CN203270465U - Hydraulic pre-compression construction device for cantilever suspension basket - Google Patents

Hydraulic pre-compression construction device for cantilever suspension basket Download PDF

Info

Publication number
CN203270465U
CN203270465U CN 201320309361 CN201320309361U CN203270465U CN 203270465 U CN203270465 U CN 203270465U CN 201320309361 CN201320309361 CN 201320309361 CN 201320309361 U CN201320309361 U CN 201320309361U CN 203270465 U CN203270465 U CN 203270465U
Authority
CN
China
Prior art keywords
connects
box girder
girder body
suspension rod
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320309361
Other languages
Chinese (zh)
Inventor
吴宗玺
张国强
周大鹏
李贵清
王新宇
腾景梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NO6 ENGINEERING Co Ltd OF HEILONGJIANG LONGJIAN ROAD & BRIDGE Co Ltd
Original Assignee
NO6 ENGINEERING Co Ltd OF HEILONGJIANG LONGJIAN ROAD & BRIDGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NO6 ENGINEERING Co Ltd OF HEILONGJIANG LONGJIAN ROAD & BRIDGE Co Ltd filed Critical NO6 ENGINEERING Co Ltd OF HEILONGJIANG LONGJIAN ROAD & BRIDGE Co Ltd
Priority to CN 201320309361 priority Critical patent/CN203270465U/en
Application granted granted Critical
Publication of CN203270465U publication Critical patent/CN203270465U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Provided is a hydraulic pre-compression construction device for a cantilever suspension basket. A variable-cross-section prestressed concrete continuous box girder and a continuous steel member bridge are large in span and advanced in construction process so as to be widely applied to highway engineering and railroad engineering. The hydraulic pre-compression construction device for a cantilever suspension basket comprises a supporting seat (1). A box girder body (2) is arranged at the upper portion of the supporting seat, the box girder body is connected with the suspension basket (3), and the suspension basket is connected with a bottom mould (5) through a lifting rod (4). The hydraulic pre-compression construction device is applied to construction of large-span continuous box girders.

Description

Suspended casting suspended basket hydraulic pressure precompressed construction equipment
Technical field
The utility model relates to a kind of suspended casting suspended basket hydraulic pressure precompressed construction equipment
Background technology
Variable cross-section prestressed concrete continuous box girder and continuous steel frame bridge are because it is large across the footpath, the ripe wide model employing in highway engineering, railway engineering of construction technology.The type bridge superstructure generally adopts Hanging Basket cantilever method construction, namely at first adopts floor stand method construction initial period, assembly unit Hanging Basket thereon then, and the block-by-block symmetry is built case beam piece spare, closes up in order at last, forms continuous system
Summary of the invention
The purpose of this utility model is to provide a kind of suspended casting suspended basket hydraulic pressure precompressed construction equipment applied widely, simple in structure.
Described purpose is achieved by the following scheme:
A kind of suspended casting suspended basket hydraulic pressure precompressed construction equipment, its composition comprises: bearing, described bearing top are equipped with box girder body, and described box girder body connects Hanging Basket, and described Hanging Basket connects bed die by suspension rod.
Described suspended casting suspended basket hydraulic pressure precompressed construction equipment, described box girder body and described suspension rod are equipped with support, described support comprises pull bar, described pull bar connects oblique fulcrum bar and depression bar, described pole connects described depression bar, and described pull bar one end connects described box girder body, and the described pull bar other end connects described suspension rod, described depression bar one end connects described box girder body, and the described depression bar other end connects described suspension rod.
Described suspended casting suspended basket hydraulic pressure precompressed construction equipment is equipped with oil pump in described box girder body, and described pull bar connects distribution beam, and described distribution beam connecting fluid force feed is pushed up, described hydraulic oil top connection bed die.
Described transport vehicle with adjustable space function, described Hanging Basket comprises lower balancing pole, the hinged left brace of described lower balancing pole, right brace and pole, described left brace, described right brace, described pole be hinged upper balancing pole all, described upper balancing pole connects suspension rod, and described lower balancing pole connects described footstock.
The beneficial effects of the utility model are:
The utility model is used for greatly across the precompressed construction of the large-tonnage suspended casting suspended basket of footpath Construction of Continuous Box Beam and can't realizes the Hanging Basket precompressed construction of preloading, and construction effect is good, speed is fast.
The Hanging Basket good balance effect that the utility model adopts, hydraulic oil pushes up the distance that can be good at adjusting between distribution beam and bed die.
Description of drawings
Accompanying drawing 1 is structural representation of the present utility model.
The specific embodiment
Elaborate the utility model preferred embodiment below in conjunction with accompanying drawing.
Embodiment one
A kind of suspended casting suspended basket hydraulic pressure precompressed construction equipment, its composition comprises: bearing 1, described bearing top are equipped with box girder body 2, and described box girder body connects Hanging Basket 3, and described Hanging Basket connects bed dies 5 by suspension rod 4.
The key of Hanging Basket cantilever method construction is Hanging Basket, the precompressed of the Hanging Basket construction sequence that is absolutely necessary, the purpose of Hanging Basket precompressed is mainly the reliability of checking Hanging Basket and eliminates its nonelastic deformation, measures simultaneously the practical distortion value of Hanging Basket under different loads, in order to revise the formwork erection height.
Embodiment two
The difference of the present embodiment and embodiment one is, as shown in Figure 1, described suspended casting suspended basket hydraulic pressure precompressed construction equipment, described box girder body and described suspension rod are equipped with support, and described support comprises pull bar 6, described pull bar connects oblique fulcrum bar 7 and depression bar 8, described pole connects described depression bar, and described pull bar one end connects described box girder body, and the described pull bar other end connects described suspension rod, described depression bar one end connects described box girder body, and the described depression bar other end connects described suspension rod.
Embodiment three
The difference of the present embodiment and embodiment two is, as shown in Figure 1, and described suspended casting suspended basket hydraulic pressure precompressed construction equipment, oil pump 9 is housed in described box girder body, described pull bar connects distribution beam 10, and described distribution beam connecting fluid force feed pushes up 11, described hydraulic oil top connection bed die.
Embodiment four
The difference of the present embodiment and embodiment one is, as shown in Figure 1, described transport vehicle with adjustable space function, described Hanging Basket comprises lower balancing pole 12, the hinged left brace 13 of described lower balancing pole, right brace 14 and pole 15, described left brace, described right brace, described pole be hinged upper balancing pole 17 all, and described upper balancing pole connects suspension rod, and described lower balancing pole connects described footstock 16.
Present embodiment is the exemplary illustration of this patent not to be limited its protection domain; those skilled in the art can also carry out the part to it and change; as long as no the Spirit Essence that exceeds this patent, all be considered as the replacement that is equal to this patent, all within the protection domain of this patent

Claims (4)

1. A kind of suspended casting suspended basket hydraulic pressure precompressed construction equipment, its composition comprises: bearing, it is characterized in that described bearing top is equipped with box girder body, described box girder body connects footstock, and described footstock connects Hanging Basket, and described Hanging Basket connects bed die by suspension rod.
2. Suspended casting suspended basket hydraulic pressure precompressed construction equipment according to claim 1, it is characterized in that described box girder body and described suspension rod are equipped with support, described support comprises pull bar, described pull bar connects oblique fulcrum bar and depression bar, described pole connects described depression bar, and described pull bar one end connects described box girder body, and the described pull bar other end connects described suspension rod, described depression bar one end connects described box girder body, and the described depression bar other end connects described suspension rod.
3. Suspended casting suspended basket hydraulic pressure precompressed construction equipment according to claim 2 is characterized in that in described box girder body, oil pump being housed, and described pull bar connects distribution beam, and described distribution beam connecting fluid force feed is pushed up, described hydraulic oil top connection bed die.
4. Transport vehicle with adjustable space function according to claim 1, it is characterized in that described Hanging Basket comprises lower balancing pole, the hinged left brace of described lower balancing pole, right brace and pole, described left brace, described right brace, described pole be hinged upper balancing pole all, described upper balancing pole connects suspension rod, and described lower balancing pole connects described footstock
CN 201320309361 2013-05-31 2013-05-31 Hydraulic pre-compression construction device for cantilever suspension basket Expired - Fee Related CN203270465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320309361 CN203270465U (en) 2013-05-31 2013-05-31 Hydraulic pre-compression construction device for cantilever suspension basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320309361 CN203270465U (en) 2013-05-31 2013-05-31 Hydraulic pre-compression construction device for cantilever suspension basket

Publications (1)

Publication Number Publication Date
CN203270465U true CN203270465U (en) 2013-11-06

Family

ID=49500906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320309361 Expired - Fee Related CN203270465U (en) 2013-05-31 2013-05-31 Hydraulic pre-compression construction device for cantilever suspension basket

Country Status (1)

Country Link
CN (1) CN203270465U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631341A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Novel hanging basket prepressing system and detecting method thereof
CN105088970A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Construction method of corrugated steel web PC box girder cable-stayed bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631341A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Novel hanging basket prepressing system and detecting method thereof
CN105088970A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Construction method of corrugated steel web PC box girder cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN103074854B (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN202688888U (en) Deck type reversely hung template hanging frame
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN104131516A (en) Bridge cast-in-cantilever method cradle counter-pressure construction method
CN204023424U (en) A kind of Hanging Basket You Ding back-pressure mechanism
CN103362074B (en) Bridge cantilever box girder construction hanging basket pre-pressing loading device
CN202830785U (en) High pier bridge cantilever casting concrete 0 # block pier top bracket
CN203270465U (en) Hydraulic pre-compression construction device for cantilever suspension basket
CN203049471U (en) Rear fulcrum triangular bracket hanging basket
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN105369745A (en) Bridge support exchanging and lifting reaction frame
CN202073046U (en) Main truss system of downward hanging basket
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN203129025U (en) Suspension fixing device for hanging basket
CN104179125B (en) A kind of mobile formwork girder supports uses equalizer bar device
CN201722604U (en) Vertical force-transferring support
CN203479511U (en) Railway T beam static load test pedestal
CN202416193U (en) Asymmetric loading and pre-pressing device for bridge cantilever pouring construction hanging basket
CN106192772B (en) Jack bascule and mobile formwork for mobile formwork
CN210919081U (en) Auxiliary mechanical support for main oil cylinder of tunnel lining trolley
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN204174537U (en) A kind of stoplog downward mobile formwork bridge fabrication machine
CN205529940U (en) Bridge beam supports draw -out device
CN204212057U (en) A kind of mobile formwork girder supports uses equalizer bar device
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20150531

EXPY Termination of patent right or utility model