CN203348751U - Hanging hole tray for floor penetrating pipeline - Google Patents

Hanging hole tray for floor penetrating pipeline Download PDF

Info

Publication number
CN203348751U
CN203348751U CN2013203769172U CN201320376917U CN203348751U CN 203348751 U CN203348751 U CN 203348751U CN 2013203769172 U CN2013203769172 U CN 2013203769172U CN 201320376917 U CN201320376917 U CN 201320376917U CN 203348751 U CN203348751 U CN 203348751U
Authority
CN
China
Prior art keywords
semi
circular board
pipeline
circular plate
covering tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203769172U
Other languages
Chinese (zh)
Inventor
崔秀峰
杨光芒
邓雄
欧阳坤
张鑫涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN2013203769172U priority Critical patent/CN203348751U/en
Application granted granted Critical
Publication of CN203348751U publication Critical patent/CN203348751U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a wear floor pipeline and hang hole tray is equipped with first semi-circular board (3) on first semi-circular board (1), is equipped with second semi-circular board (4) on second semi-circular board (2), first semi-circular board (1) with second semi-circular board (2) between adopt fastening bolt (5) to connect and form a whole circle tray, first semi-circular board (3) with second semi-circular board (4) constitute a whole sleeve pipe. The utility model provides a difficult department of template construction before pouring is worn the wall pipeline to the floor, has solved the peripheral new construction process who leaks of pipeline, the position is inaccurate, the quality general illness such as binding off is pleasing to the eye leads to the fact and adopts, and the preparation is convenient, simple structure, dependable performance, low cost improve efficiency, green, can use widely in a large number.

Description

The through-flooring pipeline hangs the hole pallet
Technical field
The utility model relates to a kind of pallet, particularly relates to a kind of through-flooring pipeline that coordinates template to carry out pipe plugging while being applicable to the concreting of fill pipe through-flooring and hangs the hole pallet.
Background technique
Due to the needs of house use function water supply and sewerage pipeline, in the floor slab construction process, pre-buried pipeline must through-flooring.Its traditional operation is that the workman must reserve the hole of duct size before the floor concreting on template, adopt the steel wire hanging in template, not only absolute altitude and horizontal location are wayward, and the outward-dipping gradient is also wayward, sometimes also easily reveal concrete, after causing, secondary picks to beat affects masonry structure safety.More seriously the degree of compaction of tube circumference is difficult to guarantee, causes this sleeve pipe periphery leakage proof to be difficult to guarantee, thereby affects the use function in house.
The following problem of normal appearance:
(1) the template hole to be provided size of processing does not meet the reserved holes of pipes requirement, not only affects pipeline opening attractive in appearance, and easily causes the floor infiltration
(2) when pipeline is installed on template, perpendicularity is controlled badly, and usually occurring that pipeline tilts can't be to its phenomenon.
The model utility content
The through-flooring pipeline that technical problem to be solved by this invention is to provide a kind of common quality defect occurred can prevent through-flooring pipeline concreting the time hangs the hole pallet.
In order to solve the problems of the technologies described above, the through-flooring pipeline that the utility model provides hangs the hole pallet, the first semi-circular plate is provided with the first half-covering tube, the second semi-circular plate is provided with the second half-covering tube, between described the first semi-circular plate and described the second semi-circular plate, adopt clamping bolt to connect to form a full circle pallet, described the first half-covering tube and described the second half-covering tube sleeve pipe that forms a whole.
Adopt the through-flooring pipeline of technique scheme to hang the hole pallet, during use, between the first semi-circular plate and the second semi-circular plate, adopt clamping bolt to be connected, the first semi-circular plate and the second semi-circular plate form a full circle pallet, the first half-covering tube and the second half-covering tube sleeve pipe that forms a whole, the first half-covering tube and the second half-covering tube block are solidified in masonry, and the first semi-circular plate and the second semi-circular plate have sealed hole.Its advantage is as follows:
(1) in masonry construction, solidify because the through-flooring pipeline hangs the hole pallet, guaranteed in advance the accuracy of through-flooring pipe built-in absolute altitude and position;
(2) this member is being fixed, made sleeve pipe upward, the weight that fastening screw allows this member be stuck on pipeline and can bear all cheek boards;
(3) this member has well been controlled the length of sleeve pipe, has evaded well the hole blockage problem caused when the concreting front template is prefabricated, has guaranteed to receive the quality closed up in limit.
In sum, the utility model be a kind of when solving through-flooring pipeline coagulation soil and building shutoff the through-flooring pipeline of quality problems hang the hole pallet, easy to make, simple in structure, reliable performance, with low cost, improve effect, environmental protection, can large-scale popularization use.
The accompanying drawing explanation
Fig. 1 is pipeline through-flooring figure.
Fig. 2 is plan view of the present utility model.
Fig. 3 is the utility model profile.
Fig. 4 is the member installation diagram.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Referring to Fig. 1, it is pipeline through-flooring schematic diagram.
Referring to Fig. 2 and Fig. 3, it is the detachable member of hollow that the through-flooring pipeline hangs the hole pallet, the first semi-circular plate 1 is provided with the first half-covering tube 3, the second semi-circular plate 2 is provided with the second half-covering tube 4, between described the first semi-circular plate 1 and described the second semi-circular plate 2, adopt clamping bolt 5 to be connected, described the first semi-circular plate 1 forms a full circle pallet with described the second semi-circular plate 2, the first half-covering tube 3 and the second half-covering tube 4 sleeve pipe that forms a whole.
Referring to Fig. 2, Fig. 3 and Fig. 4, the integral cannula that the first half-covering tube 3 and the second half-covering tube 4 form is the reserved holes of pipes size, regulates the tightness of encircling of the first half-covering tube 3 and 4 pairs of pipelines of the second half-covering tube with clamping bolt 5.
During use, between the first semi-circular plate 1 and the second semi-circular plate 2, adopt fastening screw 5 to be connected, the first semi-circular plate 1 and the second semi-circular plate 2 form a full circle pallet, the first half-covering tube 3 and the second half-covering tube 4 sleeve pipe that forms a whole, the first half-covering tube 3 and the second half-covering tube 4 blocks are solidified in masonry, and the first semi-circular plate 1 and the second semi-circular plate 2 have sealed hole.
Be arranged on rear effect on pipeline referring to Fig. 4 for this member.

Claims (1)

1. a through-flooring pipeline hangs the hole pallet, it is characterized in that: the first semi-circular plate (1) is provided with the first half-covering tube (3), the second semi-circular plate (2) is provided with the second half-covering tube (4), between described the first semi-circular plate (1) and described the second semi-circular plate (2), adopt clamping bolt (5) to connect to form a full circle pallet, described the first half-covering tube (3) and described the second half-covering tube (4) sleeve pipe that forms a whole.
CN2013203769172U 2013-06-27 2013-06-27 Hanging hole tray for floor penetrating pipeline Expired - Fee Related CN203348751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203769172U CN203348751U (en) 2013-06-27 2013-06-27 Hanging hole tray for floor penetrating pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203769172U CN203348751U (en) 2013-06-27 2013-06-27 Hanging hole tray for floor penetrating pipeline

Publications (1)

Publication Number Publication Date
CN203348751U true CN203348751U (en) 2013-12-18

Family

ID=49748651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203769172U Expired - Fee Related CN203348751U (en) 2013-06-27 2013-06-27 Hanging hole tray for floor penetrating pipeline

Country Status (1)

Country Link
CN (1) CN203348751U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211259A (en) * 2020-10-12 2021-01-12 福建省锦秋建筑工程有限公司 Connection module of water supply and drainage system of green building and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211259A (en) * 2020-10-12 2021-01-12 福建省锦秋建筑工程有限公司 Connection module of water supply and drainage system of green building and construction method thereof
CN112211259B (en) * 2020-10-12 2021-10-29 福建省锦秋建筑工程有限公司 Connection module of water supply and drainage system of green building and construction method thereof

Similar Documents

Publication Publication Date Title
CN204825881U (en) A deep steel sheet net dado section of thick bamboo suitable for soft soil area bored concrete pile of driling
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN203348751U (en) Hanging hole tray for floor penetrating pipeline
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN202227694U (en) Embedded sleeve for concrete pouring construction of bathroom floor
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN204083520U (en) Pipeline runs through concrete floor waterproof construction
CN205839812U (en) A kind of post-cast strip pretreatment unit
CN204647576U (en) Concrete floor pre-arranged hole mouth water sealing structure
CN202530518U (en) Embedded device at sewer line in toilet
CN205577031U (en) Take hot and cold water pipe plug position unscrambler of scale
CN203979669U (en) Can locate the structure antiseepage built-in joint pipe fitting in axle center
CN202788874U (en) Embedded grouting guide tube device in chamber lining concrete
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN203238822U (en) PVC water draining sleeve and composite plate composite structure
CN102995644B (en) What Whirlwind tank connect rock section goes along with sb. to guard him enclosed construction
CN201785817U (en) Overflow-prevention piping system for high-rise buildings
CN206673539U (en) A kind of cable laying piping lane
CN205907763U (en) A location structure for underground piping
CN205207920U (en) Pass through waterpipe leak preventing of reinforced concrete floor and connect pipe fitting
CN205716057U (en) Butt type square tube downpipe
CN211548776U (en) Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff
CN203499250U (en) Concrete formwork structure for floor plate-penetrating pipe
CN217205458U (en) Water-stop joint protection and installation device
CN215635439U (en) Drain pipe pre-embedding device with telescopic and waterproof functions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131218

Termination date: 20180627

CF01 Termination of patent right due to non-payment of annual fee