer concrete casting funnel, comprises funnel housing 7, and the bottom of described funnel housing 7 is provided with discharging cylindrical shell 8, in described discharging cylindrical shell 8, is provided with discharging controlling device, and the bottom of described discharging cylindrical shell 8 is provided with discharge valve 9.
As shown in Figure 4, described discharging controlling device comprises the helical-blade bobbin 10 being rotatably installed in described discharging cylindrical shell 8, on described helical-blade bobbin 10, helicallobe 11 is installed, and on described discharging cylindrical shell 8, is also provided with helicallobe control device for pivoting.
Described helicallobe control device for pivoting comprises that one end is against the leading screw 12 on described helical-blade bobbin 10, on described discharging cylindrical shell 8, is installed with screw, and the other end of described leading screw 12 is provided with and rotates handwheel 13.
The tapering of described funnel housing 7 is 30 °, rear cleaning easy to use.
The upper and lower safe operation of tower crane constructability personnel, tower crane can also lift by crane Wall Construction reinforcing bar used and the installation of concreting and modular shuttering element by fast speed, personnel are taken a lift and 4 are carried by people, material separates lifting with personnel, greatly increase work efficiency, and described bont comprises two telescopic booms 2 that are positioned at described armstand one side, described in two, between telescopic boom 2, be provided with walking pedal, on the trouble free service face that workmen can form at telescopic boom described in two, construct, bont has facilitated workmen to launch construction in each position, efficiency is higher, barrel formwork assembling and disassembling bont comprises the arc-shaped rail 5 of being sling by tower crane, can arc-shaped rail be allocated and transported to construction working face as required, on described arc-shaped rail 5, be slidably fitted with the winch 6 of handling barrel template, can change as required the position of winch, construct convenient, in the discharging cylindrical shell that described helical buffer concrete casting is leaked, be provided with discharging controlling device, described discharging controlling device comprises helicallobe, by adjusting the velocity of rotation of helicallobe, can regulate easily concrete discharging speed, convenient and reliable.
More than show and described groundwork of the present utility model, principal character and advantage of the present utility model.The technical personnel of the industry should be understood; the utility model is not restricted to the described embodiments; that in above-described embodiment and specification sheets, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (6)

1. water tower Wall Construction device, is characterized in that, comprising:
Tower crane, comprises armstand, and described armstand is provided with bont, and described bont comprises the upgrade block that in described armstand, slip is provided with, and between described upgrade block and described armstand, is provided with hydraulic efficiency gear; A side that is positioned at described armstand on described upgrade block is provided with two telescopic booms, the opposite side that is positioned at described armstand on described upgrade block is provided with balance bridge, described in two, between telescopic boom, be provided with walking pedal, on described two flexible walls, be also respectively equipped with safe fence, described tower crane also comprises that people takes a lift;
Barrel formwork assembling and disassembling bont, comprises the arc-shaped rail of being sling by tower crane, is slidably fitted with the winch of handling barrel template on described arc-shaped rail;
Helical buffer concrete casting funnel, comprises funnel housing, and the bottom of described funnel housing is provided with discharging cylindrical shell, in described discharging cylindrical shell, is provided with discharging controlling device, and the bottom of described discharging cylindrical shell is provided with discharge valve.
2. water tower Wall Construction device as claimed in claim 1, is characterized in that: between described upgrade block bottom and described telescopic boom, be provided with support cylinder; Between described upgrade block top and described telescopic boom, be provided with telescopic boom pull bar.
3. water tower Wall Construction device as claimed in claim 1, is characterized in that: between described upgrade block top and described balance bridge, be provided with balance bridge pull bar.
4. water tower Wall Construction device as claimed in claim 1, it is characterized in that: described discharging controlling device comprises the helical-blade bobbin being rotatably installed in described discharging cylindrical shell, on described helical-blade bobbin, helicallobe is installed, on described discharging cylindrical shell, is also provided with helicallobe control device for pivoting.
5. water tower Wall Construction device as claimed in claim 4, it is characterized in that: described helicallobe control device for pivoting comprises that one end is against the leading screw on described helical-blade bobbin, on described discharging cylindrical shell, be installed with screw, the other end of described leading screw is provided with rotation handwheel.
6. the water tower Wall Construction device as described in claim as arbitrary in claim 1 to 5, is characterized in that: the tapering of described funnel housing is 30 °.
CN201320469493.4U 2013-08-02 2013-08-02 Water tower cylinder wall construction device Expired - Lifetime CN203392756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320469493.4U CN203392756U (en) 2013-08-02 2013-08-02 Water tower cylinder wall construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320469493.4U CN203392756U (en) 2013-08-02 2013-08-02 Water tower cylinder wall construction device

Publications (1)

Publication Number Publication Date
CN203392756U true CN203392756U (en) 2014-01-15

Family

ID=49904303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320469493.4U Expired - Lifetime CN203392756U (en) 2013-08-02 2013-08-02 Water tower cylinder wall construction device

Country Status (1)

Country Link
CN (1) CN203392756U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938900A (en) * 2014-04-29 2014-07-23 中联重科股份有限公司 Construction method of cooling tower and tower crane
CN104727545A (en) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 Large water tower cylinder hydraulic slip-form vertical-transportation system and method
CN104863158A (en) * 2015-05-25 2015-08-26 中国建筑第八工程局有限公司 Super-deep and downward concrete conveying system along vertical structure
CN106639608A (en) * 2016-10-10 2017-05-10 中国二十二冶集团有限公司 Built-in tower for construction for prestress steel strand concrete tower barrel and installation method
CN106829752A (en) * 2017-04-10 2017-06-13 中国二十二冶集团有限公司 For the hoisting apparatus and application method of wind-driven generator tower

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938900A (en) * 2014-04-29 2014-07-23 中联重科股份有限公司 Construction method of cooling tower and tower crane
CN103938900B (en) * 2014-04-29 2015-11-18 中联重科股份有限公司 A kind of construction method of cooling tower and tower machine
CN104727545A (en) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 Large water tower cylinder hydraulic slip-form vertical-transportation system and method
CN104863158A (en) * 2015-05-25 2015-08-26 中国建筑第八工程局有限公司 Super-deep and downward concrete conveying system along vertical structure
CN106639608A (en) * 2016-10-10 2017-05-10 中国二十二冶集团有限公司 Built-in tower for construction for prestress steel strand concrete tower barrel and installation method
CN106829752A (en) * 2017-04-10 2017-06-13 中国二十二冶集团有限公司 For the hoisting apparatus and application method of wind-driven generator tower

Similar Documents

Publication Publication Date Title
CN203392756U (en) Water tower cylinder wall construction device
CN203159089U (en) Telescopic lifting platform for tower crane in cylinder wall construction
WO2023082594A1 (en) Walking-type bridge thin-wall pier high-pier jacking formwork and construction method therefor
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN202055516U (en) Integral mold board elevating system of vertical shaft
CN204098464U (en) A kind of civil engineering packaged type supporting rack
CN203877745U (en) Hydraulic linkage hoisting clamp device for building hollow slabs
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN102677907A (en) Method for manually installing steel beam at top of silo
CN203097281U (en) Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN203795865U (en) Lifting tumbling barrel for super-high concrete casting
CN203782863U (en) Frame type draining well
CN202017342U (en) Block traction drawing die for slope concrete pouring
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN211691530U (en) Bolt ball truss hoisting device
CN203393632U (en) Movable formwork device for negative bending moment tension of precast T-beam flange plate
CN208648593U (en) A kind of four cylinder lifting devices for mine underground work
CN205802761U (en) Deposited reinforced concrete pile hoisting device for reinforcement cage
CN201882812U (en) Hydraulic pressure jacking rotary flat bridge
CN206034950U (en) A early tear support open for building templates
CN205224045U (en) Examine and repair gate slot second phase concrete construction device
CN205742959U (en) A kind of lowering or hoisting gear relying on hydraulic lifting scaffold
CN212050296U (en) Overhead hoist is built in room
CN205296163U (en) Spillway gate pier concrete slipform device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd.

Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee before: POWERCHINA NUCLEAR ENGINEERING Co.

Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.

Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee before: SHANDONG ELECTRIC POWER CONSTRUCTION NO.2 Co.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20140115

CX01 Expiry of patent term