CN203382367U - 一种蜂巢芯吊装装置 - Google Patents
一种蜂巢芯吊装装置 Download PDFInfo
- Publication number
- CN203382367U CN203382367U CN201320456869.8U CN201320456869U CN203382367U CN 203382367 U CN203382367 U CN 203382367U CN 201320456869 U CN201320456869 U CN 201320456869U CN 203382367 U CN203382367 U CN 203382367U
- Authority
- CN
- China
- Prior art keywords
- honeycomb core
- steel wire
- hoisting device
- framework
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种蜂巢芯吊装装置,包括一个矩形的主骨框架,主骨框架的四个角上分别焊接有连接骨架,每个连接骨架上分别通过钢丝绳卡头连接有钢丝绳,四根钢丝绳的上端通过钢丝绳卡头连接在一起并形成吊扣;所述每根钢丝绳的下端都连接有一个吊钩,本实用新型采用上述方案,在蜂巢芯就位时,可以根据楼面板上的肋梁放线尺寸,将四块蜂巢在不脱钩的情况下摆正位置,四块蜂巢芯同时就位,减少了过程调校程序,减少了吊装次数,加快了施工进度,降低了施工成本,节省人力、物力、财力,并且此吊装装置可重复利用,值得推广和应用。
Description
技术领域
本实用新型涉及一种吊装装置,具体的说涉及一种蜂巢芯吊装装置,属于房屋建筑材料吊装技术领域。
背景技术
蜂巢芯箱是建筑工程中空心楼盖的一种。凭借节省材料、减轻楼梯重量、保暖效果好、隔音效果佳等优点被广泛运用于办公楼、车库、立交桥等建筑中。
传统的蜂巢芯吊装方法为:用托盘托住蜂巢芯,然后单钩吊装到施工楼层,再将蜂巢芯搬运至安装位置,此种吊装方法需要两步完成,并且难以调整,工作效率较低。
实用新型内容
本装置所要解决的问题是克服上述施工缺陷,提供一种可提高吊装效率、降低施工成本的蜂巢芯吊装装置。
为了解决上述问题,本实用新型采用以下技术方案:
一种蜂巢芯吊装装置,包括一个矩形的主骨框架,主骨框架的四个角上分别焊接有连接骨架,每个连接骨架上分别通过钢丝绳卡头连接有钢丝绳,四根钢丝绳的上端通过钢丝绳卡头连接在一起并形成吊扣;所述每根钢丝绳的下端都连接有一个吊钩。
以下是本实用新型对上述方案的进一步改进:
主骨框架内焊接有十字型的加强连接筋;十字型的加强连接筋将主骨框架间隔成四个方格。
十字型的加强连接筋将主骨框架间隔成四个方格;每一格的尺寸为蜂巢芯的尺寸与网梁楼盖肋梁的尺寸之和。
本实用新型采用上述方案,在蜂巢芯就位时,可以根据楼面板上的肋梁放线尺寸,将四块蜂巢在不脱钩的情况下摆正位置,四块蜂巢芯同时就位,减少了过程调校程序,减少了吊装次数,加快了施工进度,降低了施工成本,节省人力、物力、财力,并且此吊装装置可重复利用,值得推广和应用。
下面结合附图和实施例对本实用新型作进一步说明。
附图说明
附图1为本实用新型实施例的结构示意图;
附图2为本实用新型实施例中吊装装置对蜂巢芯进行吊装的工作状态图。
图中:1-主骨框架;2-钢丝绳;3-吊扣;4-吊钩;5-连接骨架;6-加强连接筋。
具体实施方式
实施例,如图1所示,一种蜂巢芯吊装装置,包括一个矩形的主骨框架1,主骨框架1内焊接有十字型的加强连接筋6;十字型的加强连接筋6将主骨框架1间隔成四个方格;每一格的尺寸为蜂巢芯的尺寸与网梁楼盖肋梁的尺寸之和。
主骨框架1的四个角上分别焊接有连接骨架5,每个连接骨架5上分别通过钢丝绳卡头连接有钢丝绳2,四根钢丝绳2的上端通过钢丝绳卡头连接在一起并形成吊扣3;
所述每根钢丝绳2的下端都连接有一个吊钩4。
制作时,用工地上的废旧脚手架钢管焊接主骨框架1,在骨架四角用Ф12mm的钢筋焊接连接骨架5,将钢丝绳2与连接骨架5通过钢丝绳卡头连接在一起,四角的钢丝绳2底部各连接一个吊钩4,装置上部的钢丝绳2也通过钢丝绳卡头连接在一起,确保用塔吊吊起时,吊装装置的主骨架处于水平状态,以免在吊装过程中出现蜂巢芯角部相碰现象。
如图2所示,应用此种装置进行蜂巢芯的吊装,在蜂巢芯就位时,可以根据楼面板上的肋梁放线尺寸,将四块蜂巢在不脱钩的情况下摆正位置,四块蜂巢芯同时就位,减少了过程调校程序,减少了吊装次数,加快了施工进度,降低了施工成本,节省人力、物力、财力,并且此吊装装置可重复利用,值得推广和应用。
Claims (2)
1.一种蜂巢芯吊装装置,包括一个矩形的主骨框架(1),其特征在于:
主骨框架(1)的四个角上分别焊接有连接骨架(5),每个连接骨架(5)上分别通过钢丝绳卡头连接有钢丝绳(2),四根钢丝绳(2)的上端通过钢丝绳卡头连接在一起并形成吊扣(3);所述每根钢丝绳(2)的下端都连接有一个吊钩(4)。
2.根据权利要求1所述的一种蜂巢芯吊装装置,其特征在于:
主骨框架(1)内焊接有十字型的加强连接筋(6);十字型的加强连接筋(6)将主骨框架(1)间隔成四个方格。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320456869.8U CN203382367U (zh) | 2013-07-30 | 2013-07-30 | 一种蜂巢芯吊装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320456869.8U CN203382367U (zh) | 2013-07-30 | 2013-07-30 | 一种蜂巢芯吊装装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203382367U true CN203382367U (zh) | 2014-01-08 |
Family
ID=49870879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320456869.8U Expired - Fee Related CN203382367U (zh) | 2013-07-30 | 2013-07-30 | 一种蜂巢芯吊装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203382367U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107934742A (zh) * | 2017-12-15 | 2018-04-20 | 中国电建集团核电工程公司 | 燃机吊装工具及履带式燃机吊装装置 |
-
2013
- 2013-07-30 CN CN201320456869.8U patent/CN203382367U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107934742A (zh) * | 2017-12-15 | 2018-04-20 | 中国电建集团核电工程公司 | 燃机吊装工具及履带式燃机吊装装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711301A (zh) | 双轨道可移动式电动吊篮及升降葫芦施工工法及装置 | |
CN106812328B (zh) | 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法 | |
CN111677299A (zh) | 一种钢筋桁架楼承板的吊拉装置及吊拉方法 | |
CN103711078A (zh) | 一种桥梁施工中临时梁式支架及其拆除方法 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN109881590A (zh) | 桥梁钢箱梁高空作业操作平台及搭建方法 | |
CN106567542A (zh) | 一种超高层双塔楼钢结构连廊组装方法 | |
CN105155748A (zh) | 一种钢筋桁架楼层板整体组合、吊装就位的结构装置 | |
CN102061810B (zh) | 建筑物外围安全平网的施工方法 | |
CN203382367U (zh) | 一种蜂巢芯吊装装置 | |
CN209353734U (zh) | 用于安装幕墙的双轨道装置 | |
CN103046743A (zh) | 一种超高层转换层型钢混凝土大梁吊挂式模板支撑体系及施工方法 | |
CN203947754U (zh) | 电梯井工具式操作平台 | |
CN208197158U (zh) | 一种节段预制箱梁的钢筋胎吊具 | |
CN104131635B (zh) | 一种预制楼梯间周边剪力墙施工方法及施工平台 | |
CN203924652U (zh) | 一种预制楼梯间周边剪力墙的施工平台 | |
CN206784891U (zh) | 一种预制式电梯井操作平台 | |
CN209874434U (zh) | 一种建筑物高空简易外挑脚手架 | |
CN209723565U (zh) | 一种钢-核心筒结构外附塔吊附着施工操作平台 | |
CN211714541U (zh) | 电梯井内剪力墙模板安装专用操作架 | |
CN204326490U (zh) | 一种电梯井施工操作平台 | |
CN209816682U (zh) | 桥梁钢箱梁高空作业操作平台 | |
CN209742334U (zh) | 钢结构连廊底部幕墙施工平台 | |
CN104047418B (zh) | 超高层建筑屋面桁架外装滑车的施工方法 | |
CN206903178U (zh) | 提升式电梯井钢平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140108 Termination date: 20160730 |