CN202007568U - Cemetery building - Google Patents
Cemetery building Download PDFInfo
- Publication number
- CN202007568U CN202007568U CN2011200675085U CN201120067508U CN202007568U CN 202007568 U CN202007568 U CN 202007568U CN 2011200675085 U CN2011200675085 U CN 2011200675085U CN 201120067508 U CN201120067508 U CN 201120067508U CN 202007568 U CN202007568 U CN 202007568U
- Authority
- CN
- China
- Prior art keywords
- tomb
- building
- cemetery
- row
- door
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a cemetery building and belongs to a structure of a funeral place. The cemetery building is at least provided with two stories, wherein each storey of the cemetery building comprises a door and rows of tombs arranged on the storey, each tomb comprises an altar, a grave and a tombstone, which are connected in sequence, and a sealing cover is arranged at the top end of the grave. The cemetery building has the advantages of small occupied area and high density and saves a lot of land; and as the average occupied area of each tomb is small, the price of the tomb is low and easily accepted by people.
Description
Technical field
The utility model belongs to the structure in a kind of funeral and interment place, particularly relates to building, a kind of cemetery.
Background technology
Tomb is a kind of mode that people deposit cinerary casket, existing tomb just on the ground tiling build one deck, and arrange and irregular, taken a large amount of soils, and along with the continuous increase of tomb, land occupation is being on the increase also; Along with land price rises, the price of tomb is also rising steadily, and the tomb of one 1.5 square meter just needs several ten thousand yuan of costs, brings no small burden for the deceased relatives.
The utility model content
The technical problems to be solved in the utility model provides building, a kind of cemetery, and its floor space is little, and tomb is cheap.
The technical scheme that its technical problem that solves the utility model adopts is: building, a kind of cemetery, building, described cemetery is at least two-layer, arbitrary floor in building, cemetery comprises door and is arranged on the interior tomb in a row of floor, tomb is formed by holding a memorial ceremony for platform, coffin pit and gravestone, holding a memorial ceremony for platform, coffin pit and gravestone is connected successively, and the top, coffin pit is provided with seal cover.
Preferably, door is connected with passage, is provided with the tomb in a row perpendicular to passage in the passage both sides, is provided with the path between the tomb row, path and channel vertical, with door apart farthest one to arrange tomb be the platoon tomb.
More preferably, be provided with dividing plate between the tomb.
The utility model is provided with the multilayer tomb on the ground, and under the identical situation of the quantity of building tomb, the tomb floor space that the utility model is built one deck with respect to only tiling on ground is little, and collection density height has been saved a large amount of soils; Because the average floor space of each tomb is little, so tomb is cheap, holds easily accepted by people.
Description of drawings
The structural representation in building, Fig. 1 cemetery;
Fig. 2 is the putting position figure of tomb in the arbitrary floor in building, cemetery;
Fig. 3 is the lateral view of tomb.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, the utility model embodiment is described in further detail below in conjunction with accompanying drawing.
Referring to Fig. 1, a kind of two-layer at least building 1 is arranged identical in the every floor from the bottom to the top layer, referring to Fig. 2, storey setting has door 2, is provided with path 10 over against door 2, be provided with tomb in a row 3 perpendicular to passage in the path 10 both sides, be covered with whole floor, with door at a distance of farthest one row tomb 3 be the platoon tomb, be provided with dividing plate 4 between two adjacent tombs 3, make people have one independently to hold a memorial ceremony for and visit the space, between two row's tombs path 7 is arranged, be convenient for people to pass through, path 7 is vertical with path 10.Referring to Fig. 3, tomb is formed by holding a memorial ceremony for platform 5, coffin pit 6 and gravestone 8, holds a memorial ceremony for platform 5, coffin pit 6 and gravestone 8 to be connected successively, and gravestone 8 usefulness marbles are made, and places on the ground, and the upright stone tablet face is carved with an inscription on a tablet on the upright stone tablet face towards the coffin pit 6; Coffin pit 6 is arranged on the place ahead of gravestone 8, builds on the ground with brick and cement, forms the cuboid of hollow, and cinerary casket is placed on 6 li in coffin pit, and the top, coffin pit is provided with seal cover 9, guarantees drying, the health of cinerary casket; The platform 5 of holding a memorial ceremony for is arranged on the place ahead in coffin pit 6 and is close to the coffin pit, and is high 0.3 meter, is convenient for people to hold a memorial ceremony for visit relatives.
Floor gap is provided with stair, enters each floor smoothly for people, and every floor is equipped with lighting device and window.
The above only is preferred embodiment of the present utility model, and is in order to restriction the utility model, not all within spirit of the present utility model and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.
Claims (3)
1. building, a cemetery, it is characterized in that: building, described cemetery is at least two-layer, and arbitrary floor in building, described cemetery comprises door and be arranged on a tomb in a row in the floor, and described tomb is formed by holding a memorial ceremony for platform, coffin pit and gravestone, holding a memorial ceremony for platform, coffin pit and gravestone is connected successively, and top, described coffin pit is provided with seal cover.
2. building, cemetery according to claim 1, it is characterized in that: described door is connected with passage, is provided with the tomb in a row perpendicular to passage in the passage both sides, is provided with the path between the described tomb row, described path and channel vertical, with door at a distance of farthest one row tomb be the platoon tomb.
3. building, cemetery according to claim 1 is characterized in that: be provided with dividing plate between the described tomb.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200675085U CN202007568U (en) | 2011-03-15 | 2011-03-15 | Cemetery building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200675085U CN202007568U (en) | 2011-03-15 | 2011-03-15 | Cemetery building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202007568U true CN202007568U (en) | 2011-10-12 |
Family
ID=44749225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200675085U Expired - Fee Related CN202007568U (en) | 2011-03-15 | 2011-03-15 | Cemetery building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202007568U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661078A (en) * | 2012-05-22 | 2012-09-12 | 方祖亮 | Cemetery building |
CN103031980A (en) * | 2013-01-11 | 2013-04-10 | 黄桂芳 | Plate-assembled tombstone and manufacturing process thereof as well as multilayer cemetery tombstone building |
-
2011
- 2011-03-15 CN CN2011200675085U patent/CN202007568U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661078A (en) * | 2012-05-22 | 2012-09-12 | 方祖亮 | Cemetery building |
CN102661078B (en) * | 2012-05-22 | 2014-08-20 | 方祖亮 | Cemetery building |
CN103031980A (en) * | 2013-01-11 | 2013-04-10 | 黄桂芳 | Plate-assembled tombstone and manufacturing process thereof as well as multilayer cemetery tombstone building |
CN103031980B (en) * | 2013-01-11 | 2015-01-21 | 黄桂芳 | Plate-assembled tombstone and manufacturing process thereof as well as multilayer cemetery tombstone building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790712B (en) | A kind of underground stereo cemetery | |
US3978627A (en) | Burial facility | |
CN202007568U (en) | Cemetery building | |
Nash | Pomp and circumstance: archaeology, modernity and the corporatisation of death: early social and political Victorian attitudes towards burial practice | |
CN204728803U (en) | The three-dimensional cemetery of a kind of underground apartment-type | |
JP3184381U (en) | Tumulus-type cemetery and underground cemetery | |
CN205422126U (en) | Over -and -under type grave system | |
CN203846845U (en) | Three-dimensional tomb chamber | |
CN211007891U (en) | Double-deck tower desk formula tomb bedroom | |
CN202645115U (en) | Building, tower and tombstone universal cemetery | |
CN2787771Y (en) | Three-dimensional combined cemetery | |
CN202578118U (en) | Public sacrifice cemetery building | |
CN201786073U (en) | Fire-prevention land-saving cemetery | |
CN112459600A (en) | Double-deck tower desk formula tomb bedroom | |
CN102661078B (en) | Cemetery building | |
RU77318U1 (en) | FAMILY CEMETERY | |
CN105756403B (en) | The method and grave system in lift grave | |
CN205189495U (en) | Horizontal migration formula grave system | |
CN101781944A (en) | Method for increasing grave capacity of cemetery and grave structure | |
CN214091281U (en) | Novel grave with slope protection and soil fixation functions | |
CN107269104B (en) | Cinerary casket cemetery placed in mountain | |
CN211647550U (en) | A building for grave | |
CN219387430U (en) | Green ecological underground public cemetery | |
CN202611315U (en) | Cemetery building | |
CN118049089A (en) | Tomb hole building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111012 Termination date: 20120315 |