Cavern top arch concrete backfilling device Download PDFInfo
- Publication number
- CN203383831U CN203383831U CN201320456142.XU CN201320456142U CN203383831U CN 203383831 U CN203383831 U CN 203383831U CN 201320456142 U CN201320456142 U CN 201320456142U CN 203383831 U CN203383831 U CN 203383831U
- Authority
- CN
- China
- Prior art keywords
- concrete
- top arch
- cavern
- tank
- supply pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a cavern top arch concrete backfilling device, and belongs to top arch concrete backfilling devices for caverns in hydraulic and hydroelectric engineering. The cavern top arch concrete backfilling device comprises a material containing hopper, a concrete tank and a discharge pipe, wherein the material containing hopper, the concrete tank and the discharge pipe are connected in sequence, a gas supply pipe is arranged on the upper portion of the concrete tank, and the gas supply pipe is connected with an air compressor. The cavern top arch concrete backfilling device has the advantages that concrete is pressed to the backfilling portion on a top arch through air pressure generated by the air compressor after being contained in the concrete tank so that the compaction of the concrete can be ensured, the construction process does not need a large number of tubular products for erecting bearing scaffolds, no matched concrete pump is needed, and therefore the operation is easy to conduct, the construction cycle is short, the practicability is high, and cost is saved.
Description
Technical field
The utility model belongs to construction work concrete construction technology field, relates in particular to the crown concrete construction technology field of underground chamber, particularly a kind of cavern's crown concrete backfill apparatus.
Background technology
The crown permanent structure traditional approach of underground construction cavern is concrete lining, for meeting the engineering embedded part, needs is installed, and at crown, usually reserves some holes, after the embedded part installation, then adopts concrete to carry out backfill construction to reserving hole.Preformed hole construction is because engineering quantity is little, adopts traditional arch top concrete lining will use a large amount of tubing to set up load-bearing scaffold, supporting concrete pump etc., and long construction period, and construction cost is high.
Summary of the invention
Problem to be solved in the utility model is exactly that a kind of simple to operate, short construction period, cost-saving concrete backfill equipment are provided for above deficiency.
It comprises bucket, concrete tank and discharge nozzle, and bucket, concrete tank and discharge nozzle are connected successively, on concrete tank top, air supply pipe is set, and air supply pipe connects air compressor machine.
The beneficial effect compared with prior art the utlity model has is:
1,, contain concrete in concrete tank after, the air pressure that utilizes air compressor machine to produce is depressed into crown backfill position by concrete, guarantees concrete density.
2, do not need to use a large amount of tubing to set up the load-bearing scaffold in work progress, do not need supporting concrete pump, simple to operate, short construction period, strong adaptability, cost-saving.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation.
The specific embodiment
Referring to Fig. 1, the utility model comprises bucket 1, concrete tank 8 and discharge nozzle 10, and bucket 1, concrete tank 8 and discharge nozzle 10 are connected successively, on concrete tank 8 tops, air supply pipe 7 is set, air supply pipe 7 connects air compressor machine, and air supply pipe valve 5 also is installed on air supply pipe 7.
Described bucket 1 and concrete tank 8 welding the first flange 3 suitable for reading, 8 of bucket 1 and concrete tanks arrange between butterfly valve 2, the first flange 3 and butterfly valve 2 and adopt bolt 4 to connect.With bolts between welding the second flange 9, the second flange 9 on concrete tank 8 bottoms and discharge nozzle 10.
Stack 6 is installed on air supply pipe 7, on stack 6, air gauge is installed.
Described discharge nozzle 10 afterbodys arrange flexible pipe 11 to crown backfill position.
While using the utility model, its operating process is:
1, concrete is entered to concrete tank 8 through bucket 1, the charge position is no more than 2/3 of concrete tank volume;
2, close butterfly valve 2;
3, open air compressor machine;
4, the air gauge connected when stack 6 shows that pressure reaches 0.4Mpa when above, opens air supply pipe valve 5;
5, the concrete of concrete tank 8 interior splendid attires enters crown backfill position under the effect of air pressure.
Claims (3)
1. cavern's crown concrete backfill device, it is characterized in that comprising bucket (1), concrete tank (8) and discharge nozzle (10), bucket (1), concrete tank (8) and discharge nozzle (10) are connected successively, on concrete tank (8) top, air supply pipe (7) is set, air supply pipe (7) connects air compressor machine.
2. cavern's crown concrete backfill device according to claim 1, is characterized in that at the upper stack (6) of installing of air supply pipe (7) the upper air gauge of installing of stack (6).
3. cavern's crown concrete backfill device according to claim 1, is characterized in that discharge nozzle (10) afterbody arranges flexible pipe (11) to crown backfill position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320456142.XU CN203383831U (en) | 2013-07-29 | 2013-07-29 | Cavern top arch concrete backfilling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320456142.XU CN203383831U (en) | 2013-07-29 | 2013-07-29 | Cavern top arch concrete backfilling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203383831U true CN203383831U (en) | 2014-01-08 |
Family
ID=49872340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320456142.XU Expired - Lifetime CN203383831U (en) | 2013-07-29 | 2013-07-29 | Cavern top arch concrete backfilling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203383831U (en) |
-
2013
- 2013-07-29 CN CN201320456142.XU patent/CN203383831U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204008645U (en) | A kind of terrestrial stress charger that is applicable to slip casting model test | |
CN203452801U (en) | Sectional pulse grouting system for tunnel construction | |
CN209878238U (en) | Steel pipeline hydrostatic testing machine | |
CN104481581A (en) | Gas-injection coal seam gas displacement physical similarity simulation experiment table | |
CN203383831U (en) | Cavern top arch concrete backfilling device | |
CN206571473U (en) | A kind of girdle extraction system based on microorganism gasification principle | |
CN202370549U (en) | Rapid injection prop lifting boosting device for single hydraulic prop | |
CN115142831B (en) | Method for driving MVR to produce salt by utilizing residual brine pressure of salt cavern gas storage | |
CN204694428U (en) | A kind of axle system stern tube hydraulic sealing test device | |
CN203298939U (en) | Comprehensive test device for pipe interface sealing and hydraulic circulation | |
CN215292577U (en) | Air pulse circulation power effect anti-reflection device for dredging | |
CN202546006U (en) | High pressure-resistant sealing device used for intermediate jacking station of pipe jacking equipment | |
CN105002910A (en) | Cement mortar grouting tank for prestress long anchor rope grouting and application method | |
CN110984918B (en) | Gas lift drainage gas recovery device and method for unconventional gas reservoir horizontal well | |
CN114542946A (en) | Method for generating power by using underground space compressed water for energy storage | |
CN202531240U (en) | Wind pressure drainage device for long and large tunnel | |
CN202431284U (en) | Static-pressure water lift column machine | |
KR20130048515A (en) | High-pressure reservoir having a lining improved in airtightness and stability | |
CN206844229U (en) | A kind of blower pump for pipeline position is higher than the fire cistern of water level | |
CN206647753U (en) | CNG gas stations intelligent control and monitoring system and its gas station | |
CN203130103U (en) | Grouting construction apparatus | |
CN206129306U (en) | Portable vapour -pressure type slip casting device | |
CN211339399U (en) | Full-low-pressure closed acetylene generator with auxiliary generator | |
CN213953623U (en) | Slip casting boosting device | |
CN202787228U (en) | Loose earth body anchor pipe grouting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140108 |