CN203279670U - Ecological culture pond for giant salamanders - Google Patents

Ecological culture pond for giant salamanders Download PDF

Info

Publication number
CN203279670U
CN203279670U CN2013202860696U CN201320286069U CN203279670U CN 203279670 U CN203279670 U CN 203279670U CN 2013202860696 U CN2013202860696 U CN 2013202860696U CN 201320286069 U CN201320286069 U CN 201320286069U CN 203279670 U CN203279670 U CN 203279670U
Authority
CN
China
Prior art keywords
ecological
pond
cave
culture pond
microcirculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013202860696U
Other languages
Chinese (zh)
Inventor
邓进婷
肖彩虹
郭红喜
芦璐
付文亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN MODERN URBAN AGRICULTURAL PLANNING AND DESIGN INSTITUTE Co Ltd
Original Assignee
WUHAN MODERN URBAN AGRICULTURAL PLANNING AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN MODERN URBAN AGRICULTURAL PLANNING AND DESIGN INSTITUTE Co Ltd filed Critical WUHAN MODERN URBAN AGRICULTURAL PLANNING AND DESIGN INSTITUTE Co Ltd
Priority to CN2013202860696U priority Critical patent/CN203279670U/en
Application granted granted Critical
Publication of CN203279670U publication Critical patent/CN203279670U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model relates to an ecological culture pond for giant salamanders. The ecological culture pond is characterized by comprising a square culture pond body, wherein an ecological water pond is arranged in the middle of the culture pond body; the ecological water pond is internally provided with a water discharging pipe; a plurality of ecological caves are formed in the four sides and the middle part of the ecological water pond; cave openings communicated with the ecological water pond are formed in the walls of the ecological caves; observation openings are formed in the tops of the ecological caves; the ecological caves are internally provided with water inlet pipes; a walkway is arranged in the middle of the culture pond body; ecological microcirculation ponds are arranged on the northeast corner and the southwest corner of the culture pond body; the ecological microcirculation ponds are internally provided with detachable aeration and filtering facilities; green lands are arranged on the other two corners of the culture pond body. According to the ecological culture pond for the giant salamanders provided by the utility model, the ecological habits of the giant salamanders are met; the ecological culture pond is suitable for cultivating the giant salamanders and the manpower is saved.

Description

A kind of giant salamander ecological culture pond
Technical field
The utility model relates to a kind of giant salamander ecological culture pond.
Background technology
Giant salamander; being commonly called as the giant salamander, belonging to national secondary and lay special stress on protecting wildlife, is one of kind comparatively original in existing amphibian; in Sichuan, Shaanxi, Hubei, Hunan etc. economize as common, be a kind ofly integrate scientific research, view and admire, the special economic animal of medicinal and cuisines.But due to the deterioration increasingly of ecological sublimity, the natural propagation rate of giant salamander is very low, therefore launches propagating artificially of giant salamander, is the important means of this endemic species of protection.But giant salamander happiness the moon keeps in dark place, growth rate is slower, taking 5 ~ 6 years under carded sliver spare out of office can sexual maturity, more than body weight reaches 500 grams, also reach commercial specification more than at least 3 years under artificial condition, and giant salamander is in the family way cloudy is afraid of that wind, the quiet fearness of happiness are frightened, the dirty characteristics of the clean fearness of happiness, cultivates very not general,, according to the ecological habit of giant salamander uniqueness, also be difficult to design the culturing pool that is fit to giant salamander.
Summary of the invention
The purpose of this utility model is to overcome the shortcoming of prior art, and a kind of giant salamander ecological culture pond is provided, and meets the ecological habit of giant salamander, is fit to giant salamander culture, and has saved manpower.
for solving above technical problem, the technical solution of the utility model is: a kind of giant salamander ecological culture pond, its difference is: it comprises square culturing pool body, the middle part of described culturing pool body is provided with ecological pond, be provided with drainpipe in described ecological pond, surrounding and the middle part in ecological pond are provided with a plurality of ecological caves, be provided with the cave mouth that communicates with ecological pond on the cave wall in described ecological cave, the top in ecological cave is provided with observation panel, be provided with water inlet pipe in ecological cave, the middle part of culturing pool body is provided with aisle, the northeast corner of culturing pool body and southwest corner are provided with ecological microcirculation pond, described ecological microcirculation is provided with dismountable aeration filtration facility in pond, be provided with greenery patches on another two jiaos of the culturing pool body.
By above technical scheme, the bottom in described ecological cave is equipped with rammed earth layer, blotter, C25 reinforced concrete successively, and the cave wall in ecological cave is the thick brick wall body of 120mm, and the top in ecological cave is to lay argillic horizon on precast concrete.
By above technical scheme, top, described ecological microcirculation pond is provided with movably cover plate.
By above technical scheme, the length of described culturing pool body and the wide 13880mm*13880mm that is respectively, the length in described ecological cave and the wide 2400mm*1240mm that is respectively, the length in described ecological microcirculation pond and the wide 2520mm*2520mm that is respectively.
The contrast prior art, beneficial features of the present utility model is as follows:
1), this giant salamander ecological culture pond, be provided with ecological microcirculation pond, can automatic cycle process, reduced labor workload;
2), this giant salamander ecological culture pond, ecological microcirculation is provided with the aeration filtration facility in pond, can improve the content of water oxygen gas, manually oxygenation;
2), this giant salamander ecological culture pond, the structure in ecological cave is well suited for the cloudy characteristic that keeps in dark place of giant salamander happiness.
Description of drawings
Fig. 1 is the utility model embodiment overall structure schematic diagram;
Fig. 2 is ecological cave structural representation in the utility model embodiment;
Fig. 3 is the A-A sectional view of Fig. 2;
Fig. 4 is the B-B sectional view of Fig. 2;
Fig. 5 is ecological microcirculation pool structure schematic diagram in the utility model embodiment;
Fig. 6 is the C-C sectional view of Fig. 5;
Wherein: 1-culturing pool body, the ecological pond of 2-, 3-drainpipe, the ecological cave of 4-, 5-observation panel, 6-aisle, the ecological microcirculation pond of 7-, 8-aeration filtration facility, 9-greenery patches, 10-top water inlet pipe, 11-bottom water inlet pipe, 12-rammed earth layer, 13-blotter, 14-C25 reinforced concrete, 15-precast concrete, 16-argillic horizon, 17-cave mouth, 18-cave wall, 19-provided pipe, 20-cover plate, 21-U type water lift pipe, 22-water inlet, 23-aeration tube.
Embodiment
By reference to the accompanying drawings the utility model is described in further detail below by embodiment.
please refer to Fig. 1~Fig. 6, the utility model embodiment giant salamander ecological culture pond, it comprises square culturing pool body 1, the middle part of described culturing pool body 1 is provided with ecological pond 2, be provided with drainpipe 3 in described ecological pond 2, surrounding and the middle part in ecological pond 2 are provided with a plurality of ecological caves 4, be provided with the cave mouth 17 that communicates with ecological pond 2 on the cave wall 18 in described ecological cave 4, the top in ecological cave 4 is provided with observation panel 5, be provided with water inlet pipe in ecological cave 4, the middle part of culturing pool body 1 is provided with aisle 6, the northeast corner of culturing pool body 1 and southwest corner are provided with ecological microcirculation pond 7, be provided with dismountable aeration filtration facility 8 in described ecological microcirculation pond 7, be provided with greenery patches 9 on another two jiaos of culturing pool body 1.
Concrete, 4 bottoms in described ecological cave are equipped with rammed earth layer 12, blotter 13, C25 reinforced concrete 14 successively, and the cave wall 18 in ecological cave 4 is the thick brick wall body of 120mm, and the top in ecological cave 4 is to lay argillic horizon 16 on precast concrete 15.
Concrete, be provided with movably cover plate 20 on described ecological microcirculation pond 7.
Preferably, the length of described culturing pool body 1 and the wide 13880mm*13880mm that is respectively, the length in described ecological cave 4 and the wide 2400mm*1240mm that is respectively, the length in described ecological microcirculation pond 7 and the wide 2520mm*2520mm that is respectively
Please refer to Fig. 1, in the utility model embodiment, the interior ecological microcirculation pond 7,4,2,40 ecological caves that is provided with altogether of culturing pool body 1; Ecological pond 2 is arranged at culturing pool body 1 middle part, arrange ecological cave 4 along 2 four limits, ecological pond, each eight ecological caves 4, every limit, ecological eight ecological caves 4 of 2 intermediate arrangement, pond, it is operating walk way that culturing pool body 1 middle part arranges an aisle cover plate 6(), ecological microcirculation pond 7, a place is respectively arranged in the northeast corner of culturing pool body 1 and southwest corner, along culturing pool body 1 surrounding, is furnished with water inlet pipe, and described water inlet pipe comprises top water inlet pipe 10 and bottom water inlet pipe 11.
Please refer to Fig. 2, Fig. 3 and Fig. 4, in the utility model embodiment, the long * in ecological cave 4 is wide is 2400mm*1240mm, and ecological cave 4 surroundings are enclosed by the thick brick wall body of 120 mm, and 4 tops, ecological cave arrange observation panel 5 in the outer part.
In the utility model embodiment, the way in ecological cave is:, with rammed earth, after rubble pad face, spread the C25 reinforced concrete at the bottom of pond, ecological cave periphery is built the 120mm brick wall body, and high 1000mm, cover precast concrete at an upper portion thereof, coats finally argillic horizon one deck.Bottom, ecological cave arranges the PVC water inlet pipe of D150, and top arranges the PPR water inlet pipe of D100.It is that 400mm, the degree of depth are the observation panel of 430mm that ecological top, cave arranges diameter, and the cave wall leaves high cave, the ecological cave mouth of 600mm.
Please refer to Fig. 5 and Fig. 6, in the utility model embodiment, the long * in ecological microcirculation pond is wide is 2520mm*2520mm, it is long that middle part, ecological microcirculation pond arranges 1590mm() * 1200mm(is wide) the aeration filtration facility, ecological both sides, microcirculation pond respectively arrange the thick brick wall body of 120mm, the U-shaped water lift pipe of D100 is installed on body of wall, and the north, ecological microcirculation pond taps into water pipe, and south, ecological microcirculation pond taps into water pipe.
In the utility model embodiment, the way in ecological microcirculation pond is:, with rammed earth, after rubble pad face, spread the C25 reinforced concrete at the bottom of pond, cover at an upper portion thereof precast concrete, coat finally argillic horizon one deck.The wide delivery port of 100mm*200mm 22 is established at middle part, and both sides arrange respectively the aeration filtration facility of width 500mm, and the outside arranges respectively the 120mm brick wall masonry, the U-shaped water lift pipe 21 of upper installation D100.
Above content is the further description of the utility model being done in conjunction with concrete embodiment, can not assert that concrete enforcement of the present utility model is confined to these explanations.For the those of ordinary skill of the technical field under the utility model, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (4)

1. giant salamander ecological culture pond, it is characterized in that: it comprises square culturing pool body, the middle part of described culturing pool body is provided with ecological pond, be provided with drainpipe in described ecological pond, surrounding and the middle part in ecological pond are provided with a plurality of ecological caves, be provided with the cave mouth that communicates with ecological pond on the cave wall in described ecological cave, the top in ecological cave is provided with observation panel, be provided with water inlet pipe in ecological cave, the middle part of culturing pool body is provided with aisle, the northeast corner of culturing pool body and southwest corner are provided with ecological microcirculation pond, described ecological microcirculation is provided with dismountable aeration filtration facility in pond, be provided with greenery patches on another two jiaos of the culturing pool body.
2. giant salamander ecological culture pond as claimed in claim 1, it is characterized in that: the bottom in described ecological cave is equipped with rammed earth layer, blotter, C25 reinforced concrete successively, the cave wall in ecological cave is the thick brick wall body of 120mm, and the top in ecological cave is to lay argillic horizon on precast concrete.
3. giant salamander ecological culture pond as claimed in claim 1, it is characterized in that: top, described ecological microcirculation pond is provided with movably cover plate.
4. as claim 1 or 2 or 3 described giant salamander ecological culture ponds, it is characterized in that: the length of described culturing pool body and the wide 13880mm*13880mm of being respectively, the length in described ecological cave and the wide 2400mm*1240mm that is respectively, the length in described ecological microcirculation pond and the wide 2520mm*2520mm that is respectively.
CN2013202860696U 2013-05-23 2013-05-23 Ecological culture pond for giant salamanders Expired - Lifetime CN203279670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202860696U CN203279670U (en) 2013-05-23 2013-05-23 Ecological culture pond for giant salamanders

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202860696U CN203279670U (en) 2013-05-23 2013-05-23 Ecological culture pond for giant salamanders

Publications (1)

Publication Number Publication Date
CN203279670U true CN203279670U (en) 2013-11-13

Family

ID=49536059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202860696U Expired - Lifetime CN203279670U (en) 2013-05-23 2013-05-23 Ecological culture pond for giant salamanders

Country Status (1)

Country Link
CN (1) CN203279670U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106069977A (en) * 2016-07-12 2016-11-09 蒙山县瑶山大鲵繁育专业合作社 Giant salamander culture unit
CN109548750A (en) * 2019-01-14 2019-04-02 贵州师范大学 A kind of wild Tylototriton ecological breeding pond for Karst region
CN114158522A (en) * 2021-12-28 2022-03-11 岳西县锐启珍鲵养殖有限公司 Imitative wild giant salamander farming systems

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106069977A (en) * 2016-07-12 2016-11-09 蒙山县瑶山大鲵繁育专业合作社 Giant salamander culture unit
CN109548750A (en) * 2019-01-14 2019-04-02 贵州师范大学 A kind of wild Tylototriton ecological breeding pond for Karst region
CN109548750B (en) * 2019-01-14 2024-04-30 贵州师范大学 Ecological breeding pool for wild verruca plana in karst region
CN114158522A (en) * 2021-12-28 2022-03-11 岳西县锐启珍鲵养殖有限公司 Imitative wild giant salamander farming systems

Similar Documents

Publication Publication Date Title
CN103739167B (en) Rain and sewage dual-purpose landscape type ecological purification system
CN202310894U (en) Circulation filtering aquatic breeding tank
CN203279670U (en) Ecological culture pond for giant salamanders
CN203015656U (en) Courtyard-style frog culture pond
CN102047856A (en) Pond and method for culturing penaeus japonicus through mulching film sand bed self-purification
CN203938558U (en) Rain, dirty dual-purpose landscape type ecological purification system
CN107232111A (en) Circulating seawer cultivating system based on warmhouse booth
CN202635350U (en) Giant salamander culture pond
CN202618037U (en) Partition plate precipitation type fish pond
CN104150582A (en) Modularized energy-saving spatial formula sewage treatment device and system thereof used for multi-floor buildings
CN103875588B (en) A kind of pond water self-circulation system of prawn fishing breeding pond and method
CN204599012U (en) A kind of Sipunculus nudus workshop culturing pool
CN203279669U (en) Ecological cave
CN208964632U (en) Artificial swamp insertion type dosing tank
CN204727877U (en) Tunnel like underground methane-generating pit
CN203482764U (en) Overwintering workshop for paa boulengeri
CN101933474B (en) Method for treating aquatic product mulch pond bubble
CN2759168Y (en) Intensive highly efficient breeding arrangement of cyclina sinensis juvenile mollusk
CN203884450U (en) Seedling cultivation pond for Litopenaeus vannamei
CN203700032U (en) Device for treating sewage by water planting root system of wetland plants
CN206089201U (en) Biological green pond device
CN203884462U (en) Artificial culture pond
CN106348461A (en) Modularized ecological utilization constructed wetland
CN207267877U (en) Organic domestic waste processing tandem tunnel methane-generating pit
CN203748469U (en) Pond water self-circulating system of intensive prawn culture pond

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131113

CX01 Expiry of patent term