CN203365126U CN 201320429338 CN201320429338U CN203365126U CN 203365126 U CN203365126 U CN 203365126U CN 201320429338 CN201320429338 CN 201320429338 CN 201320429338 U CN201320429338 U CN 201320429338U CN 203365126 U CN203365126 U CN 203365126U
Authority
CN
China
Prior art keywords
safety valve
valve
hole
joint
test unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320429338
Other languages
Chinese (zh)
Inventor
王秀芬
田川
金锋
张瑞增
史远
杨玉竹
王卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Beijing Erqi Vehicle Co Ltd
Original Assignee
CSR Erqi Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Erqi Vehicle Co Ltd filed Critical CSR Erqi Vehicle Co Ltd
Priority to CN 201320429338 priority Critical patent/CN203365126U/en
Application granted granted Critical
Publication of CN203365126U publication Critical patent/CN203365126U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an empty-vehicle safety valve test apparatus. The empty-vehicle safety valve test apparatus is characterized by comprising a bracing frame, a volume air reservoir, a safety valve joint, a pressure-regulating valve, a rotary valve, a pressure gauge, and several pipelines used for connection. A work bench is arranged on the top portion of the bracing frame. A first installation through hole, a second installation through hole, and a third installation through hole are arranged on the work bench at intervals. The safety valve joint is arranged inside the first installation through hole. A first branch pipeline, a second branch pipeline, and a third branch pipeline are in parallel connection on a bottom joint port portion of a joint head of the safety valve joint. An outer end portion of the first branch pipeline is connected with the volume air reservoir. An outer end portion of the second branch pipeline goes through the second installation through hole to be connected with the pressure gauge. An outer end portion of the third branch pipeline is connected with a wind source. The pressure-regulating valve and the rotary valve are sequentially in series connection in the pipeline between the wind source and the safety valve joint. The rotary valve is arranged inside the third installation through hole in a fixed mode. The empty-vehicle safety valve test apparatus of the utility model can be widely applied to tests of railway freight car safety valves.

Description

A kind of empty wagon safety valve test unit
Technical field
The utility model relates to a kind of braking device test unit, particularly about a kind of empty wagon safety valve test unit that is applicable to railway freight-car.
Background technology
Empty wagon safety valve (hereinafter to be referred as " safety valve ") is for the empty and load brake equipment of railway freight-car automatic braker, be assembled on the connecting pipeline of checking cylinder and step-down reservoir, when the empty wagons brake-cylinder pressure is too high, the pressure air of getting rid of checking cylinder, and then the pressure of control checking cylinder, prevent empty wagons wiping wheel.The safety valve action principle is the level pressure that checking cylinder surpasses regulation, and by the pressure air of checking cylinder, discharged to atmosphere, before cylinder pressure air to be braked is down to 160kPa, safety valve stops exhaust.Good in order to ensure railway freight-car empty wagons braking ability, before the safety valve entrucking, should make a service test.At present, the safety valve test device can be divided into two classes, and a class formation is simple and easy, but its complicated operation can not meet the requirement of safety valve performance test fully; Another kind of safety valve assembling need to being got on the bus just can be tested afterwards, if the safety valve performance is undesirable like this, needs the operator to reprocess, the work efficiency reduction; Also may affect braking ability after the safety valve entrucking, cause railway freight-car empty wagons security of operation hidden danger.
Summary of the invention
For the problems referred to above, the purpose of this utility model is to provide a kind of safety valve test device of simple in structure and easy to operate, pressure stability.
For achieving the above object, the utility model is taked following technical scheme: a kind of empty wagon safety valve test unit is characterized in that: it comprises a bracing frame, a volume reservoir, a safety valve joint, a pressure regulator valve, single-revolution valve, a tensimeter and some connecting pipes road; The support frame as described above top arranges a worktable, is arranged at intervals with first to the 3rd on described worktable through hole is installed, and described safety valve joint is arranged on described first and installs in through hole, and described safety valve joint bottom interface place first to the 3rd bye-pass that is connected in parallel; The outer end of described the first bye-pass connects described volume reservoir; The outer end of described the second bye-pass is installed through hole through described second and is connected described tensimeter; The outer end of described the 3rd bye-pass connects a wind regime, on the pipeline between described wind regime and described safety valve joint, is connected in series successively described pressure regulator valve and revolving valve, and described revolving valve is fixedly installed on the described the 3rd and installs in through hole.
Single-revolution valve operating grip is set on described revolving valve, and is arranged at intervals with on described revolving valve and fills soon wind, trickle charge wind, pressurize and gears are controlled in four of air drafts.
Support frame as described above comprises four spaced supporting legs, and described worktable is fixedly installed on four described supporting leg tops, and four described supporting leg bottoms are welded with base plate, between each adjacent described supporting leg, is provided with horizontal and vertical reinforcement gusset.
Described manometric precision adopts 1.5 grades, and range is 0~400kPa, and described manometric dial plate is that 170kPa and 190kPa reading place are provided with mark line at pressure.
The range of regulation of described pressure regulator valve is 100kPa~400kPa, and the volume of described volume reservoir adopts 17L.
The utility model is owing to taking above technical scheme, it has the following advantages: 1, the utility model comprises bracing frame, volume reservoir, safety valve joint, pressure regulator valve, revolving valve, tensimeter and some connecting pipes road, only be provided with safety valve, revolving valve and tensimeter on worktable, and other parts such as volume reservoir, pressure regulator valve, connecting line all are arranged on below worktable, install simple and convenient, compare with the existing rear process that just can be tested of the safety valve assembling need to being got on the bus, effectively improved work efficiency.2, the utility model, owing on the 3rd bye-pass of wind regime and safety valve joint, being connected a pressure regulator valve, can be adjusted into 200~300kPa by air intake pressure, and can keep pressure stability, so the utility model pressure stability.3, the utility model will fill on wind, trickle charge wind, pressurize and four control gear concentrated setting revolving valves of air draft soon, and suitable while filling wind speed degree and railway wagon brake, therefore can by revolving valve, to the braking ability of safety valve, be tested easily, compact conformation, practicality are good.4, the utility model is provided with tensimeter on worktable, therefore can to the pressure in the safety valve test process, be monitored easily.The utility model can be widely used in the performance test of railway freight-car safety valve.
The accompanying drawing explanation
Fig. 1 is the structural representation of the utility model test unit;
Fig. 2 is the structural representation of the utility model bracing frame;
Fig. 3 is the schematic top plan view of the utility model bracing frame;
Fig. 4 is the control gear positions schematic diagram of the utility model revolving valve.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in detail.
As shown in Figures 1 to 3, empty wagon safety valve test unit of the present utility model comprises a bracing frame 1, a volume reservoir 2, a safety valve joint 3, a pressure regulator valve 4, single-revolution valve 5, a tensimeter 6 and some connecting pipes road.
Bracing frame 1 top arranges a worktable 11, is arranged at intervals with first to the 3rd on worktable 11 through hole 12 is installed.Safety valve joint 3 is fixedly installed in the first installation through hole 12, for joint test empty wagons valve, sews in order to prevent from testing, and safety valve joint 3 has sealing function.The bottom interface of safety valve joint 3 is by pipeline first to the 3rd bye-pass 71~73 that is connected in parallel.The outer end of the first bye-pass 71 connects the outlet of volume reservoir 2, and volume reservoir 2 is for simulating the step-down reservoir be connected with safety valve on railway freight-car.The outer end of the second bye-pass 72 is upward through the second installation through hole 12 Bonding pressure tables 6, and tensimeter 6 is monitored for the pressure to safety valve.The outer end of the 3rd bye-pass 73 connects an external wind regime (pressure air), wind regime is for providing power to the empty wagon safety valve test unit, be connected in series successively pressure regulator valve 4 and revolving valve 5 on pipeline between wind regime and safety valve joint 3, pressure regulator valve 4 is regulated for the air intake pressure to entering the 3rd bye-pass 73, revolving valve 5 is controlled for the state to the 3rd bye-pass 73 pressure airs, for handled easily, revolving valve 5 is fixedly installed on the 3rd and installs in through hole 12.
In a preferred embodiment, as shown in Figure 4, for convenient, revolving valve 5 is rotated to operation, single-revolution valve operating grip is set on revolving valve 5.Suitable in order to make to fill wind speed degree and railway wagon brake, revolving valve 5 is arranged at intervals with and fills soon wind, trickle charge wind, pressurize and four of air drafts and control gears.Four particular locations of controlling gear of revolving valve 5 are not construed as limiting, and can be set according to actual needs, but require easy to operate.In the present embodiment, four of revolving valve 5 control gears are arranged as counterclockwise and fill soon wind 51, trickle charge wind 52, pressurize 53 and air draft 54.Four effects of controlling gear of revolving valve 5 are respectively: control gear when filling soon wind 51 or trickle charge wind 52 when revolving valve 5, the state of the 3rd bye-pass 73 in the charged pressure air, just fill wind speed degree speed difference; Revolving valve 5 is controlled gear when pressurize 53, cuts off the path of revolving valve 5 pressure at both sides air in the 3rd bye-pass, but now all there is pressure air revolving valve 5 both sides; Revolving valve 5 is controlled gear when air draft 54, cut off the path of revolving valve 5 pressure at both sides air in the 3rd bye-pass, the pressure air that now retains revolving valve 5 one sides (between revolving valve and wind regime), discharge the pressure air of revolving valve opposite side, when the empty wagon safety valve test unit is not worked, the control gear of revolving valve 51 is set to air draft 54.
In a preferred embodiment, as shown in Figure 2 and Figure 3, bracing frame 1 comprises four spaced supporting legs 13, worktable 11 is fixedly installed on four supporting leg 13 tops, and four supporting leg 13 bottoms are welded with base plate 14, and base plate 14 is for placing volume reservoir 2, in order to strengthen the intensity of bracing frame, be provided with horizontal and vertical reinforcement gusset between each adjacent support legs 13, also each connecting line can be fixed with strengthening gusset, prevent that each connecting line from rocking.Bracing frame 1 can adopt the structural section assembly welding of different size to form, and to meet the strength and stiffness requirement of test unit, worktable 2 can adopt 4mm, 6mm or 8mm steel plate to make according to actual needs.
In a preferred embodiment, volume reservoir 2 volumes are identical with the step-down reservoir volume of railway freight-car, have when keeping the safety valve air draft a certain amount of pressure air to discharge, and the volume of volume reservoir 2 can adopt 17L.
In a preferred embodiment, the range of regulation of pressure regulator valve 4 is 100kPa~400kPa.
In a preferred embodiment, the precision of tensimeter 6 can adopt 1.5 grades, and range is 0~400kPa, and in order to allow operating personnel can clearly see the indicated value of tensimeter 6, the tensimeter dial plate is that 170kPa and 190kPa reading place are provided with mark line at pressure.
In a preferred embodiment, pipeline can adopt steel pipe, elbow or the threeway of DN20 to be connected.
The using method of empty wagon safety valve test unit of the present utility model comprises the following steps:
1, a safety valve to be detected is fixedly connected on safety valve joint 3, checks that must not there be leakage both junctions.
2, after confirming the sealing of safety valve junction, open wind regime, it is 200~300kPa that adjustment pressure regulator valve 4 makes the initial air intake pressure of the 3rd bye-pass, then enter step 3, the concrete numerical value of initial air intake pressure is not construed as limiting and can be set according to test, but should be less than or equal to 300kPa, if easily make safety valve or tensimeter 6 damage after being greater than 300kPa.
3, rotating the revolving valve handle makes its control gear be placed in and fill soon wind 51 from air draft 54, safety valve is carried out to braking ability test, while by tensimeter 6 monitoring safety valve pressures, reaching 190kPa, safety valve 6 should start air draft, if not carrying out air draft, safety valve thinks that this safety valve is defective, if safety valve air draft enter step 4.
4, rotating the revolving valve handle makes its control gear be placed in pressurize 53 by filling soon wind 51, while by tensimeter 6 monitoring safety valve pressures, being 160kPa or 170kPa, (newly making safety valve is 170kPa, the maintenance safety valve is 160kPa), safety valve should stop air draft, if now safety valve continues air draft, think that this safety valve is defective, if safety valve stops air draft, enter step 5.
5, adopt hairbrush that antirust leak-checking agent is smeared to each position of safety valve safety valve is detected, sew if safety valve is learnt in detection, think that this safety valve is defective, if safety valve is no-leak, enter step 6.
6, rotating the revolving valve handle makes its control gear be placed in trickle charge wind 52 by pressurize 53, while by tensimeter 6, monitoring safety valve pressures to 180kPa, control file location while rotating again the revolving valve handle in pressurize 53, adopting hairbrush that antirust leak-checking agent is smeared to each position of safety valve is detected, if now safety valve is sewed, think that this safety valve is defective, if safety valve is no-leak, enter step 7.
7, after safety valve test, rotate the revolving valve handle and make its control gear be placed in air draft 54, whole empty wagon safety valve test unit is carried out to air draft, after air draft, pull down safety valve.Qualified safety valve is put into to the certified products district, can come into operation, defective safety valve is put into to NonConforming Parts Area, tested again after defective safety valve is returned something for repairs, just can come into operation after stand the test.
Above-described embodiment is only for illustrating the utility model; wherein step of the structure of each parts, connected mode and implementation method etc. all can change to some extent; every equivalents of carrying out on the basis of technical solutions of the utility model and improvement, all should not get rid of outside protection domain of the present utility model.

Claims (7)

1. an empty wagon safety valve test unit, it is characterized in that: it comprises a bracing frame, a volume reservoir, a safety valve joint, a pressure regulator valve, single-revolution valve, a tensimeter and some connecting pipes road; The support frame as described above top arranges a worktable, is arranged at intervals with first to the 3rd on described worktable through hole is installed, and described safety valve joint is arranged on described first and installs in through hole, and described safety valve joint bottom interface place first to the 3rd bye-pass that is connected in parallel; The outer end of described the first bye-pass connects described volume reservoir; The outer end of described the second bye-pass is installed through hole through described second and is connected described tensimeter; The outer end of described the 3rd bye-pass connects a wind regime, on the pipeline between described wind regime and described safety valve joint, is connected in series successively described pressure regulator valve and revolving valve, and described revolving valve is fixedly installed on the described the 3rd and installs in through hole.
2. a kind of empty wagon safety valve test unit as claimed in claim 1 is characterized in that: single-revolution valve operating grip is set on described revolving valve, and is arranged at intervals with on described revolving valve and fills soon wind, trickle charge wind, pressurize and four of air drafts and control gears.
3. a kind of empty wagon safety valve test unit as claimed in claim 1, it is characterized in that: support frame as described above comprises four spaced supporting legs, described worktable is fixedly installed on four described supporting leg tops, four described supporting leg bottoms are welded with base plate, between each adjacent described supporting leg, are provided with horizontal and vertical reinforcement gusset.
4. a kind of empty wagon safety valve test unit as claimed in claim 2, it is characterized in that: support frame as described above comprises four spaced supporting legs, described worktable is fixedly installed on four described supporting leg tops, four described supporting leg bottoms are welded with base plate, between each adjacent described supporting leg, are provided with horizontal and vertical reinforcement gusset.
5. a kind of empty wagon safety valve test unit as claimed in claim 1 or 2 or 3 or 4, it is characterized in that: described manometric precision adopts 1.5 grades, range is 0~400kPa, and described manometric dial plate is that 170kPa and 190kPa reading place are provided with mark line at pressure.
6. a kind of empty wagon safety valve test unit as claimed in claim 1 or 2 or 3 or 4, it is characterized in that: the range of regulation of described pressure regulator valve is 100kPa~400kPa, the volume of described volume reservoir adopts 17L.
7. a kind of empty wagon safety valve test unit as claimed in claim 5, it is characterized in that: the range of regulation of described pressure regulator valve is 100kPa~400kPa, the volume of described volume reservoir adopts 17L.
CN 201320429338 2013-07-18 2013-07-18 An empty-vehicle safety valve test apparatus Expired - Fee Related CN203365126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320429338 CN203365126U (en) 2013-07-18 2013-07-18 An empty-vehicle safety valve test apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320429338 CN203365126U (en) 2013-07-18 2013-07-18 An empty-vehicle safety valve test apparatus

Publications (1)

Publication Number Publication Date
CN203365126U true CN203365126U (en) 2013-12-25

Family

ID=49812872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320429338 Expired - Fee Related CN203365126U (en) 2013-07-18 2013-07-18 An empty-vehicle safety valve test apparatus

Country Status (1)

Country Link
CN (1) CN203365126U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103344428A (en) * 2013-07-18 2013-10-09 南车二七车辆有限公司 Empty wagon safety valve test device and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103344428A (en) * 2013-07-18 2013-10-09 南车二七车辆有限公司 Empty wagon safety valve test device and use method thereof
CN103344428B (en) * 2013-07-18 2016-01-20 南车二七车辆有限公司 A kind of using method of empty wagon safety valve test device

Similar Documents

Publication Publication Date Title
CN103293006B (en) A kind of method for determining agitator truck load spectrum of auxiliary frame
CN102944367B (en) Equipment for evaluating sealing property of automobile rear axle housing
CN202110045U (en) Seal detection apparatus
CN108278494B (en) Rail vehicle air pipeline system leak detection method
CN103196633A (en) Air impermeability detection device
KR20100007130U (en) The fluid valve test equipment
CN203224342U (en) Air tightness detection device
CN102507107B (en) Test equipment used for measuring air tightness of carriage
CN203365126U (en) An empty-vehicle safety valve test apparatus
CN206670921U (en) The heavy vehicle of steyr 1491 brakes gas circuit experimental rig
CN205898435U (en) Gas -liquid brake valve test bench
CN103344428B (en) A kind of using method of empty wagon safety valve test device
CN204666321U (en) A kind of automobile clamp comprehensive sealing device for detecting performance
CN207957652U (en) Automobile loads brake platform lifting device
CN202631200U (en) Air-tightness inspection equipment
CN206056954U (en) A kind of testing stand for detecting drive axle
CN106427973B (en) Screening method for relay valve of CRH380 series motor train unit
CN215598616U (en) EMUs hook allies oneself with hangs function test appearance
CN202110046U (en) Leakage testing system for liquid container of automobile shock absorber
CN202676394U (en) Blind flange tightness testing device
CN204988654U (en) A automated inspection equipment that is used for rim welding seam gas tightness to detect
CN202814802U (en) Self-sealing pressurizing system of high-pressure water pressure test pipe machine
CN102865974A (en) Leakage detection method for air pipelines of large-sized road maintenance machine product
CN106289676A (en) A kind of for clutch hydraulic cylinder air-tightness automatic detection device
CN202582845U (en) Pressurizing cover board device for valve air tightness test

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20180718