CN207469895U - A kind of building guardrail safeguard construction for being easily installed and dismantling - Google Patents

A kind of building guardrail safeguard construction for being easily installed and dismantling Download PDF

Info

Publication number
CN207469895U
CN207469895U CN201721378884.XU CN201721378884U CN207469895U CN 207469895 U CN207469895 U CN 207469895U CN 201721378884 U CN201721378884 U CN 201721378884U CN 207469895 U CN207469895 U CN 207469895U
Authority
CN
China
Prior art keywords
connector
column
easily installed
card buckle
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721378884.XU
Other languages
Chinese (zh)
Inventor
朱汉振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingg Construction Of Ltd By Share Ltd In Shenzhen
Original Assignee
Jingg Construction Of Ltd By Share Ltd In Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingg Construction Of Ltd By Share Ltd In Shenzhen filed Critical Jingg Construction Of Ltd By Share Ltd In Shenzhen
Priority to CN201721378884.XU priority Critical patent/CN207469895U/en
Application granted granted Critical
Publication of CN207469895U publication Critical patent/CN207469895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of building guardrail safeguard constructions for being easily installed and dismantling, including main body and cross tube, the lower end of main body is fixed with sheer pole, the centre position of cross tube and sheer pole is interspersed with more montants, and the centre position of montant is connected with billboard, and the both sides of sheer pole are welded with column, there are two screw holes for the surface embedded type connection of column, the inside of screw hole is interspersed with fixing bolt, and the front and rear sides of column are connected with fixed card buckle, and one end of fixed card buckle is fixed with the first connector.First connector is connected with the second connector by moving screw perforation, it can be adjusted according to practice of construction such as landform and random adjustment is made to the shape of guardrail corral, the steering of guardrail can be realized by the connection orientation of moving screw the first connector of rotation and the second connector, achievable corral goes out the purpose of guardrail entirety of different shapes, production and use suitable for the building guardrail safeguard construction for being easily installed and dismantling have good development prospect.

Description

A kind of building guardrail safeguard construction for being easily installed and dismantling
Technical field
The utility model is related to building guardrail technical field, specially a kind of building guardrail safety for being easily installed and dismantling Structure.
Background technology
The column of guardrail is by expansion bolt or pre-buried is fixed with ground.It is usually mounted to such as logistics corridor both sides, life Is produced from equipment periphery, builds corner, the both sides and load bed edge of door etc..Guardrail is mainly used for road, factory, cell, villa, front yard To the protection of equipment and facilities and protection in the occasions such as institute, shopping centre, public place.Guardrail is visible everywhere in we live.
A kind of existing building guardrail connection mode is welding, is not easy to dismounting and is replaced with repair, and is functional poor, leads to Cross expansion bolt or it is pre-buried fixed with ground, stability is poor.
Utility model content
The purpose of this utility model is to provide a kind of building guardrail safeguard construction for being easily installed and dismantling, in solution It states and a kind of existing building guardrail connection mode is proposed in background technology as welding, be not easy to dismounting and replaced, and function with repair Property is poor, by expansion bolt or it is pre-buried fixed with ground, the problem of stability is poor.
To achieve the above object, the utility model provides following technical solution:A kind of building shield for being easily installed and dismantling Column safeguard construction, including main body and cross tube, the lower end of the main body is fixed with sheer pole, in the cross tube and sheer pole Between position be interspersed with more montants, the centre position of the montant is connected with billboard, and the both sides of the sheer pole are welded with Column, there are two screw holes for the surface embedded type connection of the column, and the inside of the screw hole is interspersed with fixing bolt, the column Front and rear sides be connected with fixed card buckle, one end of the fixed card buckle is fixed with the first connector, the end of the fixing bolt End surfaces are sheathed with the first nut, and rubber pad is fitted between first nut and the fixed card buckle, and described first connects The second connector is connected on the right side of fitting, the inside of second connector is interspersed with moving screw, the moving screw End surface is sheathed with the second nut, and the lower end of the column is fixed with pedestal, and the bottom surface of the pedestal is welded with pile.
Preferably, the column is closely welded with the pile by the pedestal, and the cross-sectional area of the pedestal is more than The cross-sectional area of the pile.
Preferably, first connector and second connector are mutually blocked with the column by the fixed card buckle It connects, the fixed card buckle is interted with the fixing bolt to be connect.
Preferably, first connector is mutually clamped with second connector, and the moving screw connects with described second Fitting interts connection, and second nut is flexibly connected with the moving screw screw thread.
Preferably, the bottom end of the fixing bolt is connect with first nut thread, and the first nut and the fixation It is fixedly connected between buckle by rubber pad.
Preferably, the cross tube is fixedly connected with the sheer pole by the montant, and montant is equipped with more, described Billboard is fixedly connected with the montant.
Compared with prior art, the beneficial effects of the utility model are:The building guardrail peace that this kind is easily installed and dismantles Full structure is equipped with pile and pedestal, and column is closely welded with pile by pedestal, and the cross-sectional area of pedestal is more than the transversal of pile Area, a kind of existing building guardrail by expansion bolt or it is pre-buried fixed with ground, stability is poor, this kind is easily installed And dismounting building guardrail safeguard construction installation when, column squeezes into ground by pile, it is ensured that its stability, by violent External force collision also can effectively be kept out, and the pedestal above pile can prevent column ground reduction guardrail height up to one's neck in, improve The stability of building guardrail safeguard construction that this kind is easily installed and dismantles, the first connector and the second connector lead to column Fixed card buckle to be crossed mutually to be clamped, fixed card buckle is interted with fixing bolt to be connect, and a kind of existing building guardrail connection mode is welding, It is not easy to dismounting to replace with repair, the first connector of the building guardrail safeguard construction that this kind is easily installed and dismantles and second connects Fitting can be disassembled from leg surface, only need to be by fixing bolt by screw hole after the first connector and the damage of the second connector Middle extraction, and then dismounting is separately can be completed into, and then directly replaces lossless first connector and second in fixed card buckle and column Connector, improves flexibility and the convenience of the building guardrail safeguard construction that this kind is easily installed and dismantles, and when replacing without The complete dismounting and change of integrated member need to more be saved time and cost compared to the more existing guardrail component being welded to connect, the A connection piece is mutually clamped with the second connector, and moving screw interts with the second connector to be connect, the second nut and moving screw spiral shell Line is flexibly connected, the two of building guardrail safeguard construction guardrail components that this kind is easily installed and dismantle by the first connector and The clamping of second connector and be connected as one, the first connector and the second connector are connected by moving screw perforation, can Random adjustment is made to the shape of guardrail corral according to the adjusting of the practice of construction such as landform, the first connector is rotated by moving screw The steering of guardrail can be realized with the connection orientation of the second connector, it can be achieved that corral goes out the mesh of guardrail entirety of different shapes , the bottom end of fixing bolt is connect with the first nut thread, and is fixed and connected by rubber pad between the first nut and fixed card buckle It connects, the effect of rubber pad is to cause to wear to prevent from being in direct contact between fixing bolt and fixed card buckle, improves this kind and is convenient for Installation and the building guardrail safeguard construction durability of dismounting, make its service life longer, cross tube is consolidated with sheer pole by montant Fixed connection, and montant is equipped with more, billboard is fixedly connected with montant, in billboard can fixation of advertisement, it is functional to improve its.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the first connector of the utility model and the second connector overlooking the structure diagram;
Fig. 3 is the utility model pillar construction schematic diagram.
In figure:1st, main body, 2, cross tube, 3, montant, the 4, first connector, 5, fixing bolt, 6, column, 601, screw hole, 602nd, pedestal, 603, pile, the 7, second connector, 8, billboard, the 9, first nut, 10, rubber pad, 11, fixed card buckle, 12, Moving screw, the 13, second nut, 14, sheer pole.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 3, the utility model provides a kind of technical solution:A kind of building guardrail for being easily installed and dismantling Safeguard construction, including main body 1, cross tube 2, montant 3, the first connector 4, fixing bolt 5, column 6, screw hole 601, pedestal 602, Pile 603, the second connector 7, billboard 8, the first nut 9, rubber pad 10, fixed card buckle 11, moving screw 12, the second nut 13 and sheer pole 14, the lower end of main body 1 is fixed with sheer pole 14, and cross tube 2 and the centre position of sheer pole 14 are interspersed with more Montant 3, the centre position of montant 3 are connected with billboard 8, in billboard 8 can fixation of advertisement, improve its functionality, sheer pole 14 Both sides be welded with column 6, there are two screw hole 601, the inside of screw hole 601 is interspersed with solid for the surface embedded type connection of column 6 Determine bolt 5, the front and rear sides of column 6 are connected with fixed card buckle 11, and one end of fixed card buckle 11 is fixed with the first connector 4, Gu The end surface for determining bolt 5 is sheathed with the first nut 9, and a kind of existing building guardrail connection mode is welding, is not easy to dismantle It is replaced with repair, the first connector 4 and the second connector 7 of the building guardrail safeguard construction that this kind is easily installed and dismantles It is disassembled from 6 surface of column, it, only need to will be in screw hole 601 by fixing bolt 5 after the first connector 4 and the damage of the second connector 7 Extraction, and then dismounting is separately can be completed into fixed card buckle 11 and column 6, so directly replace the first lossless connector 4 and Second connector 7 improves flexibility and the convenience of the building guardrail safeguard construction that this kind is easily installed and dismantles, and replaces Shi Wuxu by the complete dismounting and change of integrated member, compared to the more existing guardrail component being welded to connect more save the time with into This, is fitted with rubber pad 10, the effect of rubber pad 10 is to prevent fixing bolt 5 between the first nut 9 and fixed card buckle 11 It is in direct contact between fixed card buckle 11 and causes to wear, it is resistance to improve the building guardrail safeguard construction that this kind is easily installed and dismantles Long property makes its service life longer, and the right side of the first connector 4 is connected with the second connector 7, what this kind was easily installed and dismantled Two guardrail components of building guardrail safeguard construction are connected as one by the clamping of the first connector 4 and the second connector 7, First connector 4 is connected with the second connector 7 by the perforation of moving screw 12, can be adjusted according to practice of construction such as landform to shield The shape of column corral makes random adjustment, is by first connection 4 of the rotation of moving screw 12 and the connection orientation of the second connector 7 The steering of guardrail can be achieved, it can be achieved that corral goes out the purpose of guardrail entirety of different shapes, the inside of the second connector 7 is interspersed with Moving screw 12, the end surface of moving screw 12 are sheathed with the second nut 13, and the lower end of column 6 is fixed with pedestal 602, pedestal 602 bottom surface is welded with pile 603, a kind of existing building guardrail by expansion bolt or it is pre-buried fixed with ground, consolidate Property is poor, and during the installation of building guardrail safeguard construction that this kind is easily installed and dismantles, column 6 squeezes into ground by pile 603, It can ensure its stability, also can effectively be kept out by violent external force collision, and the pedestal 602 of 603 top of pile can prevent column 6 Ground reduces guardrail height up to one's neck in, improves the stability of building guardrail safeguard construction that this kind is easily installed and dismantles.
Operation principle:It, should be first to device master before the building guardrail safeguard construction that this kind is used to be easily installed and is dismantled The structure of body 1 does simple understanding, and during installation, column 6 squeezes into ground by pile 603, it is ensured that its stability, by violent External force collision also can effectively be kept out, and the pedestal 602 of 603 top of pile can prevent the ground reduction guardrail height up to one's neck in of column 6, The second connector 7 of the first connector 4 and another guardrail is clamped later, is fixed by moving screw 12, it can be according to landform Etc. practice of construction adjusting random adjustment is made to the shape of guardrail corral, pass through moving screw 12 rotation first connection 4 and second The steering of guardrail can be realized for the connection orientation of connector 7, it can be achieved that corral goes out the purpose of guardrail entirety of different shapes, and first 4 and second connector 7 of connector damage after, only fixing bolt 5 need to will be extracted out in screw hole 601, and then by fixed card buckle 11 with Dismounting separately can be completed in column 6, and then directly replaces lossless the first connector 4 and the second connector 7, the work of rubber pad 10 With being to cause to wear to prevent from being in direct contact between fixing bolt 5 and fixed card buckle 11, improve its durability, more than be exactly this reality With novel entire operation principle.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building guardrail safeguard construction for being easily installed and dismantling, including main body(1)With cross tube(2), it is characterised in that: The main body(1)Lower end be fixed with sheer pole(14), the cross tube(2)With sheer pole(14)Centre position be interspersed with it is more Root montant(3), the montant(3)Centre position be connected with billboard(8), the sheer pole(14)Both sides be welded with it is vertical Column(6), the column(6)Surface embedded type connection there are two screw hole(601), the screw hole(601)Inside be interspersed with it is solid Determine bolt(5), the column(6)Front and rear sides be connected with fixed card buckle(11), the fixed card buckle(11)One end fix There is the first connector(4), the fixing bolt(5)End surface be sheathed with the first nut(9), first nut(9)With The fixed card buckle(11)Between be fitted with rubber pad(10), first connector(4)Right side be connected with the second connection Part(7), second connector(7)Inside be interspersed with moving screw(12), the moving screw(12)End surface set Conjunction has the second nut(13), the column(6)Lower end be fixed with pedestal(602), the pedestal(602)Bottom surface be welded with stake Column(603).
2. a kind of building guardrail safeguard construction for being easily installed and dismantling according to claim 1, it is characterised in that:It is described Column(6)With the pile(603)Pass through the pedestal(602)Close welding, the pedestal(602)Cross-sectional area be more than institute State pile(603)Cross-sectional area.
3. a kind of building guardrail safeguard construction for being easily installed and dismantling according to claim 1, it is characterised in that:It is described First connector(4)With second connector(7)With the column(6)Pass through the fixed card buckle(11)It is mutually clamped, institute State fixed card buckle(11)With the fixing bolt(5)Interspersed connection.
4. a kind of building guardrail safeguard construction for being easily installed and dismantling according to claim 1, it is characterised in that:It is described First connector(4)With second connector(7)It is mutually clamped, the moving screw(12)With second connector(7)It wears Insert connection, second nut(13)With the moving screw(12)Screw thread is flexibly connected.
5. a kind of building guardrail safeguard construction for being easily installed and dismantling according to claim 1, it is characterised in that:It is described Fixing bolt(5)Bottom end and first nut(9)It is threadedly coupled, and the first nut(9)With the fixed card buckle(11)It Between pass through rubber pad(10)It is fixedly connected.
6. a kind of building guardrail safeguard construction for being easily installed and dismantling according to claim 1, it is characterised in that:It is described Cross tube(2)With the sheer pole(14)Pass through the montant(3)It is fixedly connected, and montant(3)Equipped with more, the billboard (8)With the montant(3)It is fixedly connected.
CN201721378884.XU 2017-10-24 2017-10-24 A kind of building guardrail safeguard construction for being easily installed and dismantling Active CN207469895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721378884.XU CN207469895U (en) 2017-10-24 2017-10-24 A kind of building guardrail safeguard construction for being easily installed and dismantling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721378884.XU CN207469895U (en) 2017-10-24 2017-10-24 A kind of building guardrail safeguard construction for being easily installed and dismantling

Publications (1)

Publication Number Publication Date
CN207469895U true CN207469895U (en) 2018-06-08

Family

ID=62264659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721378884.XU Active CN207469895U (en) 2017-10-24 2017-10-24 A kind of building guardrail safeguard construction for being easily installed and dismantling

Country Status (1)

Country Link
CN (1) CN207469895U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339567A (en) * 2018-10-19 2019-02-15 钱辉 A kind of gardening guardrail with alarm function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339567A (en) * 2018-10-19 2019-02-15 钱辉 A kind of gardening guardrail with alarm function

Similar Documents

Publication Publication Date Title
CN207469895U (en) A kind of building guardrail safeguard construction for being easily installed and dismantling
CN104989017A (en) Impact resistance waterproof back-bolt type stone curtain wall
CN204930961U (en) A kind of outdoor wooden bench
CN207080023U (en) A kind of construction safety column of installation easy to disassemble
CN208202800U (en) A kind of compound guardrail of multilayer proofing
CN201671335U (en) Plastic casing and building formwork
CN207892275U (en) A kind of adjustable for height strut
CN205382762U (en) Hexagonal fence flexible connectors
CN203654207U (en) Sound barrier convenient to maintain
CN207598004U (en) A kind of construction protective fence
CN208340059U (en) A kind of football training obstacle bar
CN208441379U (en) A kind of building field balcony guardrail
CN207420215U (en) The connector of protective fence
CN207296589U (en) A kind of municipal works protection network
CN101871272A (en) Building method of earthquake-resistant house and integral terrace house
CN202863474U (en) Car limit gauge
CN214271834U (en) A buffer stop for traffic engineering
CN210798478U (en) Fence for hydraulic engineering
CN205162342U (en) Table tennis table
CN208884875U (en) A kind of interior divider reinforcing connection structure
CN207347890U (en) A kind of road roller baffle device for water
CN211114927U (en) Special guardrail of civil engineering
CN204739379U (en) Terminal advertising screen supporting seat
CN203741750U (en) Movable inserting and pulling type guard railing
CN203257115U (en) Tool-type welding steel pipe border protection frame fixing piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant