CN203301058U - Cross-pulley device for erected wire - Google Patents

Cross-pulley device for erected wire Download PDF

Info

Publication number
CN203301058U
CN203301058U CN2013202732109U CN201320273210U CN203301058U CN 203301058 U CN203301058 U CN 203301058U CN 2013202732109 U CN2013202732109 U CN 2013202732109U CN 201320273210 U CN201320273210 U CN 201320273210U CN 203301058 U CN203301058 U CN 203301058U
Authority
CN
China
Prior art keywords
cross
wire
electric wiring
pulley
insulating bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202732109U
Other languages
Chinese (zh)
Inventor
郝大伟
王清泉
张志勇
张建辉
张洪源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuji county power supply bureau
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
Wuji county power supply bureau
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuji county power supply bureau, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd filed Critical Wuji county power supply bureau
Priority to CN2013202732109U priority Critical patent/CN203301058U/en
Application granted granted Critical
Publication of CN203301058U publication Critical patent/CN203301058U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a cross-pulley device for an erected wire, which comprises a convenient-to-hold insulating rod. The top of the insulating rod is fixedly provided with a bracket. The upper part of the bracket is alternately provided with two parallel lateral plates. A pulley is arranged between the two lateral plates and is used for bearing an erected wire. The cross-pulley device for the wire erection is simple in structure and convenient to carry about and use. By means of the cross-pulley device, both the manpower and material resources are saved. Meanwhile, the extension and the traction of the erected wire can be realized without the construction of any extra crossing frame, and the crossing erection of the wire is realized. In addition, the working efficiency is improved and the construction cost is saved.

Description

Install electric wiring and use the cross-line coaster
Technical field
The aid that uses when the utility model relates to a kind of power circuit and sets up, a kind of cross-line coaster specifically.
Background technology
In power line construction stringing process; often can run into the situation that electric wire and electric wire intersect; in construction stringing operation process; the power circuit below many times can run into the situation of crossing over entrance line, telephone wire etc., in the process of installing electric wiring, can destroy the circuit crust or break circuit to cause damage.
The general crossing frame that adopts is isolated the leap electric wire and is crossed over electric wire now, and crossing frame is the frame structure of being made by the aluminium alloy of steel alloy or lighter weight.The transmission line that sets up due to needs need to move between adjacent two steel towers, and in the process that transmission line moves, to be supported and slippage thereon by crossing frame, crossing frame is not only being carried the weight of transmission line, also and between transmission line produce sliding friction simultaneously, so, the larger frictional force wear damage that crossing frame is easily produced by the transmission of electricity electric wire of slippage; Frictional resistance between transmission line and crossing frame also can cause occurring that transmission line moves difficulty simultaneously, causes the phenomenons such as transmission line stagnation, and then affects construction progress, to construction, makes troubles, and causes its long construction period, and cost is high.
The utility model content
The utility model technical issues that need to address are to provide a kind of simple in structure, easy to use installing electric wiring cross-line coaster.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
Install electric wiring and use the cross-line coaster, comprise a convenient insulating bar that grips, the top of described insulating bar is fixedly installed support, and the spaced two blocks of side plates parallel to each other in the top of support, be provided for accepting the pulley that installs electric wiring between biside plate.
Further improvement of the utility model is: the protective layer that is provided for preventing damaged wire in the race of described pulley.
Further improvement of the utility model is: the bottom of described support is fixedly installed one and installs electric wiring and the crotch that is in contact with one another by the leap electric wire be used to preventing.
Further improvement of the utility model is: described insulating bar is expansion link.
Owing to having adopted technique scheme, the technological progress that the utility model is obtained is:
The utility model is simple in structure, carry, easy to use, simple to operate, saved manpower and materials, only the electric wire that will set up need be placed in to the race of pulley, the electric wire that need to set up by the flexible lifting of insulating bar, just can will install electric wiring and cross over existing transmission line, at the another side of being crossed over electric wire, draw, the rotation by pulley reaches the conveying purpose that installs electric wiring, and completes the leap of the electric wire that need to set up.After using the utility model, newly-built crossing frame, just can realize that the leap of electric wire is set up again, improved operating efficiency, saved operating expenses.
In the race of pulley, protective layer is set, the wire outer skin when tracting that prevents from installing electric wiring is damaged.The crotch that arranges at cylinder place, support bottom can hold onto the electric wire of being crossed over temporarily in the utility model use procedure, will install electric wiring and be crossed over electric wire and separate, and prevents that both from causing damaged wire because of contact friction.
The insulating bar that arranges is convenient to be gripped, insulation characterisitic has guaranteed staff's safety simultaneously, insulating bar is arranged to expansion link, operating personnel can regulate according to the height of the transmission line of being crossed over, in operating process, be not subjected to limitation in height, on ground, just can directly cross over setting up of electric wire, the scope of application is wider.
The accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is left view of the present utility model.
Wherein, 1, pulley, 2, support, 21, crotch, 22, back shaft, 3, insulating bar.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further details:
Install electric wiring and use the cross-line coaster, as shown in Figure 1, comprise insulating bar 3, support 2 and pulley 1.Described support 2 tops arrange pulley 1, and the bottom of support 2 is fixedly connected with the top of insulating bar 3.
The top of described support 2 is the U-shaped bifurcation structure, and namely the top of support 2 is arranged at intervals with two blocks of side plates parallel to each other, the bottom of two blocks of side plates by with two blocks of side plates all vertical base plate be connected.Between two blocks of side plates, be fixedly installed a back shaft 22, on back shaft 22, socket arranges pulley 1.Described pulley 1 is be used to accepting the electric wire that need to set up; the electric wire that in operating process, needs is set up is in the race to pulley 1; for the protection electric wire; prevent that the friction in unfolding and distraction procedure of electric wire skin is impaired; in the race of pulley 1, cover rubber layer is set, also can select other elastomeric material as protective layer.The bottom of support 2 is tube-in-tube structure, and the top of described sleeve is connected with the base plate of U-shaped bifurcated, and a crotch 21 is set on the outer wall of sleeve, and as shown in Figure 2, the plane at the plane at the center line place of crotch 21 and the center line place of back shaft 22 is orthogonal.In use, crotch 21 can install electric wiring needs and keep apart with the electric wire of being crossed over, and prevents from suffering damage because between electric wire, being in contact with one another friction.
The sleeve of support 2 bottoms and the top of insulating bar 3 are fixedly sleeved, the convenient gripping of described insulating bar 3, and for improving general applicability of the present utility model, the limitation in height that is not installed electric wiring, insulating bar 3 is arranged to expansion link, also can be pegged graft and be formed by some sections quarter butts.Utilize the safety that the insulation characterisitic of insulating bar 3 can the safeguard work personnel.

Claims (4)

1. install electric wiring and use the cross-line coaster, it is characterized in that: comprise a convenient insulating bar (3) that grips, the top of described insulating bar (3) is fixedly installed support (2), the spaced two blocks of side plates parallel to each other in the top of support (2), be provided for accepting the pulley (1) that installs electric wiring between biside plate.
2. according to claim 1 installing electric wiring used the cross-line coaster, it is characterized in that: the protective layer that is provided for preventing damaged wire in the race of described pulley (1).
3. according to claim 1 installing electric wiring used the cross-line coaster, it is characterized in that: the bottom of described support (2) is fixedly installed one and installs electric wiring and the crotch (21) that is in contact with one another by the leap electric wire be used to preventing.
4. described the installing electric wiring of according to claim 1~3 any one used the cross-line coaster, it is characterized in that: described insulating bar (3) is expansion link.
CN2013202732109U 2013-05-17 2013-05-17 Cross-pulley device for erected wire Expired - Fee Related CN203301058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202732109U CN203301058U (en) 2013-05-17 2013-05-17 Cross-pulley device for erected wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202732109U CN203301058U (en) 2013-05-17 2013-05-17 Cross-pulley device for erected wire

Publications (1)

Publication Number Publication Date
CN203301058U true CN203301058U (en) 2013-11-20

Family

ID=49577041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202732109U Expired - Fee Related CN203301058U (en) 2013-05-17 2013-05-17 Cross-pulley device for erected wire

Country Status (1)

Country Link
CN (1) CN203301058U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106356761A (en) * 2016-09-21 2017-01-25 国网冀北电力有限公司迁西县供电分公司 Intersected span take-up tool for line construction and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106356761A (en) * 2016-09-21 2017-01-25 国网冀北电力有限公司迁西县供电分公司 Intersected span take-up tool for line construction and method

Similar Documents

Publication Publication Date Title
CN203770842U (en) Automatic lifting type wire support
CN103151727A (en) Live line connection fixing clamp used for power maintenance and usage thereof
CN202899731U (en) Tilt adjustment lifting device of electric transmission line iron tower
CN201408948Y (en) Height adjustable lifting-spanning stringing device
CN203301058U (en) Cross-pulley device for erected wire
CN202544476U (en) Tower crane type holding rod
CN205123121U (en) Action bars is strideed across to electric wire
CN104295147B (en) A kind of framework being applicable to transformer station's outlet
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN204089044U (en) Portable overhead conductor shift unit
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202090629U (en) "Inverted-U-shaped" truss structure of main variable ingoing line used for 750 kV transformer station in Riyue Mountain
CN204793864U (en) Stride provisional overhead line facility of small region muddy ground
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN104283155A (en) Portable overhead conductor shifter and method for erecting conductor thereby
CN203301060U (en) Adjustable lift platform on strain insulator string of UHV power transmission line
CN202817683U (en) Movable mining cable connector protective bracket
CN104514919A (en) Bracket of cable bridge
CN204186081U (en) Wallboard riser erecting device
CN204131004U (en) Four loop straight line steel tube tower circle cross-arm jigs
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN102780174B (en) Double-row type pulley sheave
CN202308855U (en) High-altitude disconnecting link overhauling platform
CN205287546U (en) Novel gymnastics athletic training assistor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20190517

CF01 Termination of patent right due to non-payment of annual fee