CN203241409U - 水平定向钻穿越模拟试验土箱 - Google Patents
水平定向钻穿越模拟试验土箱 Download PDFInfo
- Publication number
- CN203241409U CN203241409U CN 201320224528 CN201320224528U CN203241409U CN 203241409 U CN203241409 U CN 203241409U CN 201320224528 CN201320224528 CN 201320224528 CN 201320224528 U CN201320224528 U CN 201320224528U CN 203241409 U CN203241409 U CN 203241409U
- Authority
- CN
- China
- Prior art keywords
- soil
- directional drilling
- simulation test
- foil gauge
- horizontal directional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320224528 CN203241409U (zh) | 2013-04-27 | 2013-04-27 | 水平定向钻穿越模拟试验土箱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320224528 CN203241409U (zh) | 2013-04-27 | 2013-04-27 | 水平定向钻穿越模拟试验土箱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203241409U true CN203241409U (zh) | 2013-10-16 |
Family
ID=49318692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320224528 Expired - Fee Related CN203241409U (zh) | 2013-04-27 | 2013-04-27 | 水平定向钻穿越模拟试验土箱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203241409U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103711480A (zh) * | 2013-12-27 | 2014-04-09 | 中国地质大学(北京) | 水平钻进试验装置 |
CN106908226A (zh) * | 2015-12-22 | 2017-06-30 | 中国石油天然气集团公司 | 一种水平定向钻穿越冲击钻具性能测试装置及其测试方法 |
CN110187080A (zh) * | 2019-06-26 | 2019-08-30 | 北京中煤矿山工程有限公司 | 一种地铁相似模拟试验用的模块化土箱 |
-
2013
- 2013-04-27 CN CN 201320224528 patent/CN203241409U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103711480A (zh) * | 2013-12-27 | 2014-04-09 | 中国地质大学(北京) | 水平钻进试验装置 |
CN103711480B (zh) * | 2013-12-27 | 2016-07-06 | 中国地质大学(北京) | 水平钻进试验装置 |
CN106908226A (zh) * | 2015-12-22 | 2017-06-30 | 中国石油天然气集团公司 | 一种水平定向钻穿越冲击钻具性能测试装置及其测试方法 |
CN106908226B (zh) * | 2015-12-22 | 2020-09-04 | 中国石油天然气集团公司 | 一种水平定向钻穿越冲击钻具性能测试装置及其测试方法 |
CN110187080A (zh) * | 2019-06-26 | 2019-08-30 | 北京中煤矿山工程有限公司 | 一种地铁相似模拟试验用的模块化土箱 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Analysis on the precursor information of water inrush in karst tunnels: a true triaxial model test study | |
Li et al. | Stability analysis of large slurry shield-driven tunnel in soft clay | |
Liu et al. | Evaluation of foam conditioning effect on groundwater inflow at tunnel cutting face | |
CN102094641B (zh) | 一种压裂充填防砂模型 | |
WO2016078165A1 (zh) | 天然气水合物地层钻井模拟装置 | |
CN103926383A (zh) | 隧道突水突泥与注浆处治三维模型试验系统及其试验方法 | |
CN204703926U (zh) | 一种盾构施工用同步注浆模拟试验平台 | |
CN103791159A (zh) | 小直径管道的顶管施工方法 | |
CN206845146U (zh) | 一种用于水文地质钻孔分层抽水的止水器及止水装置 | |
CN109799327A (zh) | 一种可视化的盾构隧道施工注浆效果检测试验装置和方法 | |
CN203881738U (zh) | 隧道突水突泥与注浆处治三维模型试验系统 | |
CN104420869B (zh) | 水平井工艺模拟试验装置 | |
CN105158428A (zh) | 地下水多层位监测管 | |
Zhao et al. | Distribution characteristics of floor pore water pressure based on similarity simulation experiments | |
CN105178951B (zh) | 单孔多层位地下水监测系统及方法 | |
CN103278376A (zh) | 土压平衡盾构开挖面稳定性控制模型试验装置 | |
CN203241409U (zh) | 水平定向钻穿越模拟试验土箱 | |
Huang et al. | Hydraulic fracturing technology for improving permeability in gas-bearing coal seams in underground coal mines | |
CN107798195A (zh) | 一种基于损伤扩容理论的围岩位移预警方法 | |
CN109958434B (zh) | 钻孔定压力非稳定流钻孔水文地质试验方法 | |
Fang et al. | Model test and numerical simulation on the invert heave behaviour of high-speed railway tunnels with rainstorm | |
Bo et al. | Research on pressure relief scope of hydraulic flushing bore hole | |
Timms et al. | Vertical hydraulic conductivity of a clayey-silt aquitard: accelerated fluid flow in a centrifuge permeameter compared with in situ conditions | |
Zhang et al. | Exploration and grouting of large-scale water capsule in the fault fracture zone of Yonglian tunnel | |
CN104405317B (zh) | 一种钻井液中气泡体积相对变化量及气泡体积的检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170301 Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No. Patentee after: China National Petroleum Corporation Patentee after: China Petroleum Pipeline Bureau Engineering Co., Ltd. Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No. Patentee before: China National Petroleum Corporation Patentee before: China Petroleum and Natural Gas Pipeline Bureau |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131016 Termination date: 20210427 |