CN203255885U - Special large equipment indoor integral installation lifting tool - Google Patents

Special large equipment indoor integral installation lifting tool Download PDF

Info

Publication number
CN203255885U
CN203255885U CN 201220648018 CN201220648018U CN203255885U CN 203255885 U CN203255885 U CN 203255885U CN 201220648018 CN201220648018 CN 201220648018 CN 201220648018 U CN201220648018 U CN 201220648018U CN 203255885 U CN203255885 U CN 203255885U
Authority
CN
China
Prior art keywords
box
integral installation
main equipment
indoor integral
special hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220648018
Other languages
Chinese (zh)
Inventor
肖其志
王连军
生振刚
包朝亮
周勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN 201220648018 priority Critical patent/CN203255885U/en
Application granted granted Critical
Publication of CN203255885U publication Critical patent/CN203255885U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to the field of large equipment indoor installation operations, particularly to a special large equipment indoor integral installation lifting tool, which comprises box type structure carrying pole beams, a rectangle lifting frame arranged on the two carrying pole beams and formed through head-tail connection of four steel beams, and eight hanging hooks positioned on corns of the top surface and the bottom surface of the rectangle lifting frame, wherein the middle portion of the lifting frame is provided with a reinforcing beam. The special large equipment indoor integral installation lifting tool is characterized by further comprising two box-shaped end beams horizontally arranged in a parallel manner and four support legs respectively positioned on the bottoms of both ends of the two box-shaped end beams, wherein sliding rails matched with the support legs are arranged on the bottoms of the support legs, the bottoms of the two box-shaped end beams are provided with lifting oil cylinders, and the carrying pole beams are arranged on the tops of the two box-shaped end beams. According to the utility model, the design is adopted, and the novel special lifting tool for large equipment lifting is provided, wherein the special lifting tool is used in the condition that the installation position can not be used for vehicle driving and the large autocrane can not be used.

Description

The indoor integral installation special hanger of main equipment
Technical field
The utility model relates to main equipment indoor location operation field, is specially the indoor integral installation special hanger of a kind of main equipment.
Background technology
At present along with the construction project duration is shorter and shorter, in order effectively to control the duration, the increasing form that adopts Whole Equipment to install in engineering, yet many times, because integral device weight is large, the erecting stage narrow space, can't utilize driving and large automobile crane to install, thereby installation has caused inconvenience to equipment at all.
Summary of the invention
The purpose of this utility model is, a kind of suspender that is used for support apparatus that cooperates main equipment integral hoisting framework to use is provided.
In order to achieve the above object, the utility model is achieved in that
The indoor integral installation special hanger of a kind of main equipment, it comprises the shoulder pole girder of box-structure, and be arranged on two shoulder pole girders by four end to end rectangular hangers that form of girder steel and be positioned at the rectangular hanger end face and eight hooks of four jiaos of bottom surfaces; The suspension bracket middle part is provided with strength beam; Four feets that also comprise the box end carriage of two parallel horizontal arrangement and lay respectively at bottom, two box end carriage two ends, described feet bottom is provided with the slippage guide rail that matches and use, the bottom of two box end carriages is equipped with hoist cylinder, and shoulder pole girder is located at two box end carriage tops.
The indoor integral installation special hanger of described main equipment, described four feets, each only is formed by stacking by one group of box cushion block, connects with bolt between each box cushion block.
The indoor integral installation special hanger of described main equipment, it comprises that two cross sections that are arranged in parallel for the sliding track body of " worker " font, also comprise two groups of slide blocks and leveling backing plate and embedded board described slippage guide rail; Described two groups of slide blocks have four, and it is box-shaped, are provided with pipe between one-sided slide block and slide block and support, the bottom is provided with chute, slide block by this chute and with the sliding track body sliding block joint, be provided with lubricant medium between slide block and the sliding track body, slider top is connected with the feet bottom bolts; Embedded board is located at the below of sliding track body and is embedded in inside, ground, and the leveling backing plate is located at the sliding track body bottom and is adjusted slide rail.
The indoor integral installation special hanger of described main equipment also comprises pilot bar, and described pilot bar has four, and bolt is connected on four slide blocks respectively, and another side is connected to four jiaos of end carriage.
The indoor integral installation special hanger of described main equipment, the both sides of every one slide rail body are equipped with strut bar.
The indoor integral installation special hanger of described main equipment also comprises the pad rail, and the cross section of described pad rail is " worker " font, and it is located at the bottom of sliding track body.
The indoor integral installation special hanger of described main equipment also comprises the passing oil cylinder, and an end of described passing oil cylinder is fixed on the sliding rail, and the other end is connected with slide block.
The utility model adopts above-mentioned design, the integral hoisting work to main equipment finished that can be safe, reliable, flexible, changeable, and operation flexible adjustment, loading strength can satisfy the equipment hoisting requirement and safety factor is high, thus the special hanger that provides a kind of novel working as can't use the installation site driving and can't use the main equipment in the large automobile crane situation to lift.
Description of drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is left view of the present utility model.
Fig. 3 is the first partial front elevation view of the utility model slide rail part.
Fig. 4 is the second partial front elevation view of the utility model slide rail part.
Fig. 5 is the 3rd partial front elevation view of the utility model slide rail part.
The specific embodiment
Below further specify the utility model by specific embodiment.
As shown in Figure 1 and Figure 2, the indoor integral installation special hanger of a kind of main equipment, it comprises shoulder pole girder 2, and be arranged on the shoulder pole girder 2 by four end to end rectangular hangers that form 1 of girder steel and be positioned at rectangular hanger 1 end face and eight hooks 6 of four jiaos of bottom surfaces; Rectangular hanger 1 middle part is provided with strength beam; Four feets 5 that also comprise the box end carriage 3 of two parallel horizontal arrangement and lay respectively at bottom, two box end carriage 3 two ends, described feet 5 bottoms are provided with the slippage guide rail 7 that matches and use, the bottom of two box end carriages 3 is equipped with hoist cylinder 4, and shoulder pole girder 2 is located at two box end carriage 3 tops.
In order to strengthen the intensity of suspension bracket, also comprise fixed cross beam 9: it is erected on the box end carriage 3.
The indoor integral installation special hanger of described main equipment, described four feets 5, each only is formed by stacking by one group of box cushion block, connects with bolt between each box cushion block.
Such as Fig. 3, Fig. 4 and shown in Figure 5, the indoor integral installation special hanger of described main equipment, described sliding rail comprises that two cross sections that are arranged in parallel are the sliding track body 11 of " worker " font, also comprise two groups of slide blocks 13 and the adjustment backing plate 16 and the embedded board 17 that are used for adjusting sliding rail; Described two groups of slide blocks 13 have four, it is box-shaped, the bottom is provided with chute 14, slide block 13 by this chute 14 and with sliding track body 11 sliding block joints, embedded board 17 is located at the below of sliding track body 11 and is embedded in the ground, adjusts backing plate 16 and is located at the attitude that sliding track body 11 bottoms are used for adjusting whole sliding rail.
The indoor integral installation special hanger of described main equipment also comprises pilot bar 10, and the two ends of described pilot bar 10 respectively bolt are connected on four slide blocks and four jiaos of end carriage.
Described main equipment integral slipping sliding rail also comprises pad rail 12, and the cross section of described pad rail 12 is " worker " font.
The indoor integral installation special hanger of described main equipment comprises also and passes oil cylinder 11 that an end of described passing oil cylinder 11 is fixed on the sliding rail, and the other end is connected with slide block 13.
The utility model comprises shoulder pole girder 2, rectangular hanger 1, box end carriage 3 and feet 5.
The utility model adopts above-mentioned design, the integral hoisting work to main equipment finished that can be safe, reliable, flexible, changeable, and operation flexible adjustment, loading strength can satisfy the equipment hoisting requirement and safety factor is high, thus the special hanger that provides a kind of novel working as can't use the installation site driving and can't use the main equipment in the large automobile crane situation to lift.

Claims (7)

1. indoor integral installation special hanger of main equipment, it comprises the shoulder pole girder of box-structure, and be arranged on two shoulder pole girders by four end to end rectangular hangers that form of girder steel and be positioned at the rectangular hanger end face and eight hooks of four jiaos of bottom surfaces; The suspension bracket middle part is provided with strength beam; It is characterized in that: four feets that also comprise the box end carriage of two parallel horizontal arrangement and lay respectively at bottom, two box end carriage two ends, described feet bottom is provided with the slippage guide rail that matches and use, the bottom of two box end carriages is equipped with hoist cylinder, and shoulder pole girder is located at two box end carriage tops.
2. the indoor integral installation special hanger of main equipment according to claim 1 is characterized in that: described four feets, each only is formed by stacking by one group of box cushion block, connects with bolt between each box cushion block.
3. the indoor integral installation special hanger of main equipment according to claim 1 is characterized in that: it comprises that two cross sections that are arranged in parallel for the sliding track body of " worker " font, also comprise two groups of slide blocks and leveling backing plate and embedded board described slippage guide rail; Described two groups of slide blocks have four, and it is box-shaped, are provided with pipe between one-sided slide block and slide block and support, the bottom is provided with chute, slide block by this chute and with the sliding track body sliding block joint, be provided with lubricant medium between slide block and the sliding track body, slider top is connected with the feet bottom bolts; Embedded board is located at the below of sliding track body and is embedded in inside, ground, and the leveling backing plate is located at the sliding track body bottom and is adjusted slide rail.
4. the indoor integral installation special hanger of main equipment according to claim 2, it is characterized in that: also comprise pilot bar, described pilot bar has four, and bolt is connected on four slide blocks respectively, and another side is connected to four jiaos of end carriage.
5. the indoor integral installation special hanger of main equipment according to claim 3, it is characterized in that: the both sides of every one slide rail body are equipped with strut bar.
6. the indoor integral installation special hanger of main equipment according to claim 3, it is characterized in that: also comprise the pad rail, the cross section of described pad rail is " worker " font, and it is located at the bottom of sliding track body.
7. according to claim 1 or the indoor integral installation special hanger of 3 described main equipments, it is characterized in that: also comprise the passing oil cylinder, an end of described passing oil cylinder is fixed on the sliding rail, and the other end is connected with slide block.
CN 201220648018 2012-11-30 2012-11-30 Special large equipment indoor integral installation lifting tool Expired - Lifetime CN203255885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220648018 CN203255885U (en) 2012-11-30 2012-11-30 Special large equipment indoor integral installation lifting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220648018 CN203255885U (en) 2012-11-30 2012-11-30 Special large equipment indoor integral installation lifting tool

Publications (1)

Publication Number Publication Date
CN203255885U true CN203255885U (en) 2013-10-30

Family

ID=49468470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220648018 Expired - Lifetime CN203255885U (en) 2012-11-30 2012-11-30 Special large equipment indoor integral installation lifting tool

Country Status (1)

Country Link
CN (1) CN203255885U (en)

Similar Documents

Publication Publication Date Title
CN103147370B (en) Device and method for replacing track slab of slab ballastless track
CN103334381B (en) Full-bracket track-bogie bearing and moving device and construction method for installing steel box girders
CN204875552U (en) Frame bridge crane vertical lift structure
CN202148909U (en) Operation vehicle for mounting tunnel arch trusses
CN102002913B (en) Prefabricated T beam transferring trolley
CN102287209A (en) Tunnel arch center installation operation vehicle
CN103726421B (en) Height and span adjustable track paver for metro construction
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN203021883U (en) Wheel-track railway track laying unit
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN203866654U (en) Mobile assembly platform used for ballastless track laying construction
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN103074829A (en) Railway switch changing construction method and railway switch track laying unit thereof
CN208995928U (en) A kind of multi-functional erection crane suitable for composite beam construction
CN102190249B (en) Method for hoisting equipment positioned at bottom of multilayer frame platform
CN206219071U (en) A kind of switch cubicle installation lifting appliance
CN104675179A (en) Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN103342322A (en) Turning device and turning method for super-heavy and oversized article
CN204823885U (en) Tire formula is variably striden and is uprised gantry crane
CN205170212U (en) Semi -portal crane
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN207451439U (en) A kind of Overhead Crane Bridge
CN203255885U (en) Special large equipment indoor integral installation lifting tool
CN201849911U (en) Conveying device for heavy equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131030

CX01 Expiry of patent term