CN203286274U - SF6 gas extraction and filling system for GIS - Google Patents

SF6 gas extraction and filling system for GIS Download PDF

Info

Publication number
CN203286274U
CN203286274U CN201320299598XU CN201320299598U CN203286274U CN 203286274 U CN203286274 U CN 203286274U CN 201320299598X U CN201320299598X U CN 201320299598XU CN 201320299598 U CN201320299598 U CN 201320299598U CN 203286274 U CN203286274 U CN 203286274U
Authority
CN
China
Prior art keywords
gis
gas
pipeline
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320299598XU
Other languages
Chinese (zh)
Inventor
王微波
屈枫淞
谌杨
王诗阳
王勇
唐成友
陈廷奎
白蒙渝
王珂
郑弘多
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urban Power Supply Bureau Of Chongqing Electric Power Co ltd
State Grid Corp of China SGCC
Original Assignee
Urban Power Supply Bureau Of Chongqing Electric Power Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urban Power Supply Bureau Of Chongqing Electric Power Co ltd, State Grid Corp of China SGCC filed Critical Urban Power Supply Bureau Of Chongqing Electric Power Co ltd
Priority to CN201320299598XU priority Critical patent/CN203286274U/en
Application granted granted Critical
Publication of CN203286274U publication Critical patent/CN203286274U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an SF6 gas extraction and filling system for GIS (gas insulated switchgear). The system comprises an SF6 recovery device, a vacuum pump, an SF6 storage device, a vacuum gauge and a connecting pipeline. The connecting pipeline is a combined pipeline with four intercommunicated pipes. Four ports of the connecting pipeline are respectively provided with a movable connector matching with a connected device. Any one pipe of the combined pipeline can be opened or closed individually. Three pipes of the combined pipeline are respectively connected to a GIS body, the SF6 recovery device and the vacuum pump, and another pipe is successively in connection with the vacuum gauge and the SF6 storage device respectively. The SF6 gas extraction and filling system disclosed in the utility model can greatly save the time of SF6 gas extraction and filling from/into the GIS, and has good internal pressure resistant ability and sealing reliability. In addition, the SF6 gas extraction and filling system involved in the utility model also has universality.

Description

GIS SF 6System is extracted and be filled with to gas out
Technical field
The utility model relates to a kind of GIS SF 6System is extracted and be filled with to gas out.
Background technique
GIS(GAS INSULATED SWITCHGEAR) be the abbreviation of gas-insulating and fully-enclosed combined electrical apparatus.It is comprised of circuit breaker, isolating switch, earthed switch, mutual inductor, lightning arrester, bus, link and outlet terminal etc., and these parts all are enclosed in the shell of metal ground connection, and section is filled with the SF of certain pressure within it 6Insulating gas, also claim SF 6Fully closed combined electric unit.
GIS equipment since 20th century, the sixties was practical, has extensively run on all over the world.The GIS compact structure, floor space is little, reliability is high, high safety, extensively moves high pressure, ultrahigh pressure, extra-high voltage field; But also there is SF in GIS 6The problems such as Leakage Gas, the infiltration of outside moisture, insulation ag(e)ing, these problems all can cause the GIS internal fault.Need to extract out and be filled with SF before and after the GIS troubleshooting 6Gas, and extract and be filled with SF 6The gas time is sometimes longer than the repair time, has a strong impact on resident living power utility.
Extract at present and be filled with SF 6The SF of gas 6Recovering device, vacuum pump, vacuum measuring instrument, SF 6Storage device directly is connected with GIS by common pipe, is taking out SF 6Gas → vacuumizing → survey degree of vacuum → fill SF 6The device that needs frequent switching to connect in the process of gas, waste a large amount of time; In addition, because working procedure is very high to the requirement of sealing, each COMM communication all needs to re-start good sealing, further increased the time of COMM communication, and the probability of poor sealing is high.
The model utility content
In view of this, the utility model provides a kind of good seal performance, efficiently GIS SF 6System is extracted and be filled with to gas out.
The utility model discloses a kind of GIS SF 6Gas is extracted out and is filled with system, comprises SF 6Recovering device, vacuum pump, SF 6Storage device, vacuum measuring instrument and connecting tube, described connecting tube are the composite tubes with four intercommunication pipelines, and any pipeline of described composite tube all can be opened separately or close, wherein three pipelines of this composite tube respectively with GIS body, SF 6Recovering device is connected with vacuum pump, another root pipeline successively respectively with vacuum measuring instrument and SF 6Storage device is connected.
Further, the port of described pipeline arranges the mobilizable joint that has respectively with the device that is connected, to be complementary.
Further, the port of described joint and pipeline is threaded connection, and is added with the pressure-resistant seal packing ring between this joint and pipe end.
Further, described composite tube and joint are stainless steel, and described pressure-resistant seal circle is the red copper pad.
The beneficial effects of the utility model are: the utility model has designed a kind of novel GIS SF 6System is extracted and be filled with to gas out, this system is taken into account the GIS equipment connection to recovering device, vacuum pump, gas cylinder, vacuum together simultaneously, the switch that only needs to open and close corresponding pipeline just can be realized the switching of equipment, thereby has significantly saved the time of switching device; And the utility model pipe end being provided with can be movable jointing, can, according to because equipment is different, changing corresponding joint, guarantee the versatility of native system; In addition, the utility model pipeline and jointing have good interior pressure tolerance; Finally, the utility model with once bleed and gas replenishment process in only need once sealing, improved the sealing reliability, saved the sealing time.
Description of drawings
Below in conjunction with drawings and Examples, the utility model is further described;
Fig. 1 is the utility model GIS SF 6System schematic is extracted and be filled with to gas out.
Embodiment
Hereinafter with reference to accompanying drawing, preferred embodiment of the present utility model is described in detail.
GIS SF of the present utility model 6Gas is extracted out and is filled with system as shown in Figure 1: comprise SF 6Recovering device 2, vacuum pump 3, SF 6Storage device 4, vacuum measuring instrument (vacuum measuring instrument and SF 6Storage device successively is positioned at 4 position in chronological order) and connecting tube 5, described connecting tube 5 is the composite tubes with four intercommunication pipelines 6, on any pipeline 6 of described composite tube 5, a switch 7 is arranged, all can open separately or close, wherein three pipelines of this composite tube 5 respectively with GIS body 1, SF 6Recovering device 2 is connected with vacuum pump 3, another root pipeline successively respectively with vacuum measuring instrument and SF 6Storage device 4 is connected; In addition, the port of connecting tube 5 is respectively arranged with a mobilizable joint 8 that is complementary with the institute connection set; Further, described joint 8 is threaded connection with the port of connecting tube 5, is added with the pressure-resistant seal circle between this joint and pipe end; Especially, described composite tube and joint are stainless steel, and described pressure-resistant seal circle is the red copper pad.
SF of the present utility model 6Gas is extracted out and is filled with system and can carry out according to following steps in use: at first selected suitable joint before maintenance GIS, and assemble SF of the present utility model 6System is extracted and be filled with to gas out; Then open and GIS body and SF 6Switch on the pipeline that recovering device is connected also cuts out other switches, thereby extracts the SF in the GIS body out 6Gas; Then after maintenance GIS, be filled with SF 6Before gas, the GIS body is vacuumized, this process only need to be opened the switch on the pipeline that is connected with vacuum pump and be closed and SF 6The switch that recovering device is connected on pipeline just can realize, only need in the process that vacuumizes unlatching be connected with vacuum measuring instrument switch on pipeline just can measure GIS in degree of vacuum whether reach requirement; Finally, when reaching requirement, degree of vacuum takes off vacuum measuring instrument and load onto SF 6Storage device, be filled with SF in the GIS body 6Gas, be filled with SF in the GIS body 6Gas, this process also only need the corresponding switch of opening and closing just can realize.GIS SF of the present utility model 6The gas extraction is taken into account the GIS equipment connection to recovering device, vacuum pump, gas cylinder, vacuum simultaneously with the system that is filled with and is in the same place, and only needs a switch that opens and closes corresponding pipeline just can realize the switching of equipment, has significantly saved the time of switching device; And the utility model pipe end being provided with can be movable jointing, can, according to because equipment is different, changing corresponding joint, guarantee the versatility of native system; In addition, the utility model pipeline and jointing have good interior pressure tolerance; Finally, the utility model with once bleed and gas replenishment process in only need once sealing, improved the sealing reliability, saved the sealing time.
Explanation is finally, above embodiment is only unrestricted in order to the technical solution of the utility model to be described, although by with reference to preferred embodiment of the present utility model, model utility being described, but those of ordinary skill in the art is to be understood that, can make various changes to it in the form and details, and not depart from the spirit and scope of the present utility model that appended claims limits.

Claims (4)

1. GIS SF 6Gas is extracted out and is filled with system, comprises SF 6Recovering device, vacuum pump, SF 6Storage device and vacuum measuring instrument, it is characterized in that: also comprise connecting tube, described connecting tube is the composite tube with four intercommunication pipelines, and any pipeline of described composite tube all can be opened separately or close, wherein three pipelines of this composite tube respectively with GIS body, SF 6Recovering device is connected with vacuum pump, another root pipeline successively respectively with vacuum measuring instrument and SF 6Storage device is connected.
2. GIS SF as claimed in claim 1 6Gas is extracted out and is filled with system, and it is characterized in that: the port of described connecting tube is respectively arranged with a mobilizable joint that is complementary with the device that is connected.
3. GIS SF as claimed in claim 2 6Gas is extracted out and is filled with system, and it is characterized in that: the port of described joint and pipeline is threaded connection, and is added with the pressure-resistant seal packing ring between this joint and pipe end.
4. GIS SF as claimed in claim 3 6Gas is extracted out and is filled with system, and it is characterized in that: described pipeline and joint are stainless steel, and described pressure-resistant seal packing ring is the red copper pad.
CN201320299598XU 2013-05-28 2013-05-28 SF6 gas extraction and filling system for GIS Expired - Fee Related CN203286274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320299598XU CN203286274U (en) 2013-05-28 2013-05-28 SF6 gas extraction and filling system for GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320299598XU CN203286274U (en) 2013-05-28 2013-05-28 SF6 gas extraction and filling system for GIS

Publications (1)

Publication Number Publication Date
CN203286274U true CN203286274U (en) 2013-11-13

Family

ID=49542635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320299598XU Expired - Fee Related CN203286274U (en) 2013-05-28 2013-05-28 SF6 gas extraction and filling system for GIS

Country Status (1)

Country Link
CN (1) CN203286274U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322408A (en) * 2013-05-28 2013-09-25 国家电网公司 System for pumping and inflating SF6 for gas insulated switchgear
CN111895268A (en) * 2020-07-15 2020-11-06 广东电网有限责任公司 Sulfur hexafluoride gas consumption monitoring complete device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322408A (en) * 2013-05-28 2013-09-25 国家电网公司 System for pumping and inflating SF6 for gas insulated switchgear
CN103322408B (en) * 2013-05-28 2015-10-28 国家电网公司 GIS sulfur hexafluoride gas is extracted out and is filled with system
CN111895268A (en) * 2020-07-15 2020-11-06 广东电网有限责任公司 Sulfur hexafluoride gas consumption monitoring complete device

Similar Documents

Publication Publication Date Title
CN103322408B (en) GIS sulfur hexafluoride gas is extracted out and is filled with system
CN101521360A (en) Insulation mode for metal closed combined electrical appliance
CN203286274U (en) SF6 gas extraction and filling system for GIS
CN204553942U (en) SF6 gas vacuumizes and fills integrated triple valve
CN201435572Y (en) Electric outgoing sleeve
CN105067976A (en) Cable GIS terminal integral prefabricated AC withstand voltage testing device
CN201369277Y (en) Disconnecting-grounding switch
CN203707003U (en) Gas supplementing device used in operation process of gas insulated switchgear (GIS)
CN209804536U (en) Miniaturized vacuum type gas insulated metal enclosed switchgear
CN203180419U (en) Double-chamber environment-friendly gas-insulated metal-enclosed switchgear
CN203084146U (en) SF6 gas insulation high voltage electrical apparatus-used insulating part partial discharge test device
CN104112999B (en) A kind of solid insulation ring main unit
CN205810681U (en) A kind of solid insulation high-pressure vacuum breaker disconnecting switch
CN203135303U (en) Environmentally-friendly gas-insulated vacuum sealed-type switch device
CN204179559U (en) A kind of GIS Direct Action Type manual operation isolation fracture
CN203967575U (en) A kind of device of getting SF6 gas in GIS equipment
CN203631409U (en) Vacuum switch on solid insulated column
CN103594277A (en) Gas supplementing device used in operation process of gas insulated switchgear (GIS)
CN105552770A (en) Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device
CN203180421U (en) Single-chamber environment-friendly gas-insulated metal-enclosed switchgear
CN204947441U (en) 126kVGIS fast junction apparatus
CN206820353U (en) Gas-filling cabinet
CN204497654U (en) A kind of Threephase common-box HGIS equipment
CN203983830U (en) A kind of solid insulation ring main unit
CN105003820A (en) Inflation apparatus and inflation method of GIS switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131113

Termination date: 20180528