CN105552770A - Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device - Google Patents

Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device Download PDF

Info

Publication number
CN105552770A
CN105552770A CN201610076035.2A CN201610076035A CN105552770A CN 105552770 A CN105552770 A CN 105552770A CN 201610076035 A CN201610076035 A CN 201610076035A CN 105552770 A CN105552770 A CN 105552770A
Authority
CN
China
Prior art keywords
gis
main transformer
terminal
inflatable
bushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610076035.2A
Other languages
Chinese (zh)
Inventor
凌云昌
夏春芬
仲崇合
崔孝强
孔凡场
刘淑艳
隋波
林善明
付钰正
李婕闻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JILIN SONGJIANGHE HYDROPOWER Co Ltd
State Grid Xinyuan Hydropower Co Ltd
State Grid Corp of China SGCC
Original Assignee
JILIN SONGJIANGHE HYDROPOWER Co Ltd
State Grid Xinyuan Hydropower Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JILIN SONGJIANGHE HYDROPOWER Co Ltd, State Grid Xinyuan Hydropower Co Ltd, State Grid Corp of China SGCC filed Critical JILIN SONGJIANGHE HYDROPOWER Co Ltd
Priority to CN201610076035.2A priority Critical patent/CN105552770A/en
Publication of CN105552770A publication Critical patent/CN105552770A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B13/00Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle
    • H02B13/02Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle with metal casing
    • H02B13/035Gas-insulated switchgear
    • H02B13/0358Connections to in or out conductors

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

一种变压器高压套管与GIS设备间的连接体,属于高压送变电技术领域,其特征是:在主变侧,在主变高套外部加装充气式终端和充气绝缘套筒,高套电气引出端与充气式终端内部导电杆通过电气连接件插接固定;在GIS侧,在GIS套管侧增设一套GIS终端,将SF6气体绝缘方式转变为空气绝缘方式。有益效果是:1)、新型主变高压套管及GIS套管连接方式简单,结构设计合理,运行性能可靠;2)此种结构在检修时拆装方便并有明显的断开点,安全措施可靠;3)在主变检修试验时接线方便,不开检修手孔、不排气进行检修试验工作,试验测试没有误差,便于数据异常时的对比分析和故障点的查找。4)改动后试验时只需断引,不必拆装GIS套管,减少了工作量和设备故障率。

A connecting body between a transformer high-voltage bushing and GIS equipment, which belongs to the technical field of high-voltage power transmission and transformation, and is characterized in that: on the main transformer side, an inflatable terminal and an inflatable insulating sleeve are installed outside the main transformer high sleeve, and the high sleeve The electrical outlet and the internal conductive rod of the inflatable terminal are plugged and fixed through electrical connectors; on the GIS side, a set of GIS terminals is added on the GIS bushing side to change the SF6 gas insulation method to the air insulation method. Beneficial effects are: 1) The new main transformer high-voltage bushing and GIS bushing are connected in a simple way, the structure design is reasonable, and the operation performance is reliable; 2) This structure is easy to disassemble and assemble during maintenance and has obvious disconnection points, and safety measures Reliable; 3) The wiring is convenient during the maintenance test of the main transformer. The maintenance test is carried out without opening the maintenance hand hole and exhausting. 4) After the modification, it is only necessary to disconnect the lead during the test, and there is no need to disassemble the GIS casing, which reduces the workload and equipment failure rate.

Description

一种变压器高压套管与GIS设备间的连接体Connecting body between high-voltage bushing of transformer and GIS equipment

技术领域 technical field

本发明属于高压送变电技术领域。 The invention belongs to the technical field of high-voltage power transmission and transformation.

背景技术 Background technique

目前GIS成套配电设备在国内外66kV~500kV等级的配电系统中普遍采用,以代替敞开式开关站。主变高压侧与GIS出线大多采用直连方式(高套被密封在GIS套管内),考虑到GIS设备充、排气工艺复杂,工期较长且对高电压设备可能带来的不稳定因素,各电厂进行变压器试验时均采用延长试验周期,或在GIS接地刀闸处接线,带一段GIS设备对主变压器进行粗略测试并进行数值趋势比较的手段来大致判断主变状态,由于主变高套至GIS配电设备间距离较长,且考虑到接地刀闸处的接触电阻对变压器直流电阻数值影响较大,测得数值只能作为参考,无法按照预防性试验规程要求进行精确测试。 At present, GIS complete sets of power distribution equipment are widely used in 66kV~500kV power distribution systems at home and abroad to replace open switch stations. Most of the high-voltage side of the main transformer and the GIS outgoing line are directly connected (the high-voltage casing is sealed in the GIS casing). Considering the complex charging and exhausting process of the GIS equipment, the long construction period and the possible instability caused by the high-voltage equipment, When conducting transformer tests in each power plant, the test period is extended, or the GIS grounding switch is connected, and a section of GIS equipment is used to roughly test the main transformer and compare the numerical trend to roughly judge the state of the main transformer. The distance to the GIS power distribution equipment is long, and considering that the contact resistance at the grounding knife switch has a great influence on the DC resistance value of the transformer, the measured value can only be used as a reference, and it cannot be accurately tested according to the requirements of the preventive test regulations.

主变高压侧和GIS出线采用直连方式(高套被密封在GIS套管内)存在的不足:1、每年进行变压器试验时必须将GIS内SF6气体回收、打开GIS手孔、断引及接引、抽真空及充SF6气体等工作,每次试验一般需3天时间。2、当厂用电系统采用主变倒送带厂用电的方式下,主变同时承担厂用电倒送工作,检修时间无法有效保证;3、在进行例行主变预防性试验时频繁进行SF6气体的充、放工作,易使GIS设备密封不良、泄漏、受潮、进入粉尘及SF6气体泄漏生成环境污染;4、此种结构如进行主变耐压试验,还需要拆除一段GIS套管增加了工程量,并且不利于设备安全稳定运行。5、接地刀闸处的接触电阻对变压器直流电阻数值影响较大,测得数值只能作为参考。 The high voltage side of the main transformer and the GIS outgoing line adopt the direct connection method (the high sleeve is sealed in the GIS sleeve). The disadvantages: 1. During the annual transformer test, the SF6 gas in the GIS must be recovered, the GIS hand hole must be opened, and the lead shall be disconnected and connected. , Vacuuming and SF6 gas filling work, each test generally takes 3 days. 2. When the factory power system adopts the mode of main transformer reversing with factory power, the main transformer undertakes the job of reversing the factory power at the same time, and the maintenance time cannot be effectively guaranteed; 3. Frequent preventive tests of the routine main transformer The charging and discharging of SF6 gas will easily cause the GIS equipment to be poorly sealed, leak, get damp, enter dust, and cause environmental pollution due to SF6 gas leakage; 4. If this type of structure is used for the main transformer pressure test, a section of GIS casing needs to be removed This increases the amount of work and is not conducive to the safe and stable operation of the equipment. 5. The contact resistance at the grounding switch has a great influence on the DC resistance value of the transformer, and the measured value can only be used as a reference.

发明内容 Contents of the invention

本发明的目的是:提供一种变压器高压套管与GIS设备间的连接体,它可不必拆装GIS套管,减少了检修工作量和设备故障率。 The purpose of the present invention is to provide a connecting body between the transformer high-voltage bushing and GIS equipment, which does not need to disassemble the GIS bushing, and reduces the maintenance workload and equipment failure rate.

本发明的技术方案如下: Technical scheme of the present invention is as follows:

在主变侧:在主变高套外部加装充气式终端和充气绝缘套筒,高套电气引出端与充气式终端内部导电杆通过电气连接件插接固定; On the side of the main transformer: add an inflatable terminal and an inflatable insulating sleeve outside the high casing of the main transformer, and the electrical outlet of the high casing and the internal conductive rod of the inflatable terminal are plugged and fixed through electrical connectors;

在GIS侧:在GIS套管侧增设一套GIS终端,将SF6气体绝缘方式转变为空气绝缘方式。终端外部的复合绝缘裙增加了电气爬电距离。 On the GIS side: add a set of GIS terminals on the GIS bushing side to change the SF6 gas insulation method to air insulation method. Composite insulating skirts on the outside of the terminals increase the electrical creepage distance.

使用软导线、设备线夹分别与主变高套终端和GIS终端接线端相连接,采用螺栓固定方式。 Use soft wires and equipment clamps to connect with the main transformer high sleeve terminal and the GIS terminal terminal respectively, and use bolts to fix them.

本发明的有益效果是:1)、新型主变高压套管及GIS套管连接方式简单,结构设计合理,运行性能可靠;2)此种结构在检修时拆装方便并有明显的断开点,安全措施可靠;3)在主变检修试验时接线方便,不开检修手孔、不排气进行检修试验工作,试验测试没有误差,便于数据异常时的对比分析和故障点的查找。4)进行主变耐压等大型试验时原连接方式必须要对GIS套管进行拆除方可进行,改动后试验时只需断引,不必拆装GIS套管,减少了工作量和设备故障率。 The beneficial effects of the present invention are: 1) The new main transformer high-voltage bushing and GIS bushing are connected in a simple way, the structure design is reasonable, and the operation performance is reliable; 2) This structure is easy to disassemble and assemble during maintenance and has obvious disconnection points , The safety measures are reliable; 3) The wiring is convenient during the maintenance test of the main transformer, and the maintenance test is carried out without opening the maintenance hand hole and exhausting. 4) When carrying out large-scale tests such as main transformer pressure resistance, the original connection method must remove the GIS bushing before proceeding. After the modification, only the lead needs to be disconnected during the test, and the GIS bushing does not need to be disassembled, which reduces the workload and equipment failure rate .

附图说明 Description of drawings

图1是本发明结构示意图。 Fig. 1 is a schematic diagram of the structure of the present invention.

具体实施方式 detailed description

下面结合附图对本发明做进一步描述: The present invention will be further described below in conjunction with accompanying drawing:

如图所示,1是GIS终端、2是设备线夹、3是软导线、4是主变高套充气式终端、5是电气连接件、6是充气绝缘套筒、7是主变高套、8是主变本体。 As shown in the figure, 1 is the GIS terminal, 2 is the equipment clamp, 3 is the flexible wire, 4 is the inflatable terminal of the main variable height sleeve, 5 is the electrical connector, 6 is the inflatable insulating sleeve, and 7 is the main variable height sleeve , 8 are the main transformer body.

主变侧:在主变高套外部加装充气(SF6)式终端4和充气(SF6)绝缘套筒6,高套电气引出端与充气(SF6)式终端内部导电杆通过电气连接件5插接; On the main transformer side: Install an inflatable (SF6) type terminal 4 and an inflatable (SF6) insulating sleeve 6 on the outside of the main transformer high sleeve, and the electrical outlet of the high sleeve and the internal conductive rod of the inflatable (SF6) type terminal are inserted through the electrical connector 5 catch;

GIS侧:在GIS套管侧增设一套GIS终端,将SF6气体绝缘方式转变为空气绝缘方式。终端外部的复合绝缘裙增加了电气爬电距离。 GIS side: Add a set of GIS terminals on the GIS bushing side to change the SF6 gas insulation method to air insulation method. Composite insulating skirts on the outside of the terminals increase the electrical creepage distance.

使用软导线、设备线夹分别与主变高套终端和GIS终端接线端相连接,采用螺栓固定方式。 Use soft wires and equipment clamps to connect with the main transformer high sleeve terminal and the GIS terminal terminal respectively, and use bolts to fix them.

通过采用这种新型连接结构,将密封在GIS套管内部的电气连接转换为连接固定部件裸露在空气外部,检修、试验时的断引、试验直接拆除软连接导线即可,极大地方便了检修、试验时的断引、试验、接线等工作。 By adopting this new connection structure, the electrical connection sealed inside the GIS bushing is converted into a connection and fixed part exposed to the outside of the air, and the flexible connection wire can be removed directly for maintenance, test disconnection, and test, which greatly facilitates maintenance. , Disconnection, testing, wiring and other work during the test.

Claims (2)

1.一种变压器高压套管与GIS设备间的连接体,其特征是: 1. A connecting body between a transformer high voltage bushing and GIS equipment, characterized in that: 在主变侧,在主变高套外部加装充气式终端和充气绝缘套筒,高套电气引出端与充气式终端内部导电杆通过电气连接件插接固定; On the main transformer side, an inflatable terminal and an inflatable insulating sleeve are installed outside the main transformer high sleeve, and the electrical outlet of the high sleeve and the internal conductive rod of the inflatable terminal are plugged and fixed through electrical connectors; 在GIS侧,在GIS套管侧增设一套GIS终端,将SF6气体绝缘方式转变为空气绝缘方式。 On the GIS side, a set of GIS terminals is added on the GIS bushing side to change the SF6 gas insulation method to air insulation method. 2.如权利要求1所述的一种变压器高压套管与GIS设备间的连接体,其特征是:使用软导线、设备线夹分别与主变高套终端和GIS终端接线端相连接,采用螺栓固定方式。 2. The connecting body between a kind of transformer high-voltage bushing and GIS equipment as claimed in claim 1, it is characterized in that: use soft lead wire, equipment clamp to be connected with main transformer high sleeve terminal and GIS terminal terminal respectively, adopt Bolt fixing method.
CN201610076035.2A 2016-02-03 2016-02-03 Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device Pending CN105552770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610076035.2A CN105552770A (en) 2016-02-03 2016-02-03 Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610076035.2A CN105552770A (en) 2016-02-03 2016-02-03 Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device

Publications (1)

Publication Number Publication Date
CN105552770A true CN105552770A (en) 2016-05-04

Family

ID=55831791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610076035.2A Pending CN105552770A (en) 2016-02-03 2016-02-03 Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device

Country Status (1)

Country Link
CN (1) CN105552770A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112152130A (en) * 2020-10-12 2020-12-29 中电建电力检修工程有限公司 Construction method for quickly dismantling transformer directly connected with GIS equipment
CN114243525A (en) * 2021-12-15 2022-03-25 江苏安靠智能输电工程科技股份有限公司 Opening and changing integrated machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4146540B2 (en) * 1998-02-27 2008-09-10 株式会社日立製作所 Transformer integrated gas insulated switchgear
CN202171994U (en) * 2011-07-13 2012-03-21 山东达驰电气有限公司 Temporary hoisting seat for transformer
CN204885957U (en) * 2015-06-25 2015-12-16 中机国能电力工程有限公司 GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line
CN205543941U (en) * 2016-02-03 2016-08-31 国家电网公司 Connector of transformer high -tension bushing and GIS equipment room

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4146540B2 (en) * 1998-02-27 2008-09-10 株式会社日立製作所 Transformer integrated gas insulated switchgear
CN202171994U (en) * 2011-07-13 2012-03-21 山东达驰电气有限公司 Temporary hoisting seat for transformer
CN204885957U (en) * 2015-06-25 2015-12-16 中机国能电力工程有限公司 GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line
CN205543941U (en) * 2016-02-03 2016-08-31 国家电网公司 Connector of transformer high -tension bushing and GIS equipment room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112152130A (en) * 2020-10-12 2020-12-29 中电建电力检修工程有限公司 Construction method for quickly dismantling transformer directly connected with GIS equipment
CN114243525A (en) * 2021-12-15 2022-03-25 江苏安靠智能输电工程科技股份有限公司 Opening and changing integrated machine

Similar Documents

Publication Publication Date Title
CN102157830B (en) Solid insulating bus connector
CN103353574B (en) A kind of insulation test device of GIS insulated tension pole
CN203225492U (en) Built-in bus connecting structure for combined cabinet
CN109768509B (en) Elbow type joint special for electrified repair of power cable, repair device and method
CN106483413A (en) High voltage direct current cable dry type easily-testing terminal
CN202886542U (en) Junction device for cable high-voltage resistance test
CN105552770A (en) Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device
CN205543941U (en) Connector of transformer high -tension bushing and GIS equipment room
CN204241601U (en) A kind of test fuel tank for high-voltage alternating bushing shell for transformer full working scope certification test
CN206947588U (en) Bypass cable applied to cable termination accesses servicing unit
CN211014556U (en) GIS equipment defect simulation system and platform
CN204927943U (en) GIS equipment that can keep apart test
CN208013362U (en) A kind of novel ac voltage withstanding detection device
CN205657374U (en) Solid insulation boundary switch cabinet
CN204967217U (en) A connection structure that is used for between oil filled cable and dry -type crosslinked cable
CN216928258U (en) Special supporting insulating device of 220kV transformer 10kV side outlet wire sleeve
CN203967575U (en) A device for taking SF6 gas in GIS equipment
CN205786928U (en) It is connected the cover plate assay device of air chamber with GIS for oil-gas type transformator
CN206364435U (en) GIS buses standby spacing does not have a power failure enlarging functional module
CN208862536U (en) Fault isolation device under drawing for 10kV cable
CN210926854U (en) Connection device and GIS equipment for dry casing
CN204008705U (en) Partial discharge monitoring Cap for tin body
CN107863746A (en) A kind of 0.4KV power cables underground termination
CN106019022B (en) Cover plate test device for connecting gas chamber between oil-gas type transformer and GIS and operation method
CN223815913U (en) A GIS-based security controller installation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160504

WD01 Invention patent application deemed withdrawn after publication