CN203321495U - Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing - Google Patents
Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing Download PDFInfo
- Publication number
- CN203321495U CN203321495U CN2013202870344U CN201320287034U CN203321495U CN 203321495 U CN203321495 U CN 203321495U CN 2013202870344 U CN2013202870344 U CN 2013202870344U CN 201320287034 U CN201320287034 U CN 201320287034U CN 203321495 U CN203321495 U CN 203321495U
- Authority
- CN
- China
- Prior art keywords
- wirerope
- glass
- coiled tubing
- differential
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012360 testing method Methods 0.000 title abstract description 17
- 239000011521 glass Substances 0.000 claims abstract description 53
- 230000005540 biological transmission Effects 0.000 claims abstract description 38
- 230000001681 protective effect Effects 0.000 claims abstract description 11
- 238000009414 blockwork Methods 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 abstract description 9
- 239000010959 steel Substances 0.000 abstract description 9
- 230000000712 assembly Effects 0.000 abstract 3
- 238000000429 assembly Methods 0.000 abstract 3
- 238000009417 prefabrication Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 6
- 230000033001 locomotion Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009960 carding Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000012345 traction test Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses a quick prefabricated test instrument's of overlength minor diameter coiled tubing device belongs to the oil field. The device comprises a glass steel cable, a base, two protective frames, two supports and two transmission assemblies, wherein the glass steel cable and the base are independently arranged, the side parts of the base are respectively provided with one protective frame, the glass steel cable is supported by the protective frames when the device works, the two supports are arranged between the two protective frames, the supports are connected with the base, the two transmission assemblies are symmetrically arranged on the supports, and the glass steel cable is driven to advance or retreat by the two transmission assemblies when the device works. The utility model discloses an above-mentioned mode removes the region restriction, does not have the deep well also can do the coiled tubing prefabrication on ground, and gets rid of the expense of steel wire tractor, has reduced the expense, the utility model discloses need 2 hours prefabricated time, can prefabricate 4-5 wells a day, improved efficiency.
Description
Technical field
The utility model relates to the oil field construction field, particularly the device of the quick prefabricated tester of a kind of overlength minor diameter coiled tubing.
Background technology
A kind of mode of downhole testing is to be lowered to pit shaft with the overlength minor diameter coiled tubing long test cable of protection or instrument to carry out various test jobs.
At first the method for common prefabricated tester comprises the steps:, looks for a bite deep space well, with Operation Tubing Aggregate, diameter 32mm coiled tubing is dropped in the deep space well, hangs weight with steel wire and drops into coiled tubing, utilizes gravity to make weight be lowered to bottom; Then propose coiled tubing, coiled tubing is spread out on ground, enter coiled tubing with the steel wire traction test cable in coiled tubing, so far prefabricated completing.
Due to regional limits, the deep space well is not easy to look for, and Operation Tubing Aggregate mounting arrangements at the scene is comparatively complicated, prefabricated operation one well that needs, need the prefabricated time of 1 day, one day maximum prefabricated 1-2 mouth well, consuming time longer, scene need to have a carding engine to carry out coordinating operation in addition, and expense is higher.
The utility model content
The consuming time long and higher problem of expense that is subject to regional limits and exists in order to solve prior art, the utility model embodiment provides the device of the quick prefabricated tester of a kind of overlength minor diameter coiled tubing.Described technical scheme is as follows:
On the one hand, the device of the quick prefabricated tester of a kind of overlength minor diameter coiled tubing is provided, described device comprises the glass wirerope, base, fender bracket, support and transmission component, described glass wirerope and described base arrange separately, the sidepiece of described base respectively arranges a described fender bracket, described fender bracket supports described glass wirerope, described is set up between two described fender brackets, and described support is connected with described base, described transmission component is that two covers and symmetry are arranged on described support, the described transmission component of two covers drives described glass wirerope and advances or retreat.
Particularly, described transmission component comprises motor, power transmission shaft, crawler belt and grip block, and described motor is fixed on described support, and described motor is connected with described power transmission shaft, described crawler belt is coated on described power transmission shaft outside, and described grip block is fixed on the work plane of described crawler belt.
Particularly, described grip block integral body is cuboid, and described grip block work plane is provided with the differential of the arc, and the described differential of the arc is held described glass wirerope.
Particularly, described differential of the arc radian is 40 degree-60 degree.
Described differential of the arc radian is 45 degree.
Described differential of the arc radian is 50 degree.
Further, the described differential of the arc is provided with ball, and described ball compresses described glass wirerope.
Further, described device also comprises the adjustment assembly.
Particularly, described adjustment assembly comprises leading screw, screw, leading screw rocking bar and slide link, and described screw is located at described support, and described leading screw passes described support by described screw, described leading screw rocking bar is arranged on described leading screw one end, and described slide link is through described support.
Further, described device also comprises protective cover, and described protective cover covers on described transmission component outside.
On the other hand, also provide a kind of method that is applied to described device, described method is operated in accordance with the following steps,
Step 100, logical described device forward pushes described glass wirerope and enters and stretch out coiled tubing,
Step 200, stretch out the glass wirerope connecting test cable of coiled tubing, by described device, reverses and reclaim described glass wirerope, pulls described test cable and enter described coiled tubing.
Further, described method also comprises set-up procedure, and described set-up procedure, before described step 100, by adjusting two distances between described transmission component, clamps described glass wirerope.
The beneficial effect that the technical scheme that the utility model embodiment provides is brought is:
What the utility model utilized the glass wirerope radially conducts stressed characteristic, use transmission component that the glass wirerope is pushed to the coiled tubing inside more than 700 meters, regain the glass wirerope, the pull test cable enters coiled tubing simultaneously again, and so far prefabricated tester completes.The utility model is removed regional limits by the way, not have deep-well also can do coiled tubing on ground prefabricated, and removes the expense of steel wire traction car, reduced expense, the utility model needs the prefabricated time of 2 hours, one day can prefabricated 4-5 mouth well, improved efficiency.
The accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, in below describing embodiment, the accompanying drawing of required use is briefly described, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the front view that the utility model embodiment provides the device of the quick prefabricated tester of overlength minor diameter coiled tubing;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is the front view of the grip block that provides of the utility model embodiment;
Fig. 4 is the lateral view of Fig. 3;
Fig. 5 is the rear elevation of Fig. 3;
Fig. 6 is the front view of the glass wirerope that provides of the utility model embodiment;
Fig. 7 is the state diagram of the grip block extruding glass wirerope that provides of the utility model embodiment;
Fig. 8 is the state diagram of the grip block clamping glass wirerope that provides of the utility model embodiment;
Fig. 9 is the state diagram that grip block that the utility model embodiment provides transports the glass wirerope;
Figure 10 is the state diagram that the adjustment assembly that provides of the utility model embodiment is adjusted the distance between two cover transmission components;
Figure 11 is that the glass wirerope that the utility model embodiment provides pushes the schematic diagram into coiled tubing;
Figure 12 is that the glass wirerope that passes through that the utility model embodiment provides pulls the schematic diagram that test cable advances coiled tubing.
In figure, each symbol means that implication is as follows:
10 bases,
20 fender brackets,
30 supports,
40 transmission components, 41 motors, 42 power transmission shafts, 43 crawler belts, 44 grip blocks, the 44A differential of the arc, the 44B ball,
50 adjust assembly, 51 leading screws, and 52 screws, 53 leading screw rocking bars, 54 slide links,
60 glass wireropes,
70 test cables,
80 protective covers,
90 coiled tubings.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing, the utility model embodiment is described in further detail.
Embodiment mono-
As shown in Fig. 1-12, the utility model provides the device of the quick prefabricated tester of a kind of overlength minor diameter coiled tubing, the utility model be take Fig. 1 and is illustrated as main, described device comprises glass wirerope 60, base 10, fender bracket 20, support 30 and transmission component 40, described glass wirerope 60 and described base 10 arrange separately, the sidepiece of described base 10 respectively arranges a described fender bracket 20, during described device work, support described glass wirerope 60 by described fender bracket 20, described support 30 is located between two described fender brackets 20, and described support 30 is connected with described base 10, described transmission component 40 is that two covers and symmetry are arranged on described support 30, during described device work, driving described glass wirerope 60 by the described transmission component 40 of two covers advances or retreats.
As shown in Figure 1, operating principle of the present utility model: use radially chucking power squeezing glass wirerope 60, produce crosswise pushing power.As shown in figure 11, forward pushes: use motor 41 to press close to coiled tubing 90, forward carries glass wirerope 60 to enter 700 meters long coiled tubings 90 by the propelling movement power of crawler belt 43.As shown in figure 12, reverse pulls prefabricated: the motive force reversed with motor 41 reclaims glass fiber reinforced plastic cable 60, pulls test cable 70 and enters long coiled tubing 90.
As shown in Figure 1, what the utility model utilized glass wirerope 60 radially conducts stressed characteristic, use transmission component 40 that glass wirerope 60 is pushed to coiled tubing 90 inside into overlength, regain again glass wirerope 60, pull test cable 70 enters coiled tubing 90 simultaneously, and so far prefabricated tester completes.The utility model is removed regional limits by the way, not have deep-well also can do coiled tubing 90 on ground prefabricated, and removes the expense of steel wire traction car, reduced expense, the utility model needs the prefabricated time of 2 hours, one day can prefabricated 4-5 mouth well, improved efficiency.
Particularly, as shown in Figure 2, described transmission component 40 comprises motor 41, power transmission shaft 42, crawler belt 43(is referring to Figure 11 and Figure 12) and grip block 44, described motor 41 is fixed on described support 30, described motor 41 is connected with described power transmission shaft 42, described crawler belt 43(is referring to Figure 11 and Figure 12) be coated on described power transmission shaft 42 outsides, described grip block 44 is fixed on the work plane of described crawler belt 43, during described device work, driving described power transmission shaft 42 by described motor 41 rotates, and then drive described crawler belt 43(referring to Figure 11 and Figure 12) motion, by the described glass wirerope 60 of described grip block 44 clamping, make described glass wirerope 60 advance or retreat.
Particularly, as in Figure 3-5, the present embodiment be take Fig. 3 and is illustrated as main, and described grip block 44 integral body are cuboid, and described grip block 44 work planes are provided with differential of the arc 44A(referring to Fig. 4), hold described glass wirerope 60 by described differential of the arc 44A.More specifically, grip block 44 adopts rubber to make, use completes the conduction of horizontal force between glass wirerope 60 and transmission component 40 with 44 of the rubber reinforcement grip blocks of differential of the arc 44A shape, overcome friction pushes and pulls the technology that tester enters coiled tubing 90 into the minor diameter coiled tubing is after 90s.
Particularly, referring to Fig. 4, described differential of the arc 44A radian is 40 degree-60 degree.
Described differential of the arc radian is 45 degree.
Described differential of the arc radian is 50 degree.
Further, referring to Fig. 7 and Fig. 8, described differential of the arc 44A is provided with ball 44B, during described device work, by described ball 44B, compresses described glass wirerope 60.
Further, referring to Figure 10, described device also comprises adjusts assembly 50, by described adjustment assembly 50, adjusts the distance between the described transmission component 40 of two covers.
Particularly, referring to Fig. 2, described adjustment assembly 50 comprises leading screw 51, screw 52, leading screw rocking bar 53 and slide link 54, described screw 52 is located at described support 30, described leading screw 51 passes described support 30 by described screw 52, described leading screw rocking bar 53 is arranged on described leading screw 51 1 ends, described slide link 54 is through described support 30, during described adjustment assembly 50 work, by shaking described leading screw rocking bar 53, drive described leading screw 51 and described screw 52 engagements, under the guiding of described slide link 54, adjust the distance between two described transmission components 40, make grip block 44 closely to be attached to around glass wirerope 60.
Further, as shown in Figures 1 and 2, described device also comprises protective cover 80, and described protective cover 80 covers on described transmission component 40 outsides.
Embodiment bis-
On the other hand, the present embodiment also provides a kind of method that is applied to described device, and described method is operated in accordance with the following steps,
Step 100, after ground tiling launches, used empty coiled tubing 90 the 1-2 table apparatus push glass wirerope 60 and pass through coiled tubing 90, and logical described device forward pushes described glass wirerope 60 and enters and stretch out coiled tubing 90;
Step 200, stretch out the glass wirerope 60 connecting test cables 70 of coiled tubing 90, by described device, reverses and reclaim described glass wirerope 60, pulls described test cable 70 and enter described coiled tubing 90, and so far prefabricated tester completes.
Further, described method also comprises set-up procedure, and described set-up procedure, before described step 100, by adjusting two distances between described transmission component 40, clamps described glass wirerope 60.
More specifically, described equipment is selected 500 kilograms of propelling movement power or above, in 10 m/mins of speed, and 1 or two of quantity, glass wirerope 60 adopts diameter 16mm or above models, coiled tubing 90 internal diameter 26mm, 700 meters of length.
The utility model is used in 32 wellblocks, XX oil field, Xinjiang, has successfully passed through the coiled tubing 90 of 700 meters, and at present, the coiled tubing 90 of preparing to use 2 thicker glass wireropes 60 of conveying device series connection to pass through 1000 meters carries out next step experiment.
The utility model can be widely used in the work of the interior prefabricated test cable 70 of long pipeline with the instrument of oilfield test, solution because of regional limits can't prefabricated test cable 70 problem, the material that later can also optimize glass wirerope 60 carries out the prefabricated of other kinds or work, and aspect pipe conveying equipment, application prospect is comparatively wide.
Above-mentioned the utility model embodiment sequence number, just to describing, does not represent the quality of embodiment.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (10)
1. the device of the quick prefabricated tester of overlength minor diameter coiled tubing, it is characterized in that, described device comprises the glass wirerope, base, fender bracket, support and transmission component, described glass wirerope and described base arrange separately, the sidepiece of described base respectively arranges a described fender bracket, described fender bracket supports described glass wirerope, described is set up between two described fender brackets, and described support is connected with described base, described transmission component is that two covers and symmetry are arranged on described support, the described transmission component of two covers drives described glass wirerope and advances or retreat.
2. device according to claim 1, it is characterized in that, described transmission component comprises motor, power transmission shaft, crawler belt and grip block, described motor is fixed on described support, described motor is connected with described power transmission shaft, described crawler belt is coated on described power transmission shaft outside, and described grip block is fixed on the work plane of described crawler belt.
3. device according to claim 2, is characterized in that, described grip block integral body is cuboid, and described grip block work plane is provided with the differential of the arc, and the described differential of the arc is held described glass wirerope.
4. device according to claim 3, is characterized in that, described differential of the arc radian is 40 degree-60 degree.
5. device according to claim 4, is characterized in that, described differential of the arc radian is 45 degree.
6. device according to claim 4, is characterized in that, described differential of the arc radian is 50 degree.
7. device according to claim 4, is characterized in that, the described differential of the arc is provided with ball, and described ball compresses described glass wirerope.
8. device according to claim 1, is characterized in that, described device also comprises the adjustment assembly.
9. device according to claim 8, it is characterized in that, described adjustment assembly comprises leading screw, screw, leading screw rocking bar and slide link, described screw is located at described support, described leading screw passes described support by described screw, described leading screw rocking bar is arranged on described leading screw one end, and described slide link is through described support.
10. according to the described device of claim 1-9 any one claim, it is characterized in that, described device also comprises protective cover, and described protective cover covers on described transmission component outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202870344U CN203321495U (en) | 2013-05-23 | 2013-05-23 | Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202870344U CN203321495U (en) | 2013-05-23 | 2013-05-23 | Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203321495U true CN203321495U (en) | 2013-12-04 |
Family
ID=49660858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202870344U Expired - Lifetime CN203321495U (en) | 2013-05-23 | 2013-05-23 | Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203321495U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103790535A (en) * | 2013-05-23 | 2014-05-14 | 中国石油天然气股份有限公司 | Device and method for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
CN109025957A (en) * | 2018-05-31 | 2018-12-18 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Device and method for detecting push-pull force and torque of horizontal segment of coiled tubing for experiment |
-
2013
- 2013-05-23 CN CN2013202870344U patent/CN203321495U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103790535A (en) * | 2013-05-23 | 2014-05-14 | 中国石油天然气股份有限公司 | Device and method for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
CN103790535B (en) * | 2013-05-23 | 2016-07-06 | 中国石油天然气股份有限公司 | Device and method for quickly prefabricating test instrument for super-long small-diameter coiled tubing |
CN109025957A (en) * | 2018-05-31 | 2018-12-18 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Device and method for detecting push-pull force and torque of horizontal segment of coiled tubing for experiment |
CN109025957B (en) * | 2018-05-31 | 2022-05-13 | 中国石油天然气集团有限公司 | Device and method for detecting push-pull force and torque of horizontal section of coiled tubing for experiment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109332964B (en) | Ring welding machine | |
CN203321495U (en) | Device for quickly prefabricating test instrument for super-long small-diameter coiled tubing | |
CN103196005A (en) | Pipe exploration robot based on real-time image transmission system | |
CN205146809U (en) | From walking submarine pipe line belt cleaning device | |
CN203162435U (en) | Pipeline exploration robot based on real-time image transmission system | |
CN202913986U (en) | Coiled tubing injection head | |
CN207669779U (en) | A kind of overlength hose depoling device | |
CN205100911U (en) | Coiled tubing's first device of injection | |
CN103790535A (en) | Device and method for quickly prefabricating test instrument for super-long small-diameter coiled tubing | |
CN202163839U (en) | Conveying device of tubular pile cloth | |
CN116929640A (en) | Device for maintaining and detecting equipment used for underground cable pipeline of road | |
CN202572086U (en) | Double-drum type drill rod dedusting equipment | |
CN205086334U (en) | Tubular product draw gear | |
CN111786311B (en) | Cable draw gear for electric power construction | |
CN211766150U (en) | Drift raft booster unit | |
CN207609228U (en) | Vehicle-carrying plate transverse-moving mechanism based on vertically displaceable parking apparatus | |
CN206590671U (en) | A kind of optical fiber reel actinobacillus device | |
CN105252740A (en) | Pipe traction device | |
CN205739803U (en) | A kind of wheel drives wire rewinding and paying off machine | |
CN219576473U (en) | Novel wire threading device in weak current construction | |
CN204914566U (en) | Automatic jacketing machine of garden water pipe | |
CN219197294U (en) | Swing balancing device of beam pumping unit | |
CN202531121U (en) | Non-beam pumping unit | |
CN220857460U (en) | Cable laying machine | |
CN117914047B (en) | Permanent magnet direct-drive high-power electric roller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20131204 Effective date of abandoning: 20160706 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |