CN203271747U - Shield tail sealing and grouting stopping device - Google Patents
Shield tail sealing and grouting stopping device Download PDFInfo
- Publication number
- CN203271747U CN203271747U CN 201320260862 CN201320260862U CN203271747U CN 203271747 U CN203271747 U CN 203271747U CN 201320260862 CN201320260862 CN 201320260862 CN 201320260862 U CN201320260862 U CN 201320260862U CN 203271747 U CN203271747 U CN 203271747U
- Authority
- CN
- China
- Prior art keywords
- grouting
- wire brush
- tail
- steel wire
- shield tail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a shield tail sealing and grouting stopping device. The shield tail sealing and grouting stopping device is characterized by comprising a supporting frame, a grouting stopping board and a steel wire brush, the longitudinal section of the supporting frame is a rounded rectangle with one opened end, the front end of the grouting stopping board is arranged outside the supporting frame, the tail end of the grouting stopping board is located above the horizontal plane, and the included angle formed between the tail end of the grouting stopping board and the horizontal plane is 10-90 degrees; the front end of the steel wire brush is placed inside the supporting frame, the tail end of the steel wire brush is located below the horizontal plane, the included angle formed between the tail end of the steel wire brush and the horizontal plane is 10-90 degrees, the front end of the steel wire brush is placed inside the supporting board, and the rear end of the steel wire brush retracts inwards and is suspended; the front end of the grouting stopping board, the front end of the steel wire brush and the supporting frame are connected through a connecting device. The shield tail sealing and grouting stopping device simplifies a lot of work for assembling a shield tail grouting stopping system, decreases the variety and the number of parts, saves the manufacturing cost and the constructing cost, can be welded and assembled on the circumference of a shell body of a shield tail, is not affected by deformation of the shield tail, and is high in installation accuracy, stable, reliable and long in service life.
Description
Technical field
The utility model relates to a kind of tail sealing grouting device of shield machine.
Background technology
Along with the rise of Chinese city subway construction, shield-tunneling construction affects the characteristics such as little, that driving speed is fast, ground settlement is little with it to ground and underground environment, is used more and more at home.Use shield-tunneling construction at Urban Underground, for controlling ground settlement, tail sealing grouting device is essential with the grouting device that prevents the grouting at the tail of the shield machine backflow.Existing grouting device is installed comparatively complicated, after line rivet welding welding screw in factory, more on-site the grouting device is mounted with on shield tail housing.Because the reason of shield stern construction, assembling grouting plate on the building site, required number of spare parts is huge and model is different, and cost and difficulty are all larger; Also easily distortion of shield tail and welding screw in transportation simultaneously, if the situation of distortion occurs, the installation of grouting plate is coarse, and precision is not high, and application life is shorter.
The utility model content
The utility model purpose is to provide a kind of convenient installation, and the tail sealing grouting device of saving raw material and having simultaneously sealing and grouting binomial function is to solve the problems of the technologies described above.
For achieving the above object, the utility model provides a kind of tail sealing grouting device, comprises bracing frame, grouting plate, wire brush; The support frame as described above longitudinal section is the round rectangle of an end opening; The grouting front edge of board is placed in the outside of bracing frame, and its tail end is positioned at above water, with the angle of horizontal plane be 10 to 90 degree; The wire brush front end is placed in bracing frame inside, and its tail end is positioned at below horizontal plane, with the angle of horizontal direction be 10 to 90 degree; The wire brush front end is placed in bracing frame inside, receives unsettled in the other end; The front end of described grouting plate is connected by linkage with the front end of wire brush and bracing frame.
Preferably, a side of support frame as described above is the arc-shaped side that extends along the outward opening side, and the front end of grouting plate is placed on arc-shaped side.
Preferentially, described linkage is rivet.
The utlity model has following beneficial effect: 1, the grouting plate is directly installed on bracing frame, fixedly grouting device is installed separately on shield tail housing compared to existing technology, this device has been simplified the extensive work of assembling shield tail grouting system, reduce part kind and quantity, saved manufacturing and construction cost; 2, this device can weld assembly unit on shield tail housing circumference, is not subjected to the impact of shield tail distortion, and installation accuracy is high, and is reliable and stable, long service life.3, at the shield tail of existing shield machine, only last row's tail sealing need to be replaced with the function that this device can reach tail sealing and grouting simultaneously, install simple and saved raw material.
Except purpose described above, feature and advantage, the utility model also has other purpose, feature and advantage.The below is described in further detail the utility model with reference to figure.
Description of drawings
The accompanying drawing that consists of the application's a part is used to provide further understanding of the present utility model, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not consist of improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is that the three-dimensional axle of preferred embodiment measures intention;
Fig. 2 is the sectional view of preferred embodiment;
Fig. 3 is the partial schematic diagram after the preferred embodiment installation;
Fig. 4 is the overall schematic after the preferred embodiment installation;
Fig. 5 is the work schematic diagram of preferred embodiment.
Description of symbols: 1, grouting plate; 2, bracing frame; 3, wire brush; 4, rivet; 5, shield tail housing.
The specific embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is elaborated, but the utility model can be implemented according to the multitude of different ways that claim limits and covers.
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of tail sealing grouting device comprises bracing frame 2, grouting plate 1, wire brush 3; Bracing frame 2 longitudinal sections are the round rectangle of an end opening; Grouting plate 1 front end is placed in the outside of bracing frame 2, and its tail end is positioned at above water, with the angle of horizontal plane be 10 to 90 degree; Described wire brush 3 front ends are placed in bracing frame 2 inside, and its tail end is positioned at below horizontal plane, with the angle of horizontal direction be 10 to 90 degree; Wire brush 3 front ends are placed in bracing frame 2 inside, and the other end is unsettled; The front end of grouting plate 1 is connected by linkage with front end and the bracing frame 2 of wire brush 3.
During use, bracing frame 2 is welded on the step of shield tail housing 5 reservations, this device is close to shield tail housing close-packed arrays on shield tail circumferencial direction becomes a whole circle.Under the squeezing action of tunnel inner wall, grouting plate 1 is pressed on tunnel inner wall tightly, and the wing plate of adjacent grouting plate 1 is overlapped, forms a circle sealing, has reached the purpose of sealing; Again shield body excavation zone and grouting at the tail of the shield machine zone are separated simultaneously, it is regional that the grouting at the tail of the shield machine of filling the excavation gap can not be back to shield body front portion or cutterhead excavation, reached the purpose of grouting.Grouting plate 1 is directly installed on bracing frame 2, fixedly grouting device is installed separately in compared to existing technology on shield tail housing 5, and this device has been simplified the extensive work of assembling shield tail grouting system, has reduced part kind and quantity, has saved manufacturing and construction cost; This device can weld assembly unit on shield tail housing 5 circumference, be not subjected to the impact of shield tail distortion, and installation accuracy is high, and is reliable and stable, long service life.
At the shield tail of existing shield machine, only last row's tail sealing need to be replaced with the function that this device can reach tail sealing and grouting simultaneously, install simple and saved raw material.
Further improvement as above-described embodiment, one side of bracing frame 2 is the arc-shaped side that extends along the outward opening side, the front end of grouting plate 1 is placed on arc-shaped side, and rear end bending outwardly is unsettled, and the front end of grouting plate 1 is connected by rivet 4 with front end and the bracing frame 2 of wire brush 3.
The above is only preferred embodiment of the present utility model, is not limited to the utility model, and for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (3)
1. a tail sealing grouting device, is characterized in that, comprises bracing frame, grouting plate, wire brush;
The support frame as described above longitudinal section is the round rectangle of an end opening;
Described grouting front edge of board is placed in the outside of bracing frame, and its tail end is positioned at above water, with the angle of horizontal plane be 10 to 90 degree;
Described wire brush front end is placed in bracing frame inside, and its tail end is positioned at below horizontal plane, with the angle of horizontal direction be 10 to 90 degree;
The front end of described grouting plate is connected by linkage with the front end of wire brush and bracing frame.
2. tail sealing grouting device according to claim 1, is characterized in that, a side of support frame as described above is the arc-shaped side that extends along the outward opening side, and the front end of grouting plate is placed on arc-shaped side.
3. tail sealing grouting device according to claim 1, is characterized in that, described linkage is rivet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320260862 CN203271747U (en) | 2013-05-14 | 2013-05-14 | Shield tail sealing and grouting stopping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320260862 CN203271747U (en) | 2013-05-14 | 2013-05-14 | Shield tail sealing and grouting stopping device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203271747U true CN203271747U (en) | 2013-11-06 |
Family
ID=49502185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320260862 Expired - Lifetime CN203271747U (en) | 2013-05-14 | 2013-05-14 | Shield tail sealing and grouting stopping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203271747U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104747196A (en) * | 2013-12-26 | 2015-07-01 | 江苏凯宫隧道机械有限公司 | Shield tail brush with grouting stop plate |
-
2013
- 2013-05-14 CN CN 201320260862 patent/CN203271747U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104747196A (en) * | 2013-12-26 | 2015-07-01 | 江苏凯宫隧道机械有限公司 | Shield tail brush with grouting stop plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203514659U (en) | Square roof drain structure matched with PVC drainage pipe | |
CN203271747U (en) | Shield tail sealing and grouting stopping device | |
CN205444017U (en) | Electric power construction safety protective guard | |
CN202319843U (en) | Automobile door sealing strip assembly | |
CN203668816U (en) | Safety bridge pier | |
CN205875005U (en) | That is applied to environmental engineering falls noise module | |
CN205677342U (en) | A kind of cross-arm on electric pole | |
CN204174737U (en) | A kind of Steel Structure of small-sized mobile house | |
CN204424846U (en) | Pre-fabricated electric cables ditch | |
CN204960444U (en) | Parking stall baffle easy to assemble | |
CN205153670U (en) | Solar energy communication single -pipe tower | |
CN207469895U (en) | A kind of building guardrail safeguard construction for being easily installed and dismantling | |
CN209760086U (en) | Simple and easy installation fixed way stake | |
CN108538338B (en) | Vertical protection casing structure that fills electric pile of electric automobile | |
CN209025015U (en) | A kind of median of ecological, environmental protective | |
CN203160474U (en) | Double-layer heat-insulating glass curtain wall fixed by base | |
CN202430488U (en) | Ground wire clamping trough of barrel washing machine | |
CN208955952U (en) | The improvement structure of photovoltaic support rod adapter | |
CN201354554Y (en) | Doorframe sectional material of single door sleeve wire | |
CN204716629U (en) | The fixed rack structure that a kind of submerged pump automatic coupling is installed | |
CN205210105U (en) | Vane anemograph mounting | |
CN204531211U (en) | A kind of greenhouse gutter supporting piece | |
CN104652486B (en) | A kind of diversion manhole | |
CN204185997U (en) | A kind of constructability installs the steel structure column of wallboard | |
CN209780083U (en) | handrail face pipe mounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 410100 No. 88 East 7 Line, Changsha Economic and Technological Development Zone, Hunan Province Patentee after: China Railway Construction Heavy Industry Group Co.,Ltd. Address before: 410100 Changsha Province, the city of Hunan by the East Road, No. seven, No. 88 Patentee before: China Railway Construction Heavy Industry Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131106 |