CN203295132U - Lifting device for high-rise operation - Google Patents

Lifting device for high-rise operation Download PDF

Info

Publication number
CN203295132U
CN203295132U CN2013202599901U CN201320259990U CN203295132U CN 203295132 U CN203295132 U CN 203295132U CN 2013202599901 U CN2013202599901 U CN 2013202599901U CN 201320259990 U CN201320259990 U CN 201320259990U CN 203295132 U CN203295132 U CN 203295132U
Authority
CN
China
Prior art keywords
lever arm
base
steel rope
bont
retarder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202599901U
Other languages
Chinese (zh)
Inventor
王露美
柳丽
章剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo University
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN2013202599901U priority Critical patent/CN203295132U/en
Application granted granted Critical
Publication of CN203295132U publication Critical patent/CN203295132U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a lifting device for high-rise operation. The lifting device for high-rise operation comprises a man-riding device and a lifting device body and is characterized in that the lifting device body comprises a base, at least one steel wire rope reeling and unreeling assembly, a motor, a brake and a speed reducer, wherein the motor, the brake and the speed reducer are fixedly installed on the base; a driving shaft of the motor is connected with an input shaft of the speed reducer through a coupler; the brake is installed on the coupler; an output shaft of the speed reducer is connected with the steel wire rope reeling and unreeling assembly; a plurality of trundles are fixedly arranged on the lower surface of the base; a locating mechanism is arranged on the base. The lifting device for high-rise operation has the advantages that the lifting device body is placed at the top of a high-rise, a steel wire rope is unreeled so that the man-riding device can be lifted from the ground, after the man-riding device is lifted to a required height, braking is conducted, operation of repair, maintenance, cleaning and the like is conducted on the outer wall face of the high-rise by an operator, and the lifting device for high-rise operation is safe, reliable and high in work efficiency. Due to the fact that a lever arm angle regulating mechanism is arranged in the steel wire rope reeling and unreeling assembly, the angle of a lever arm can be regulated and the distance between the operator and the wall face can be controlled.

Description

A kind of bont for high-building working
Technical field
The utility model relates to a kind of equipment for high-building working, relates in particular to a kind of bont for high-building working.
Background technology
Along with expanding economy, in city, high buildings and large mansions are more and more, and owing to being exposed to wind and rain, the impact of dust pollution and artificial or accidentalia, after a period of time, the outside face of building all will be subject to pollution or damage in various degree, become dirty gloomy, therefore, maintenance, maintenance and the cleaning etc. of high building exterior wall face have now all become common job requirements.But present ground rise or fall machine can't arrive the height more than 15 meters, and with rope, down hang the staff from roof, carries out that the danger coefficient of operation is high and work efficiency is also low.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of bont for high-building working of safe and reliable, high efficiency.
the utility model solves the problems of the technologies described above the technical scheme that adopts: a kind of bont for high-building working, comprise manned equipment and jacking system, described jacking system comprises base, at least one steel rope folding and unfolding assembly and be fixedly mounted on the motor on described base, drg, retarder, the axle drive shaft of described motor is connected with the input shaft of described retarder by coupler, described drg is arranged on described coupler, the output shaft of described retarder is connected with described steel rope folding and unfolding assembly, on the lower surface of described base, be fixedly installed a plurality of castors, on described base, be provided with detent mechanism.
described steel rope folding and unfolding assembly comprises reel assemblies, roller stand, lever arm and steel rope, described roller stand is fixedly mounted on described base, described reel assemblies is coupling on described roller stand, described reel assemblies is fixedly connected with the output shaft of described retarder, one end of described lever arm is coupling on described base, the other end of described lever arm is free end, described steel rope is on described reel assemblies, the end of described steel rope is walked around the free end of described lever arm and is fixedly connected with the suspension hook that is useful on the described manned equipment of slinging, on described base, be provided with the lever arm angle adjusting mechanism.
Described lever arm angle adjusting mechanism comprises hydraulic actuating cylinder and the piston rod that is arranged in described hydraulic actuating cylinder, and the lower end of described hydraulic actuating cylinder is coupling on described base, and the upper end of described piston rod and described lever arm are coupling.
On the free end of described lever arm, be connected with pulley, described steel rope is walked around described pulley.
Described reel assemblies comprises reel and is fixedly connected on the flange at described reel two ends, described steel rope is on described reel, the output shaft of described retarder is fixedly connected with the flange of an end wherein, and the flange of the other end and described roller stand are coupling.
Described steel rope folding and unfolding assembly is two groups.
Described detent mechanism comprises strut bar and Anti-slip cover, described strut bar be passed down through described base and with described base bolt, described Anti-slip cover is enclosed within on described strut bar.
Described manned equipment is hanging basket or box.
Described motor is double-speed motor, and described retarder is worm type of reduction gearing; Because motor adopts double-speed motor, when upwards lifting by crane, can first fast rise, during near desired height, change the rotating speed rising, while arriving assigned address, brake, to guarantee operating personnel's safety.
Compared with prior art, the utility model has the advantages that the roof that jacking system is placed on to mansion, put down steel rope, then from the manned equipment of slinging on the ground, after rising to the height that needs, brake, the operation that the wall face in operating personnel Bian Kedui building keeps in repair, maintains, cleans etc., safe and reliable, high efficiency; And, owing in steel rope folding and unfolding assembly, being provided with the lever arm angle adjusting mechanism, can control the distance between operating personnel and metope by the angle of regulating lever arm.
The accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is birds-eye view of the present utility model;
Fig. 3 is the cutaway view of reel assemblies of the present utility model.
The specific embodiment
Embodiment is described in further detail the utility model below in conjunction with accompanying drawing.
as shown in the figure, a kind of bont for high-building working, comprise manned equipment (not shown) and jacking system, jacking system comprises base 1, two groups of steel rope folding and unfolding assemblies and be fixedly mounted on the motor 2 on base 1, drg 3, retarder 4, the axle drive shaft of motor 2 is connected with the input shaft of retarder 4 by coupler 21, drg 3 is arranged on coupler 21, steel rope folding and unfolding assembly comprises reel assemblies 5, roller stand 6, lever arm 7 and steel rope 8, roller stand 6 is fixedly mounted on base 1, reel assemblies 5 comprises reel 51 and is fixedly connected on the flange 52 at reel 51 two ends, the output shaft of retarder 4 is fixedly connected with the flange 52 of an end wherein, flange 52 and the roller stand 6 of the other end are coupling, steel rope 8 is on reel 51, one end of lever arm 7 is coupling on base 1, the other end of lever arm 7 is free end, on the free end of lever arm 7, be connected with pulley 71, the end of steel rope 8 is walked around pulley 71 and is fixedly connected with the suspension hook 81 that is useful on the manned equipment (not shown) of slinging, on base 1, be provided with the lever arm angle adjusting mechanism, the lever arm angle adjusting mechanism comprises hydraulic actuating cylinder 9 and is arranged on the piston rod 91 in hydraulic actuating cylinder 9, the lower end of hydraulic actuating cylinder 9 is coupling on base 1, the upper end of piston rod 91 and lever arm 7 are coupling, on the lower surface of base 1, be fixedly installed a plurality of castors 11, strut bar 12 be passed down through base 1 and with base 1 bolt, on strut bar 12, cover has Anti-slip cover 13.
In above-described embodiment, manned equipment can be hanging basket or box, and motor 2 adopts double-speed motor, and retarder 4 adopts worm type of reduction gearing.

Claims (9)

1. bont for high-building working, comprise manned equipment and jacking system, it is characterized in that described jacking system comprises base, at least one steel rope folding and unfolding assembly and be fixedly mounted on the motor on described base, drg, retarder, the axle drive shaft of described motor is connected with the input shaft of described retarder by coupler, described drg is arranged on described coupler, the output shaft of described retarder is connected with described steel rope folding and unfolding assembly, on the lower surface of described base, be fixedly installed a plurality of castors, on described base, be provided with detent mechanism.
2. a kind of bont for high-building working as claimed in claim 1, it is characterized in that described steel rope folding and unfolding assembly comprises reel assemblies, roller stand, lever arm and steel rope, described roller stand is fixedly mounted on described base, described reel assemblies is coupling on described roller stand, described reel assemblies is fixedly connected with the output shaft of described retarder, one end of described lever arm is coupling on described base, the other end of described lever arm is free end, described steel rope is on described reel assemblies, the end of described steel rope is walked around the free end of described lever arm and is fixedly connected with the suspension hook that is useful on the described manned equipment of slinging, on described base, be provided with the lever arm angle adjusting mechanism.
3. a kind of bont for high-building working as claimed in claim 2, it is characterized in that described lever arm angle adjusting mechanism comprises hydraulic actuating cylinder and is arranged on the piston rod in described hydraulic actuating cylinder, the lower end of described hydraulic actuating cylinder is coupling on described base, and the upper end of described piston rod and described lever arm are coupling.
4. a kind of bont for high-building working as claimed in claim 2, is characterized in that being connected with pulley on the free end of described lever arm, and described steel rope is walked around described pulley.
5. a kind of bont for high-building working as claimed in claim 2, it is characterized in that described reel assemblies comprises reel and the flange that is fixedly connected on described reel two ends, described steel rope is on described reel, the output shaft of described retarder is fixedly connected with the flange of an end wherein, and the flange of the other end and described roller stand are coupling.
6. a kind of bont for high-building working as claimed in claim 1, is characterized in that described steel rope folding and unfolding assembly is two groups.
7. a kind of bont for high-building working as claimed in claim 1, it is characterized in that described detent mechanism comprises strut bar and Anti-slip cover, described strut bar be passed down through described base and with described base bolt, described Anti-slip cover is enclosed within on described strut bar.
8. a kind of bont for high-building working as claimed in claim 1, is characterized in that described manned equipment is hanging basket or box.
9. a kind of bont for high-building working as claimed in claim 1, is characterized in that described motor is double-speed motor, and described retarder is worm type of reduction gearing.
CN2013202599901U 2013-05-13 2013-05-13 Lifting device for high-rise operation Expired - Fee Related CN203295132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202599901U CN203295132U (en) 2013-05-13 2013-05-13 Lifting device for high-rise operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202599901U CN203295132U (en) 2013-05-13 2013-05-13 Lifting device for high-rise operation

Publications (1)

Publication Number Publication Date
CN203295132U true CN203295132U (en) 2013-11-20

Family

ID=49571163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202599901U Expired - Fee Related CN203295132U (en) 2013-05-13 2013-05-13 Lifting device for high-rise operation

Country Status (1)

Country Link
CN (1) CN203295132U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692303A (en) * 2015-03-19 2015-06-10 长安大学 Electrically-driven folding-arm high-altitude operation car, and leveling system and leveling method thereof
CN107055373A (en) * 2016-12-12 2017-08-18 哈尔滨理工大学 A kind of small-sized weight lift
CN107086474A (en) * 2017-06-26 2017-08-22 国网河南省电力公司濮阳供电公司 A kind of electricity box install power assisting device
CN108069354A (en) * 2016-11-15 2018-05-25 高建文 The removable telescopic type erecting by overhang for being installed in building roof ground
CN108403029A (en) * 2018-01-30 2018-08-17 金文杰 A kind of exterior wall cleaning device
CN109775627A (en) * 2019-03-26 2019-05-21 吴燕青 A kind of aerial platform for building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692303A (en) * 2015-03-19 2015-06-10 长安大学 Electrically-driven folding-arm high-altitude operation car, and leveling system and leveling method thereof
CN108069354A (en) * 2016-11-15 2018-05-25 高建文 The removable telescopic type erecting by overhang for being installed in building roof ground
CN107055373A (en) * 2016-12-12 2017-08-18 哈尔滨理工大学 A kind of small-sized weight lift
CN107086474A (en) * 2017-06-26 2017-08-22 国网河南省电力公司濮阳供电公司 A kind of electricity box install power assisting device
CN107086474B (en) * 2017-06-26 2022-08-02 国网河南省电力公司濮阳供电公司 Meter box installation power assisting device
CN108403029A (en) * 2018-01-30 2018-08-17 金文杰 A kind of exterior wall cleaning device
CN109775627A (en) * 2019-03-26 2019-05-21 吴燕青 A kind of aerial platform for building
CN109775627B (en) * 2019-03-26 2020-10-09 义乌市研创工业设计有限公司 High altitude construction device for building

Similar Documents

Publication Publication Date Title
CN203295132U (en) Lifting device for high-rise operation
CN102397039B (en) Folding window cleaning equipment
CN203855328U (en) Novel hoisting machine
CN204096951U (en) Building hoist suspension rod and building hoist
CN106081904A (en) Jib-type crane container spreader stabilizer
CN104146651A (en) Winch type window cleaning machine
CN206538110U (en) A kind of portable universal small-sized door type crane gear
CN203794533U (en) Light portable mobile lifting equipment
CN201665498U (en) Portable crane
CN207645755U (en) Stacker-reclaimer cable drum maintenance unit
CN204057888U (en) A kind of Multifunction high-altitude operation platform
CN203095440U (en) Special lifting device for asphalt pavement maintenance truck in high-altitude low-temperature region
CN202449763U (en) Simple pneumatic crane
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN103058072B (en) Large luffing jib tower crane introduction mechanism
CN202245524U (en) Steel wire rope recovering device
CN203245886U (en) Two-dimensional suspension type high-rise outer wall cleaning robot
CN202625763U (en) Self-propelled automatic lifting high-altitude working machine
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN204324662U (en) A kind of route-variable elevator
CN204310727U (en) The machine of tearing open built by high-rise structures
CN208249734U (en) One kind is built the road gantry crane
CN203112385U (en) Large movable arm tower crane introduction mechanism
CN202429891U (en) Crane hook device
CN201648524U (en) Steel strand wire rod pickling line bridge self-propelled trolley device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20160513

CF01 Termination of patent right due to non-payment of annual fee