CN203668816U - Safety bridge pier - Google Patents

Safety bridge pier Download PDF

Info

Publication number
CN203668816U
CN203668816U CN201320806713.8U CN201320806713U CN203668816U CN 203668816 U CN203668816 U CN 203668816U CN 201320806713 U CN201320806713 U CN 201320806713U CN 203668816 U CN203668816 U CN 203668816U
Authority
CN
China
Prior art keywords
bridge pier
wall
water
outer sleeve
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320806713.8U
Other languages
Chinese (zh)
Inventor
吴红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320806713.8U priority Critical patent/CN203668816U/en
Application granted granted Critical
Publication of CN203668816U publication Critical patent/CN203668816U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a safety bridge pier. The safety bridge pier comprises a bridge pier body, the bridge pier body sequentially comprises a semicircular water facing wall, a first planar wall, a semicircular water backing wall and a second planar wall in the circumferential direction, the bridge pier body is sleeved with a protector, and protection gap is formed between the protector and the bridge pier body. The protector comprises a front protection part arranged outside the water facing wall in a sleeved mode, a middle protection segment arranged on the outer side of the first planar wall and the outer side of the second planar wall and a rear protection part arranged outside the water backing wall in a sleeved mode, the position, making contact with the middle protection segment, of the front protection part and the position, making contact with the middle protection segment, of the rear protection part are respectively provided with a protruding edge, the protruding edges are fixedly connected with the middle protection segment through bolts, and the cross section in the vertical direction of the middle protection segment is wavelike. The safety bridge pier further comprises a water guiding body, the water guiding body comprises an outer sleeve body arranged outside the front protection part in a sleeved mode and a fixing column arranged between the front protection part and the outer sleeve body, an arc-shaped protruding part is arranged on the periphery of the outer sleeve body, the flow direction of water is changed by the water guiding body, so that impacting force of water flow on the side face of the bridge pier body is reduced, and the safety bridge pier is convenient to maintain.

Description

Safe bridge pier
Technical field
The utility model relates to building field, especially relates to a kind of safe bridge pier.
Background technology
Bridge pier comprises pier shaft and abutment body, pier shaft and abutment body be supporting bridge across agent structure, not only bear the whole load that bridge span structure transmits, but also directly bear the multiple loads such as soil pressure, water flow impact pressure, ice pressure, ship impact force, so pier shaft and abutment body all have enough intensity, rigidity and stability.
At present many for strengthening the stability of bridge pier and the device of rigidity, but its impact resistance and impact resistance can not take into account, ship knocks bridge pier conventionally, ship and bridge pier all can have very large damage, have increased maintenance cost; In the time of Flooding, the protective device of bridge is easily broken by hard thing, has reduced result of use; The water impact of the side of bridge pier is large, impacts for a long time bridge pier side, easily bridge pier stability is impacted; and the protective device of bridge adopts welding manner to install conventionally, and installing/dismounting difficulty, when maintenance; need to destroy whole protective device, maintenance cost is high.
Utility model content
The utility model, in order to overcome the deficiencies in the prior art, provides the shock resistance of a kind of side and collision performance good, maintenance safe bridge pier easily.
To achieve these goals, the utility model is by the following technical solutions: a kind of safe bridge pier, comprise bridge pier, bridge pier is along circumferentially comprising successively the semicircular wall that meets water, the first planar wall, semicircular backwater wall and the second planar wall, the outer cover of described bridge pier is provided with protective, forms protection gap between this protective and bridge pier; Protective comprises the front protection portion that meets water outside wall of being sheathed on, be located at the first planar wall and the second planar wall outside in the middle of protection section and be sheathed on the rear protection portion outside backwater wall, described front protection portion and rear protection portion and a middle protection section contact position are equipped with chimb, this chimb is fixedly connected with middle protection section by bolt, and middle protection section cross section is vertically waveform; Also comprise diversion body, diversion body comprises and is sheathed on the outer sleeve body outside front protection portion and is located at the fixed leg between front protection portion and outer sleeve body, and outer sleeve body is arranged with the protuberance of arc outward.
As preferably, described fixed leg is one, and fixed leg comprises the rear wall contacting with antetheca contact in the middle of outer sleeve body inwall with described front protection portion's outer wall centre.
In sum, the utlity model has following advantage: this setting, in the time having ship or other hard things to knock bridge pier, has reduced the damage of ship and bridge pier, has reduced maintenance cost, has increased safety; The in the situation that of Flooding; can avoid the hard thing coming with flood to destroy bridge pier; bridge pier side arranges corrugated middle protection section; this arranges the flow direction that has changed water; reduce the impact force of current to bridge pier side; can not impact the stability of bridge pier; and the protective device of bridge is installed by bolt; easy installation and removal, is conducive to maintenance, in the time that damaging appears in protective device; can change for the parts that damage; thereby reinforcement result of use, without whole protective device is changed, has saved cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
In order to make those skilled in the art person better understand the utility model scheme, below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out to clear, complete description.
As shown in Figure 1, a kind of safe bridge pier, comprises bridge pier 1, and bridge pier 1 is along circumferentially comprising successively semicircular wall 11, the first planar wall 13, semicircular backwater wall 12 and the second planar wall 14 of meeting water, the outer cover of described bridge pier 1 is provided with protective 2, forms protection gap between this protective 2 and bridge pier 1; This setting is in the time having ship or other hard things to knock bridge pier, can reduce the damage of ship and bridge pier, reduce maintenance cost, the in the situation that of Flooding, reduce to a great extent the damage of current to bridge pier, can avoid the hard thing coming with flood to destroy bridge pier, extend the application life of bridge pier, improved safety simultaneously.
Protective 2 comprises the front protection portion 21 that meets water outside wall 11 of being sheathed on, be located at the first planar wall 13 and the second planar wall 14 outsides in the middle of protection section 22 and be sheathed on the rear protection portion 23 outside backwater wall 12, described front protection portion 21 and rear protection portion 23 and middle protection section 22 contact positions are equipped with chimb, described chimb is fixedly connected with middle protection section 22 by bolt, and middle protection section 22 cross section is vertically waveform; Bridge pier side arranges corrugated middle protection section; this arranges the flow direction that has changed water, has reduced the impact force of current to bridge pier side, can not impact the stability of bridge pier; and the protective device of bridge is installed by bolt; easy installation and removal, is conducive to maintenance, in the time that damaging appears in protective device; can change for the parts that damage; thereby reinforcement result of use, without whole protective device is changed, has saved cost.
Also comprise diversion body 3, diversion body 3 comprises and is sheathed on the outer sleeve body 31 outside front protection portion 21 and is located at the fixed leg 32 between front protection portion 21 and outer sleeve body 31, the outer protuberance that is arranged with arc of outer sleeve body 31; Described fixed leg 32 is made up of concrete, this setting can be carried out drainage to the water of bridge pier both sides, avoid the water of bridge pier both sides to impact bridge pier, reduce the damage of bridge pier both sides, strengthened the anti-collision performance of bridge pier side simultaneously, further improve safety, extended the application life of bridge pier.
Further; described fixed leg 32 is one; fixed leg 32 comprises the antetheca that contact in the middle of inwalls with outer sleeve body 31 and the rear wall contacting with described front protection portion 21 outer walls centres; the fixed leg of this setting has been strengthened the impact resistance of diversion body and bridge pier; avoid hard thing to clash into outer sleeve body simultaneously and cause outer sleeve body distortion, affected diversion effect.
Obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtaining under creative work prerequisite, all should belong to the scope of the utility model protection.

Claims (2)

1. a safe bridge pier, comprise bridge pier (1), bridge pier (1) is along circumferentially comprising successively the semicircular wall that meets water (11), the first planar wall (13), semicircular backwater wall (12) and the second planar wall (14), it is characterized in that: the outer cover of described bridge pier (1) is provided with protective (2), between this protective (2) and bridge pier (1), form protection gap; Protective (2) comprise be sheathed on the outer front protection portion (21) of the wall that meets water (11), be located at the first planar wall (13) and the second planar wall (14) outside in the middle of protection section (22) and be sheathed on the rear protection portion (23) outside backwater wall (12), described front protection portion (21) and rear protection portion (23) are equipped with chimb with middle protection section (22) contact position, this chimb is fixedly connected with middle protection section (22) by bolt, and middle protection section (22) cross section is vertically waveform; Also comprise diversion body (3); diversion body (3) comprise be sheathed on the outer outer sleeve body (31) of front protection portion (21) and be located at front protection portion (21) and outer sleeve body (31) between fixed leg (32), outer sleeve body (31) is arranged with the protuberance of arc outward.
2. safe bridge pier according to claim 1; it is characterized in that: described fixed leg (32) is one, fixed leg (32) comprises the antetheca contacting with outer sleeve body (31) inwall centre and the rear wall contacting with described front protection portion (21) outer wall centre.
CN201320806713.8U 2013-11-29 2013-11-29 Safety bridge pier Expired - Fee Related CN203668816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320806713.8U CN203668816U (en) 2013-11-29 2013-11-29 Safety bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320806713.8U CN203668816U (en) 2013-11-29 2013-11-29 Safety bridge pier

Publications (1)

Publication Number Publication Date
CN203668816U true CN203668816U (en) 2014-06-25

Family

ID=50965132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320806713.8U Expired - Fee Related CN203668816U (en) 2013-11-29 2013-11-29 Safety bridge pier

Country Status (1)

Country Link
CN (1) CN203668816U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306680A (en) * 2018-11-20 2019-02-05 庆元县古韵廊桥研究所 A kind of construction method for the anti-wave bridge pier of the wooden shelter bridge
CN115323907A (en) * 2022-09-20 2022-11-11 西南交通大学 Wave eliminating device for bridge pier

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306680A (en) * 2018-11-20 2019-02-05 庆元县古韵廊桥研究所 A kind of construction method for the anti-wave bridge pier of the wooden shelter bridge
CN109306680B (en) * 2018-11-20 2020-09-22 浙江鑫直建筑有限公司 Construction method for wave-proof bridge pier of gallery bridge
CN115323907A (en) * 2022-09-20 2022-11-11 西南交通大学 Wave eliminating device for bridge pier

Similar Documents

Publication Publication Date Title
CN204959685U (en) Arc flood control device
CN203668816U (en) Safety bridge pier
CN203782545U (en) Reinforced concrete bridge pier
CN205116938U (en) Building construction site security rail guard
CN202031016U (en) Bridge pier of bridge
CN204282851U (en) The protective guard that a kind of building operations is provisional
CN202099784U (en) Truss structure energy-absorbing type anti-ship-collision device for bridge
CN203050203U (en) Chain-loosening detecting device used for stereo garage
CN105019381A (en) Electric pole anti-collision protection pile
CN106088773B (en) A kind of electric power facility protector
CN105196946A (en) Durable chassis protection plate
CN209114324U (en) A kind of road and bridge protective fence
CN205477648U (en) Prevention of seepage water shield tunnel section of jurisdiction
CN211498769U (en) Down-the-hole arc door bottom water seal device arranged on overflow weir
CN207405509U (en) A kind of town road deceleration strip
CN201428275Y (en) Steel protective mesh
CN202243827U (en) Bicycle tire protector
CN204803922U (en) Assembled safety well lid of preventing burglary
CN206486805U (en) A kind of shallow embedding formula expanded joint structure
CN203334220U (en) Motorway protective guard
CN203668817U (en) Durable bridge pier
CN110258531B (en) Prefabricated press-in type underground continuous wall and construction method thereof
CN207891792U (en) One kind setting line bar crash bearer with dissection
CN204527078U (en) Protective device before a kind of service machine
CN205501958U (en) Power station forebay water inlet protective structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20171129

CF01 Termination of patent right due to non-payment of annual fee