CN203334768U - Cemetery building - Google Patents

Cemetery building Download PDF

Info

Publication number
CN203334768U
CN203334768U CN2013203427476U CN201320342747U CN203334768U CN 203334768 U CN203334768 U CN 203334768U CN 2013203427476 U CN2013203427476 U CN 2013203427476U CN 201320342747 U CN201320342747 U CN 201320342747U CN 203334768 U CN203334768 U CN 203334768U
Authority
CN
China
Prior art keywords
cemetery
tomb
building
soil layer
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203427476U
Other languages
Chinese (zh)
Inventor
赵伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013203427476U priority Critical patent/CN203334768U/en
Application granted granted Critical
Publication of CN203334768U publication Critical patent/CN203334768U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model provides a cemetery building which comprises a building body provided with at least two stories and cemetery positions arranged in each storey. Each cemetery position a grave. A soil layer is laid on a floor of each storey. The graves are arranged in the soil layers. A plurality of communicated artificial channels are formed in each soil layer. Each soil layer is divided into a plurality of cemetery zones by the artificial channels. The cemetery zones are communicated with one another through artificial bridges on the artificial channels. Each cemetery zone comprises at least one cemetery group. Each cemetery group is provided with a plurality of cemetery positions. A main road is arranged between every two cemetery groups. The two sides of each main road, the two sides of each artificial channel and the periphery of each cemetery position are respectively provided with a vegetation region. The cemetery building has the advantages that design is scientific, the ground burial mode and the burial environment can be accepted by people easily, the use ratio of the cemetery building is improved, and family cemetery groups are offered.

Description

Cemetery building
Technical field
The utility model relates to a kind of cemetery building, specifically, has related to the cemetery building of cemetery, a kind of imitative ground outdoor scene.
Background technology
People, in order to save the burial in the ground land used, have invented cemetery building, on the floor of every floor, build and establish a plurality of cement coffin pit or marble coffin pit, for laying cinerary casket.Soil has been saved in this design really, but, cemetery building does not have environment and the atmosphere in cemetery, ground after all, and Chinese are particular about, and burial brings peace to the deceased, and the coffin pit of cemetery building is only to build to be located on hard icy water mud ground plate at present, make cinerary casket there is no the sensation of " burying ", be difficult to allow the deceased family members accept this burying method, cause the utilization rate of cemetery building not high.Therefore, if want, allow people accept psychologically cemetery building, just must make cemetery building there is environment and the atmosphere in cemetery, ground.
In order to solve the problem of above existence, people are seeking a kind of desirable technical solution always.
Summary of the invention
The purpose of this utility model is for the deficiencies in the prior art, thereby a kind of design science, burial in the ground mode is provided and buries the cemetery building that environment is easy to people's acceptance, raising cemetery building utilization rate, has familial tomb.
To achieve these goals, the technical scheme that the utility model adopts is: a kind of cemetery building, comprise the building body with at least two floors and be arranged on the tomb position in each described floor, described tomb position comprises coffin pit, all be equipped with soil layer on the floor of each described floor, described coffin pit is arranged in described soil layer.
Based on above-mentioned, be provided with many sloots that communicate in described soil layer, described sloot is divided into a plurality of tombs district by described soil layer, between described tomb district, by being located at artificial bridging on described sloot, leads to.
Based on above-mentioned, each described tomb district includes at least one tomb, and each described tomb is provided with a plurality of tombs position, between described tomb, is provided with major trunk roads, in described major trunk roads both sides, around described sloot both sides and described tomb position, is equipped with vegetation region.
Based on above-mentioned, described tomb position also comprises the gravestone of being located at described coffin pit rear side and is located at front side, described coffin pit sacrificial offerings platform.
Based on above-mentioned, the wall of described floor comprises the clear glass wall with vent window.
The relative prior art of the utility model has substantive distinguishing features and progress, specifically, the utility model is arranged at coffin pit in soil layer, the bone ash that can allow relatives produce the deceased has the sensation that burial brings peace to the deceased, allow the deceased relatives burial in the ground mode of acceptant cemetery building formula psychologically, and then improved the utilization rate of cemetery building; Emulation river course and artificial hillock have the effect of simulation cemetery, ground outdoor scene, plant flowers and plants in addition, have beautified the burial environment, and cemetery building is more easily accepted by the deceased family members; It is applicable that the tomb be comprised of a plurality of coffin pits is applicable to familial burial, to meet client's needs.This cemetery building has advantages of that design science, burial in the ground mode and burial environment are easy to people and accept, improve the cemetery building utilization rate, have familial tomb.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of tomb position.
In figure: 1. floor; 2. coffin pit; 3. soil layer; 4. cinerary casket; 5. sloot; 6. artificial bridge; 7. major trunk roads; 8. vegetation region; 9. gravestone; 10. sacrificial offerings platform; 11. vent window; 12. staircase.
The specific embodiment
Below by the specific embodiment, the technical solution of the utility model is described in further detail.
As shown in Figure 1 and Figure 2, a kind of cemetery building comprises the building body with at least two floors 1 and is arranged on the tomb position in each described floor 1 that described tomb position comprises coffin pit 2, all be equipped with soil layer 3 on the floor of each described floor 1, described coffin pit 2 is arranged in described soil layer 3.The benefit of design is like this, due to the existence of soil layer 3, the burial in the ground formula sight in simulation cemetery, ground, the deceased's bone ash the is had meaning of " burial brings peace to the deceased ", allow the deceased relatives burial in the ground mode of acceptant this cemetery building formula psychologically, improved the utilization rate of cemetery building.Can hold a cinerary casket 4 in described coffin pit 2, also can hold two or more cinerary caskets 4 in the mode of burying in the same grave.
As shown in Figure 1, be provided with many sloots that communicate 5 in described soil layer 3, described sloot 5 is divided into a plurality of tombs district by described soil layer 3, between described tomb district, by being located at artificial bridge 6 on described sloot 5, is communicated with, and described soil layer 3 is or/and be provided with artificial hillock in described sloot 5.Described sloot 5, described artificial bridge 6 and described artificial hillock have the effect of simulation cemetery, ground outdoor scene, make cemetery building more easily allow the deceased family members accept.
Each described tomb district includes at least one tomb, and each described tomb is provided with a plurality of tombs position. and the effect of tomb is according to client's needs, each tomb can be represented to a family for as familial burial, carries out complete sale.The quantity in the size of tomb coffin pit in tomb determines.Be provided with major trunk roads 7 between described tomb, be equipped with vegetation region 8 in described major trunk roads 7 both sides, described sloot 5 both sides and described tomb position on every side.Described vegetation region 8 is used for simulating cemetery, ground outdoor scene, makes it to seem the vegetation environmental closer to the cemetery, ground.
As shown in Figure 2, described tomb position also comprises the gravestone 9 of being located at described coffin pit 2 rear sides and is located at described coffin pit 2 front side sacrificial offerings platforms 10.Design is to make the coffin pit 2 in cemetery building have outward appearance and the function identical with coffin pit, cemetery, traditional ground like this, facilitates the deceased relatives to hold a memorial ceremony for and visits, and makes the deceased relatives be easy to accept the burying method of cemetery building formula.
As shown in Figure 1, the wall of described floor 1 comprises the clear glass wall with vent window 11.Described clear glass wall has guaranteed the sufficient light in floor, and described vent window 11 makes the interior air of floor unimpeded, and described wall can all be set to described clear glass wall, also can partly be set to described clear glass wall.
Described cemetery building is provided with staircase 12, in described staircase 12, is provided with stair and elevator.
Finally should be noted that: above embodiment is only in order to illustrate that the technical solution of the utility model is not intended to limit; Although with reference to preferred embodiment, the utility model is had been described in detail, those of ordinary skill in the field are to be understood that: still can modify or the part technical characterictic is equal to replacement the specific embodiment of the present utility model; And not breaking away from the spirit of technical solutions of the utility model, it all should be encompassed in the middle of the technical scheme scope that the utility model asks for protection.

Claims (5)

1. a cemetery building, comprise the building body with at least two floors and be arranged on the tomb position in each described floor, and described tomb position comprises coffin pit, it is characterized in that: all be equipped with soil layer on the floor of each described floor, described coffin pit is arranged in described soil layer.
2. cemetery building according to claim 1, it is characterized in that: be provided with many sloots that communicate in described soil layer, described sloot is divided into a plurality of tombs district by described soil layer, logical by being located on described sloot artificial bridging between described tomb district.
3. cemetery building according to claim 2, it is characterized in that: each described tomb district includes at least one tomb, each described tomb is provided with a plurality of tombs position, be provided with major trunk roads between described tomb, in described major trunk roads both sides, around described sloot both sides and described tomb position, be equipped with vegetation region.
4. cemetery building according to claim 3, it is characterized in that: described tomb position also comprises the gravestone of being located at described coffin pit rear side and is located at front side, described coffin pit sacrificial offerings platform.
5. according to the described cemetery building of claim 1-4 any one, it is characterized in that: the wall of described floor comprises the clear glass wall with vent window.
CN2013203427476U 2013-06-17 2013-06-17 Cemetery building Expired - Fee Related CN203334768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203427476U CN203334768U (en) 2013-06-17 2013-06-17 Cemetery building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203427476U CN203334768U (en) 2013-06-17 2013-06-17 Cemetery building

Publications (1)

Publication Number Publication Date
CN203334768U true CN203334768U (en) 2013-12-11

Family

ID=49703447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203427476U Expired - Fee Related CN203334768U (en) 2013-06-17 2013-06-17 Cemetery building

Country Status (1)

Country Link
CN (1) CN203334768U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909042A (en) * 2016-06-08 2016-08-31 肖剑 Green ecological three-dimensional architecture cemetery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909042A (en) * 2016-06-08 2016-08-31 肖剑 Green ecological three-dimensional architecture cemetery

Similar Documents

Publication Publication Date Title
Dien et al. Six dynasties civilization
CN203334768U (en) Cemetery building
Niroumand et al. Hill development by Earth architecture
CN202578118U (en) Public sacrifice cemetery building
Nikolić Evaluation of the protection and presentation of historic buildings in the Viminacium Archaeological Park in relation to their spatial context
CN205370083U (en) Concentrate palace formula ecotecture of settling cinerary casket
JP3184381U (en) Tumulus-type cemetery and underground cemetery
Lygouri-Tolia The Gymnasium of the Academy and the School of Plato
CN202007568U (en) Cemetery building
CN205382752U (en) Environmental protection reduces funeral and interment building of land used
CN211647550U (en) A building for grave
Verstegen Byzantine Jerusalem
CN203175141U (en) Stereoscopic garden cemetery
CN201835583U (en) Land-saving type ecological cemetery
CN206360458U (en) A kind of giant Buddha formula cemetery
Bashendi Cemeteries in Dakhleh
CN201714134U (en) Family cemetery graveyard
Hatherley Everybody Knows This is Nowhere: The K iev P ark of M emory and Post‐S oviet Urbanism in Context
Dong et al. The public space design based on the living needs of the elderly
CN206267620U (en) Three-dimensional cemetery
CN103147619A (en) Underground arrayed earth tomb group
CN106760905A (en) Environmental protection reduces the funeral building of land used
Welsby Kawa
Schiaffonati et al. Progettare l'abitare. L'architettura del Collegio di Milano/Designing Dwelling. The architecture of the Collegio di Milano
CN204552253U9 (en) Grave tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20160617

CF01 Termination of patent right due to non-payment of annual fee