CN203334698U - Locating device of connector of prefabricated assembling column and rebar sleeve - Google Patents

Locating device of connector of prefabricated assembling column and rebar sleeve Download PDF

Info

Publication number
CN203334698U
CN203334698U CN2013203424069U CN201320342406U CN203334698U CN 203334698 U CN203334698 U CN 203334698U CN 2013203424069 U CN2013203424069 U CN 2013203424069U CN 201320342406 U CN201320342406 U CN 201320342406U CN 203334698 U CN203334698 U CN 203334698U
Authority
CN
China
Prior art keywords
rebar
sleeve
locating
prefabricated
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203424069U
Other languages
Chinese (zh)
Inventor
吴敦军
李宁
汪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yangtze River Urban Architectural Design Co Ltd
Original Assignee
Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yangtze River Urban Architectural Design Co Ltd filed Critical Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority to CN2013203424069U priority Critical patent/CN203334698U/en
Application granted granted Critical
Publication of CN203334698U publication Critical patent/CN203334698U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a locating device of a connector of a prefabricated assembling column and a rebar sleeve and belongs to the field of building industrialization and prefabricated assembling technology. The locating device comprises a locating rebar and a prefabricated column. The locating rebar is inserted into the prefabricated column. The locating device further comprises the rebar sleeve and a locating sleeve. The locating sleeve is arranged at the bottom end of the locating rebar. The rebar sleeve is fixed at the bottom end of a connecting rebar. The locating device of the connector of the prefabricated assembling column and the rebar sleeve solves the problem that mistakes can happen easily at connecting positions of on-site spliced prefabricated columns when square or rectangular columns are symmetric in shape, and rebars are bit symmetric. After the locating rebar and the locating sleeve are arranged, prefabricated columns are hung into positions on site quickly and accurately, construction quality is guaranteed, and construction difficulty is reduced.

Description

A kind of positioner of prefabrication and assembly construction post reinforced bar sleeve connector
Technical field
The utility model relates to a kind of positioner of prefabrication and assembly construction post reinforced bar sleeve connector, belongs to industrialization of construction industry and prefabrication and assembly construction technical field.
Background technology
In the prefabrication and assembly construction frame construction, prefabricated post mostly is square or rectangle.Due to stressed difference, the reinforcing bar of pillar is often different at X and Y-direction.
Due to the connection employing sleeve connection of prefabrication and assembly construction frame column reinforcing bar, reinforcing bar is cast in pillar, and the arrangement of reinforcement situation is difficult for observing.Construct at the scene when assembled, due to the reasons such as technical factor of field worker, frame column reinforcing bar X-direction may occur and dock the wrong situation in location with Y-direction.If will correctly judge the docking orientation of prefabricated frame trestle, the one, requirement site operation personnel technical quality improves, the 2nd, spend longer time contrast drawing and be judged, and this period be the working time that takies crane, thereby can affect the service efficiency of construction machinery.
The utility model content
The utility model provides a kind of positioner of prefabrication and assembly construction post reinforced bar sleeve connector for above-mentioned deficiency.
The utility model adopts following technical scheme:
The positioner of a kind of prefabrication and assembly construction post reinforced bar sleeve connector described in the utility model, comprise spacer bars, prefabricated post, and spacer bars inserts in prefabricated post; Also comprise abutment sleeve, horn mouth; Described horn mouth is arranged in the bottom of abutment sleeve, abutment sleeve be arranged in spacer bars and bell-mouthed between.
The positioner of prefabrication and assembly construction post reinforced bar sleeve connector described in the utility model, horn mouth is arranged in the bottom of described prefabricated post.
Beneficial effect
The positioner of a kind of prefabrication and assembly construction post reinforced bar sleeve connector that the utility model provides, solved square, rectangular column, profile symmetry, and when reinforcing bar is asymmetric, on-site consolidation prefabricated post connection orientation easily makes a mistake.After spacer bars and abutment sleeve are set, make site prefabrication post hoisted in position, fast, accurately, guarantee construction quality, reduce difficulty of construction.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of A-A in Fig. 1;
Fig. 3 is bottom surface structure schematic diagram of the present utility model;
In figure, 1 is spacer bars, the 2nd, and preformed pile, the 3rd, abutment sleeve, the 4th, horn mouth.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described:
As shown in the figure: a kind of positioner of prefabrication and assembly construction post reinforced bar sleeve connector comprises spacer bars 1, preformed pile 2, abutment sleeve 3, horn mouth 4.
Spacer bars 1 inserts in preformed pile 2; Described horn mouth 4 is arranged in the bottom of spacer bars 1, and abutment sleeve 3 is arranged in the bottom of spacer bars 1 and horn mouth 4.Horn mouth is arranged in the bottom of prefabricated post.
The be located by connecting sleeve different from other branch sleeves in the embedded sleeve barrel end setting of prefabricated frame trestle, arrange at the reserved steel bar end of prefabricated frame trestle the spacer bars that length is different from other connecting reinforcement length.During the assembled docking of on-the-spot post, abutment sleeve is aimed at spacer bars, completes rapidly, exactly reinforcing bar and is connected location with sleeve.
Fully-prefabricated assembled high residential building, 15 layers on the ground, underground one deck indoor bicycle parking area that arranges, one deck is built on stilts leisure space, 45 meters of building heights, building area is 10,000 square meters approximately.It is the full prefabrication and assembly construction high residential building in first of Jiangsu Province.Structural system adopts fully-prefabricated assembled framework-steel support structure system, main body frame except basement and bottom overhead layer post adopt cast-in-place, all the other structure divisions all adopt the fabricated assembly overall technology, prefabricating technique is as follows in the range of application of this engineering:
1) the main structure body vertical member adopts the precast concrete frame column, and horizontal flooring member adopts precast concrete superposed beam and precast prestressed concrete superimposed sheet, and anti-lateral elements adopts framework-steel to support.
2) the typical floor stair adopt the precast concrete gangboard, and balcony adopts the precast concrete laminated floor slab;
3) inside and outside infilled wall adopts the autoclaved lightweight concrete board material.

Claims (2)

1. the positioner of a prefabrication and assembly construction post reinforced bar sleeve connector, comprise spacer bars (1), prefabricated post (2), and spacer bars (1) inserts in prefabricated post (2); It is characterized in that: also comprise abutment sleeve (3), horn mouth (4); Described horn mouth (4) is arranged in the bottom of abutment sleeve (3), abutment sleeve (3) be arranged in spacer bars (1) and horn mouth (4) between.
2. the positioner of prefabrication and assembly construction post reinforced bar sleeve connector according to claim 1, is characterized in that: the bottom layout horn mouth (4) of described prefabricated post (2).
CN2013203424069U 2013-06-17 2013-06-17 Locating device of connector of prefabricated assembling column and rebar sleeve Expired - Lifetime CN203334698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203424069U CN203334698U (en) 2013-06-17 2013-06-17 Locating device of connector of prefabricated assembling column and rebar sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203424069U CN203334698U (en) 2013-06-17 2013-06-17 Locating device of connector of prefabricated assembling column and rebar sleeve

Publications (1)

Publication Number Publication Date
CN203334698U true CN203334698U (en) 2013-12-11

Family

ID=49703378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203424069U Expired - Lifetime CN203334698U (en) 2013-06-17 2013-06-17 Locating device of connector of prefabricated assembling column and rebar sleeve

Country Status (1)

Country Link
CN (1) CN203334698U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133754A (en) * 2015-08-03 2015-12-09 中国十七冶集团有限公司 Prefabricated concrete shear wallboard counterbore guide type mounting device and method
CN105926771A (en) * 2016-06-17 2016-09-07 中国十七冶集团有限公司 Middle joint connecting structure of assembled integral frame column-beam and construction method of middle joint connecting structure
CN105951984A (en) * 2016-05-24 2016-09-21 东南大学 High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN106013432A (en) * 2016-05-24 2016-10-12 东南大学 Joint connecting structure in high-ductility assembled integrated frame and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133754A (en) * 2015-08-03 2015-12-09 中国十七冶集团有限公司 Prefabricated concrete shear wallboard counterbore guide type mounting device and method
CN105951984A (en) * 2016-05-24 2016-09-21 东南大学 High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN106013432A (en) * 2016-05-24 2016-10-12 东南大学 Joint connecting structure in high-ductility assembled integrated frame and construction method
CN106013432B (en) * 2016-05-24 2019-05-17 东南大学 A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN105926771A (en) * 2016-06-17 2016-09-07 中国十七冶集团有限公司 Middle joint connecting structure of assembled integral frame column-beam and construction method of middle joint connecting structure

Similar Documents

Publication Publication Date Title
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN101565969B (en) Indirect assembly concrete-filled steel tube combined special-shaped column and production method thereof
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN2685429Y (en) Precasted deformed column for integral prestress assembling plate-column structure
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN201809864U (en) Anti-seismic superimposed slab shear wall with T-shaped connecting member
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN102261189A (en) Assembly-cast-in-situ type close column structure used in residential building with shear wall system
CN103334497A (en) Connection method of scope system frame column steel bar
CN203334698U (en) Locating device of connector of prefabricated assembling column and rebar sleeve
CN103924710A (en) Steel plate welding node structure of low-layer assembly type composite wall house
CN101565968A (en) Direct assembly concrete-filled steel tube combined special-shaped column and production method thereof
CN105275089A (en) Fully-prefabricated cold-formed steel house modular unit and assembly connection method
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN105507470A (en) Periphery-overlapped integral fabricated floor and construction method thereof
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN201391093Y (en) Reinforcing device used for brick and concrete-structured prestressing seismic resistant system with constructional column and ring beam
KR20140109587A (en) Precast Pier and Construction Method
CN202202412U (en) Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN103938730A (en) Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN204645343U (en) Prefabricated assembled concrete out-hung panel fastening devices
CN204530982U (en) A kind of prefabricated assembled special-shaped wallette limb industrialization Housing Structure System

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131211

CX01 Expiry of patent term