CN105003820A - Inflation apparatus and inflation method of GIS switch - Google Patents
Inflation apparatus and inflation method of GIS switch Download PDFInfo
- Publication number
- CN105003820A CN105003820A CN201410150368.6A CN201410150368A CN105003820A CN 105003820 A CN105003820 A CN 105003820A CN 201410150368 A CN201410150368 A CN 201410150368A CN 105003820 A CN105003820 A CN 105003820A
- Authority
- CN
- China
- Prior art keywords
- air
- capsule
- valve
- gas
- inflation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention relates to an inflation apparatus and an inflation method of a GIS switch. The inflation apparatus comprises a SF6 gas cylinder and an inflation pipeline, and is characterized in that the inflation pipeline is provided with a first tee and a second tee, the first tee is arranged on the inflation pipeline close to the gas outlet end of the SF6 gas cylinder and is communicated with an air pipeline connected with a purge gas, the air pipeline is provided with an air valve, the second tee is arranged on the inflation pipeline close to the gas inlet end of a GIS switch gas barrier and is connected with a capsule for recovering the remaining SF6 gas, the connection pipeline of the second tee and the capsule is provided with a capsule valve, a pressure reducing valve is arranged between the first tee and the gas outlet end of the SF6 gas cylinder, and a gas barrier valve is arranged between the second tee and the GIS switch gas barrier. According to the present invention, the inflation apparatus has characteristics of simple structure and easy, the inflation method has characteristics of simple operation, safety and environmental protection, the problems that the air enters the GIS switch during the inflation process and the remaining SF6 gas is discharged into the atmosphere are effectively solved, and the apparatus and the method can be used for SF6 gas inflation of all GIS switches.
Description
Technical field
The present invention relates to a kind of GIS switch S F
6inflator and inflation method thereof,
Background technique
In recent years, with SF
6gas is used widely as the electrical equipment of insulating medium, Gas InsulatedSwitchgear gas insulated combined electric appliance equipment (being called for short GIS switch) is by high pressure elements combinations such as bus, circuit breaker, CT, PT isolating switch, lightning arresters together, is usually also high voltage distribution installation.The advantages such as GIS switch has reliability and Security is high, install little, the long service life of floor space, the repair cycle is long, maintenance workload is little, applied widely, are more and more applied in the above electric substation of electric pressure 35KV.GIS switch is according to working principle and working environment, and the multiple air bound of indoor design, is filled with SF
6gas.
SF
6gas is colourless, tasteless, nontoxic, nonflammable inert gas, and density is five times of air, has excellent insulating property, is a kind of desirable arc-extinguishing medium.But work as SF
6when water content is more in gas, two aspect harm can be produced: one is SF
6the electric arc analyte of gas can produce a lot of harmful matter, as SOF under moisture participates in
2, HF etc., thus corrosion circuit breaker internal structural material threaten maintainer's safety; Two be water content too much time, due to hydrogenesis, moistening insulating surface, will make its insulating strength decline, threaten safe operation.
Current GIS switch S F
6the inflation method of gas adopts SF
6gas cylinder is directly inflated GIS switch, and SF in GIS switch
6the too much main cause of gas water content is exactly each SF
6all a certain amount of air can be brought into, again containing a certain amount of moisture in air during gas inflated; When moisture content is many, harm will be produced.In addition, the SF in air
6be a reason of global warming, therefore forbid directly to airborne release SF
6gas.
Therefore need to improve existing inflation method, design a kind of new SF
6gas inflator, to have solved in gas replenishment process air in loading line and has entered loading line residue SF after GIS switch and inflation
6gas discharging atmospheric issues.
Summary of the invention
First technical problem to be solved by this invention is to provide the inflator of simple, the easy to operate GIS switch of a kind of structure, and air in gas replenishment process can be avoided to enter GIS switch and residue SF
6gas discharging air, not only ensures the normal operation of GIS switch, and use safety environmental protection.
Second technical problem to be solved by this invention is to provide a kind of inflation method of simple to operation, GIS switch that using effect is good, can effectively avoid air in gas replenishment process to enter GIS switch and residue SF
6gas discharging air, not only ensures the normal operation of GIS switch, and use safety environmental protection.
The present invention solves the technological scheme that above-mentioned first technical problem adopt: a kind of inflator of GIS switch, comprises SF
6gas cylinder and by SF
6the loading line that gas cylinder is connected with GIS switch air bound, is characterized in that: described loading line is provided with the first three-way pipe and the second three-way pipe, and wherein the first three-way pipe is arranged near SF
6on the loading line of the outlet side of gas cylinder, be connected with the air pipe line being connected purge gas, air pipe line is provided with air valve; Second three-way pipe is arranged on the loading line of the air inlet end of GIS switch air bound, remains SF with for reclaiming
6the capsule of gas is connected, and the connecting pipeline of the second three-way pipe and capsule is provided with capsule valve, at the first three-way pipe and SF
6be provided with reduction valve between the outlet side of gas cylinder, between the second three-way pipe and the air inlet end of GIS switch air bound, be provided with air bound valve.
As improvement, the inflation line between described first three-way pipe and the second three-way pipe is provided with pressure gauge.
As improvement, described capsule is spherical soft capsule, is to adopt transparent soft plastic or soft rubber to make, and make to draw materials conveniently, cost is cheap.
As improvement, described purge gas is pressurized air, and described air pipe line adopts transparent soft plastic pipe or metallic hose.Not only operation site gets gas conveniently, but also can improve the Security to operator.
Improve, described loading line adopts transparent soft plastic pipe or metallic hose, and the length of loading line is not less than 5 meters again.
The present invention solves the technological scheme that above-mentioned second technical problem adopt: a kind of inflation method of GIS switch, is characterized in that: adopt above-mentioned inflator to inflate, step is followed successively by:
1) close reduction valve, air valve, air bound valve, capsule valve, connect pipeline by inflator;
2) extrude capsule, after allowing its inner air discharge, be connected with capsule valve;
3) first open reduction valve and capsule valve, then open SF
6gas cylinder, exitted after 15 ~ 25 seconds, closed capsule valve, made air in loading line by SF
6air scavenge has arrived in capsule;
4) then open air bound valve, carry out GIS switch S F
6inflation, when equal pressure list index has arrived air bound authorized pressure, closes SF6 gas cylinder, air bound valve and reduction valve.
5) open capsule valve and air valve, after pressurized air purges 15 ~ 25 seconds, close capsule valve and air valve, make remaining SF in loading line
6gas has been rejected in capsule by pressurized air, SF will be housed
6the capsule of gas is delivered to laboratory and is processed.
As improvement, described capsule is spherical soft capsule, is to adopt transparent soft plastic or soft rubber to make, and when after capsule gassy in step 3) and step 5), should close capsule valve, gassiness capsule is changed another new capsule of installation and carries out splendid attire.
As improvement, described air pipe line adopts transparent soft plastic pipe or metallic hose.
Improve, described loading line adopts transparent soft plastic pipe or metallic hose, and the length of loading line is not less than 5 meters again.
Compared with prior art, the invention has the advantages that: two three-way pipes are installed on loading line and connect air pipe line and capsule respectively, between air pipe line and capsule, just form a purge passage like this, by the air in loading line and remaining SF
6air scavenge has arrived in capsule, efficiently solves air in gas replenishment process and enters GIS switch and residue SF
6the problem of gas discharging air, purges remaining SF in addition
6gas adopts pressurized air, and not only operation site gets gas conveniently, but also can improve the Security to operator.Inflator structure of the present invention is simple, easy to use, inflation method safety simple to operate, not only ensure that the normal operation of GIS switch, and use safety environmental protection, can be applicable to all GIS switch S F
6in gas inflated.
Accompanying drawing explanation
Fig. 1 is the structural representation of inflator of the present invention.
Embodiment
Below in conjunction with accompanying drawing, embodiment is described in further detail the present invention.
As shown in Figure 1, the GIS switch S F of the present embodiment
6the inflator of gas, comprises SF
6gas cylinder 2, GIS switch air bound 1 and by SF
6the loading line 3 that gas cylinder 2 is connected with GIS switch air bound 1, pressure gauge 8, air bound valve 10 and reduction valve 9, loading line 2 is provided with the first three-way pipe 5 and the second three-way pipe 4, and wherein the first three-way pipe 5 is arranged near SF
6on the loading line 3 of the outlet side of gas cylinder 2, be connected with the air pipe line 6 being connected purge gas, air pipe line 6 is provided with air valve 61; Second three-way pipe 4 is arranged on the loading line 3 of the air inlet end of GIS switch air bound 1, remains SF with for reclaiming
6the capsule 7 of gas is connected, and the second three-way pipe 4 with the connecting pipeline of capsule 7 are provided with capsule valve 71, and reduction valve 9 is arranged on the first three-way pipe 5 and SF
6between the outlet side of gas cylinder 2, air bound valve 10 is arranged between the air inlet end of the second three-way pipe 4 and GIS switch air bound 1, and pressure gauge 8 is arranged in the inflation line 2 between the first three-way pipe 5 and the second three-way pipe 4; So just form two " purge passage " and " filling channel " two passages, " purge passage " is made up of air pipe line 6, air valve 61, pressure gauge 8, capsule valve 71 and capsule 7; " filling channel " is by SF
6gas cylinder 2, reduction valve 9, pressure gauge 8, loading line 3 and air bound valve 10 form; Capsule 7 is spherical soft capsule, is to adopt transparent soft plastic or soft rubber to make, and make to draw materials conveniently, cost is cheap; Purge gas is pressurized air, not only operation site gets gas conveniently, but also the Security that can improve operator, air pipe line 6 adopts transparent soft plastic pipe or metallic hose, loading line 3 adopts transparent soft plastic pipe or metallic hose, because GIS switch has multiple air bound, the length of loading line 3 is generally not less than 5 meters.
GIS switch S F
6the inflation method of gas, concrete operation step is:
(1) close reduction valve 9, air valve 61, air bound valve 10, capsule valve 71, connect pipeline by Fig. 1.
(2) extrude spherical soft capsule 7, after allowing its inner air discharge, be connected with capsule valve 71.
(3) first open reduction valve 9 and capsule valve 71, then open SF
6gas cylinder 2, exitted after 20 seconds, closed capsule valve 71.Air in such loading line is just by SF
6air scavenge has arrived in capsule 7, avoids air in loading line 3 and enters GIS switch, solve SF in GIS switch
6the problem that gas moisture content is too much.
(4) open air bound valve 10, carry out GIS switch S F
6inflation, when equal pressure table 8 pointer has arrived air bound authorized pressure, closes SF
6gas cylinder 2, air bound valve 10 and reduction valve 9.
(5) open capsule valve 71 and air valve 61, after pressurized air purges 20 seconds, close capsule valve 71 and air valve 61.Such loading line 3 remains SF
6gas has just been rejected in capsule 7 by pressurized air, and capsule 7 is delivered to laboratory and processed.When after a spherical soft capsule gassy, after closing capsule valve, another new capsule 7 can be installed very easily and carry out splendid attire.Which solves residue SF in loading line 3
6gas is directly discharged into the problem of air.
Implementation result
Adopt GIS switch S F of the present invention
6after gas inflator is inflated, simple, convenient, safety, environmental protection, well solve air in gas replenishment process and enter GIS switch and residue SF
6this two problems of gas discharging air, respond well.
Claims (9)
1. an inflator for GIS switch, comprises SF
6gas cylinder and by SF
6the loading line that gas cylinder is connected with GIS switch air bound, is characterized in that: described loading line is provided with the first three-way pipe and the second three-way pipe, and wherein the first three-way pipe is arranged near SF
6on the loading line of the outlet side of gas cylinder, be connected with the air pipe line being connected purge gas, air pipe line is provided with air valve; Second three-way pipe is arranged on the loading line of the air inlet end of GIS switch air bound, remains SF with for reclaiming
6the capsule of gas is connected, and the connecting pipeline of the second three-way pipe and capsule is provided with capsule valve, at the first three-way pipe and SF
6be provided with reduction valve between the outlet side of gas cylinder, between the second three-way pipe and the air inlet end of GIS switch air bound, be provided with air bound valve.
2. inflator according to claim 1, is characterized in that: the inflation line between described first three-way pipe and the second three-way pipe is provided with pressure gauge.
3. inflator according to claim 1, is characterized in that: described capsule is spherical soft capsule, is to adopt transparent soft plastic or soft rubber to make.
4. inflator according to claim 1, is characterized in that: described purge gas is pressurized air, and described air pipe line adopts transparent soft plastic pipe or metallic hose.
5. inflator according to claim 1, is characterized in that: described loading line adopts transparent soft plastic pipe or metallic hose, and the length of loading line is not less than 5 meters.
6. an inflation method for GIS switch, is characterized in that: adopt inflator according to claim 1 to inflate, step is followed successively by:
1) close reduction valve, air valve, air bound valve, capsule valve, connect pipeline by inflator;
2) extrude capsule, after allowing its inner air discharge, be connected with capsule valve;
3) first open reduction valve and capsule valve, then open SF
6gas cylinder, exitted after 15 ~ 25 seconds, closed capsule valve, made the air in loading line arrived in capsule by SF6 air scavenge;
4) then open air bound valve, carry out GIS switch S F
6inflation, when equal pressure list index has arrived air bound authorized pressure, closes SF6 gas cylinder, air bound valve and reduction valve.
5) open capsule valve and air valve, after pressurized air purges 15 ~ 25 seconds, close capsule valve and air valve, make remaining SF in loading line
6gas has been rejected in capsule by pressurized air, SF will be housed
6the capsule of gas is delivered to laboratory and is processed.
7. inflation method according to claim 6, it is characterized in that: described capsule is spherical soft capsule, adopt transparent soft plastic or soft rubber to make, when after capsule gassy in step 3) and step 5), should capsule valve be closed, gassiness capsule be changed another new capsule of installation and carry out splendid attire.
8. inflation method according to claim 6, is characterized in that: described air pipe line adopts transparent soft plastic pipe or metallic hose.
9. inflation method according to claim 6, is characterized in that: described loading line adopts transparent soft plastic pipe or metallic hose, and the length of loading line is not less than 5 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410150368.6A CN105003820B (en) | 2014-04-15 | 2014-04-15 | The aerating device and its inflation method of GIS switches |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410150368.6A CN105003820B (en) | 2014-04-15 | 2014-04-15 | The aerating device and its inflation method of GIS switches |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105003820A true CN105003820A (en) | 2015-10-28 |
CN105003820B CN105003820B (en) | 2017-07-28 |
Family
ID=54376601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410150368.6A Active CN105003820B (en) | 2014-04-15 | 2014-04-15 | The aerating device and its inflation method of GIS switches |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105003820B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105499017A (en) * | 2016-01-25 | 2016-04-20 | 长春理工大学 | Electrospray water-feeding insulated water valve |
CN114234037A (en) * | 2021-12-27 | 2022-03-25 | 广东电网有限责任公司 | SF (sulfur hexafluoride)6Charging device with uninterrupted switch |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86207843U (en) * | 1986-10-11 | 1987-09-02 | 机械工业部第七设计研究院 | Gasfilling and recollecting apparatus |
WO2006015953A1 (en) * | 2004-08-11 | 2006-02-16 | L'Air Liquide Société Anonyme à Directoire et Conseil de Surveillance pour l'Etude et l'Exploitation des Procédés Georges Claude | Cylinder valve |
CN102352957A (en) * | 2011-10-13 | 2012-02-15 | 周平 | Electronic grade ultra pure ammonia automatic filling device and method |
CN102921338A (en) * | 2012-10-26 | 2013-02-13 | 上海天科化工检测有限公司 | Preparation device of trace component in normal-pressure balance stage-by-stage constant volume type gases |
-
2014
- 2014-04-15 CN CN201410150368.6A patent/CN105003820B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86207843U (en) * | 1986-10-11 | 1987-09-02 | 机械工业部第七设计研究院 | Gasfilling and recollecting apparatus |
WO2006015953A1 (en) * | 2004-08-11 | 2006-02-16 | L'Air Liquide Société Anonyme à Directoire et Conseil de Surveillance pour l'Etude et l'Exploitation des Procédés Georges Claude | Cylinder valve |
JP2006052787A (en) * | 2004-08-11 | 2006-02-23 | Japan Air Gases Ltd | Container valve |
CN102352957A (en) * | 2011-10-13 | 2012-02-15 | 周平 | Electronic grade ultra pure ammonia automatic filling device and method |
CN102921338A (en) * | 2012-10-26 | 2013-02-13 | 上海天科化工检测有限公司 | Preparation device of trace component in normal-pressure balance stage-by-stage constant volume type gases |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105499017A (en) * | 2016-01-25 | 2016-04-20 | 长春理工大学 | Electrospray water-feeding insulated water valve |
CN105499017B (en) * | 2016-01-25 | 2017-12-01 | 长春理工大学 | Electron spray feedwater insulation water valve |
CN114234037A (en) * | 2021-12-27 | 2022-03-25 | 广东电网有限责任公司 | SF (sulfur hexafluoride)6Charging device with uninterrupted switch |
CN114234037B (en) * | 2021-12-27 | 2024-01-05 | 广东电网有限责任公司 | SF (sulfur hexafluoride) 6 Switch uninterrupted inflation device |
Also Published As
Publication number | Publication date |
---|---|
CN105003820B (en) | 2017-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202493896U (en) | Portable sulfur hexafluoride inflation device | |
CN102129033B (en) | Test loop used for direct-current switch test | |
CN106287229B (en) | A kind of insulative gas mix body inflation system and inflation method | |
CN104215409B (en) | A kind of method of monitoring bushing shell for transformer sealing condition | |
CN105003820A (en) | Inflation apparatus and inflation method of GIS switch | |
KR200437124Y1 (en) | SF6 gas recycling equipment having SF6 measuring instrument | |
CN105299444A (en) | Intelligent SF6 (sulfur hexafluoride) gas inflation module for electrical equipment | |
CN203707003U (en) | Gas supplementing device used in operation process of gas insulated switchgear (GIS) | |
CN207263875U (en) | A kind of adjustable gas-insulated breakdown test device in closed gap | |
CN212007636U (en) | SF6 density relay inspection gas circuit connecting device | |
CN103322408B (en) | GIS sulfur hexafluoride gas is extracted out and is filled with system | |
CN202757861U (en) | Micro-water density measurement device | |
CN203273118U (en) | Multi-purpose connector of sulfur hexafluoride gas recovery device | |
CN105202358A (en) | SF6 air inflation device of electrical equipment | |
CN205303292U (en) | High voltage load switch - fuse combination switch | |
CN105390329B (en) | A kind of column type circuit breaker housing and the column type circuit breaker using the Shell of circuit breaker | |
CN104112999A (en) | Solid insulation ring main unit | |
CN203286274U (en) | SF6 gas extraction and filling system for GIS | |
CN209116013U (en) | A kind of SF6 gas automatic filling system of GIS device | |
CN202533237U (en) | Novel SF6 gas leak detector device | |
CN207301252U (en) | A kind of insulator damage test platform | |
CN103050905B (en) | Switch cubicle ac voltage withstanding insulation annex | |
CN105552770A (en) | Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device | |
CN105299445A (en) | Intelligent SF6 inflation device of electric equipment | |
KR100460623B1 (en) | SF6 gas charging a new apparatus of promote efficiency |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |