CN203233657U - Local modeling of coast saline-alkali land terraced field dredger fill - Google Patents

Local modeling of coast saline-alkali land terraced field dredger fill Download PDF

Info

Publication number
CN203233657U
CN203233657U CN 201320292655 CN201320292655U CN203233657U CN 203233657 U CN203233657 U CN 203233657U CN 201320292655 CN201320292655 CN 201320292655 CN 201320292655 U CN201320292655 U CN 201320292655U CN 203233657 U CN203233657 U CN 203233657U
Authority
CN
China
Prior art keywords
fill
barged
soil
local
dredger fill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320292655
Other languages
Chinese (zh)
Inventor
张松涛
胡月楠
刘畅
周鹏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin T+a Landscape Planning & Design Co Ltd
Original Assignee
Tianjin T+a Landscape Planning & Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin T+a Landscape Planning & Design Co Ltd filed Critical Tianjin T+a Landscape Planning & Design Co Ltd
Priority to CN 201320292655 priority Critical patent/CN203233657U/en
Application granted granted Critical
Publication of CN203233657U publication Critical patent/CN203233657U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model provides a local modeling of coast saline-alkali land terraced field dredger fill, which comprises an infiltration ditch, foundation terrain dredger fill, a straw curtain, a geotechnical cloth, improved planting soil and a local modeling and the like from top to bottom, wherein the infiltration ditch is arranged on a slope bottom of the foundation terrain dredger fill, the straw curtain is arranged on the foundation terrain dredger fill, the geotechnical cloth and the improved planting soil are distributed on the foundation terrain dredger fill, and the local modeling is arranged on the planting soil. The local modeling of the coast saline-alkali land terraced field dredger fill is that a certain specification of terraces are built along contour line elevation slope layered soil preparation, ridges having heights of 0.15-0.2m are arranged on the outer edge of a field surface, and ridges having the heights of 0.15-0.5m is further arranged interval of 4m along a contour line, thereby forming a 4*1m narrow border. The local modeling of the coast saline-alkali land terraced field dredger fill directly mounds soil to raise the ground, thereby preventing processes for arranging blind drains and blind pipes by slotting, simplifying construction process, saving above 50% greening cost, and enabling survival rate of garden plants to be above 90%.

Description

A kind of local sculpt of beach saline land terrace-type barged-in fill
Technical field
The utility model belongs to the landscape engineering technical field, designs the method for afforestation, especially relates to a kind of local sculpt of beach saline land terrace-type barged-in fill.
Background technology
According to UNESCO and food and agricultural organization's incomplete statistics, the area in saline land, the whole world is 9.5438 hundred million hectares, and wherein China is 9,913 ten thousand hectares.The formation of China's alkaline earth and alkali-affected soil, most of relevant with the accumulative total of Carbonates In Soil, thereby basicity is generally higher, serious salt affected soil regional plant almost can not be survived.
Beach saline land has the characteristics such as area is wide, areal variation large, improvement difficulty as one of China's saline land main Types.Coastal saline-alkali soil is owing to be subject to for a long time the dipping of seawater, the neutral salinities such as the sodium chloride in the soil, sodium sulphate constantly deposit, and cause the physical characteristics such as marine solonchak has structure viscous, air capacity of soils is poor, the aerobic microorganism activity is poor, nutrient discharges slowly, osmotic coefficient is low, capillarity is strong.In addition, because the coastal region shortage of water resources, thereby causing topsoil salination aggravation, garden plants is difficult to survive at this, is having a strong impact on beach saline land greening survival rate.
The greening of the original saline-alkali soil of coastal region and barged-in fill is a difficult problem that perplexs for a long time the PORT OF TIANJIN Urban Greening always.The in the past harbor district greening modes that adopt the strange land soil removal and replacement need to be bought a large amount of cubic metres of earth from elsewhere, exist easily the native source of greening nervous, cause the elsewhere ecological disruption, the disadvantage such as be difficult to continue.The barged-in fill improvement greening technique that adopt first the PORT OF TIANJIN is a kind of rapidly and efficiently improvement and the practical engineering of greening for marine solonchak and barged-in fill.It take the draining desalination as the basis, realizes land improvement under the prerequisite of not changing planting soil, have the characteristics such as fresh-water-saving, saving engineering cost.
Coastal saline-alkali area original soil greening method has the reclamation of salinep-alkali soil measure of many maturations at present, it is physically improved to mainly contain (1), such as ground grading, deep ploughing is suned the earth which has been ploughed up, soil moved in to improve the original is raised ground, microcell is improved the soil, whole ground, large cave etc., this has certain improved effect for low water level, soil below the salinity moderate, but for the high water level area, under the effect of soil capillary, still accumulation of salt in the surface soil phenomenon can appear, cause the upper soll layer salinity to gather, occur hardening, plant is difficult to survive; (2) river construction improvement,, storage fresh water on saline-alkali land for leaching supporting such as irrigation and drainage, washing salinity by irrigation, hidden pipe salt discharge etc., although the salt discharge successful, the afforestation project cost that the fluting stringing makes increases greatly; (3) chemical modifying, add soil chemistry modifying agent technology, such as superphosphate, detritus acid, acid-sludge etc., it is also fast to take effect, but newly-increased chemical substance has changed the physicochemical property of original soil, from a long-term perspective, single large tracts of land uses chemical improvement agent can increase environmental risk, such as the change of edaphon kind; (4) biological modification, as by breeding, Selection of Salt-Tolerant plant, although the method is also effective, time cycle is long but the plant after the improvement conforms, short-term response is slow, and directly selects the strong saline alkali tolerant plant of plantation, and plant variety is single, common halophytes such as alkali is fluffy, Chinese tamarisk, twocolor sealavander herb etc., all is that the herbaceous plant view is not good.
Summary of the invention
The purpose of this utility model is the shortcoming and deficiency for prior art, a kind of local sculpt of beach saline land terrace-type barged-in fill is provided, this local sculpt comprises from bottom to top: infiltration ditch 1, basis landform barged-in fill 2, straw curtain 3, geotextiles 4, the planting soil 5 after the improvement, local sculpt 6, inspection shaft 7.
Wherein: 1, the effect of infiltration ditch (interior filling quarrel stone): collect unnecessary water in the soil, enter inspection shaft, prevent that subterranean water level from rising.2, the effect on barged-in fill basis: raise ground, lowering of watertable.3, the effect of straw curtain: the soil excessive moisture is oozed under smooth and easy, reach the purpose of salt discharge, can effectively stop again the basal layer soil salt with Investigation of Upward Movement of Soil Water, suppress accumulation of salt in the surface soil phenomenon.4, the effect of geotextiles: buffer action, control soil enters in the straw curtain slit.
5, the effect of the planting soil after the improvement: for plant growth provides available nutrient.6, the effect of local sculpt: retain rainwater.
7, the effect of inspection shaft: the later stage checks and cleaning that the ditch of avoiding seeping water stops up.
Described infiltration ditch 1 is positioned at the sloping end of basic landform barged-in fill 2, lays straw curtain 3 on the basic landform barged-in fill 2, spreads geotextiles 4 on the straw curtain, repaves the planting soil 5 after the improvement on the geotextiles, and local sculpt 6 on planting soil.
Described basic landform barged-in fill 2 is high 1-1.5m to ground, 15 °-30 ° of the gradients.
The sloping end that described infiltration ditch 1 is positioned at basic landform barged-in fill 2 refers to: infiltration ditch 1 is at the vertical square sewer of excavation 0.5 * 0.5m of basic landform barged-in fill 2 lowest parts, in fill out particle diameter 10-12cm quarrel stone.
Described infiltration ditch 1 peak has 0.3% the gradient to minimum point; Minimum point links to each other with greenery patches inspection shaft 7.The greenery patches inspection shaft will check and clear up in the later stage, and the ditch of avoiding seeping water stops up.Straw screen or mat 3 is the straw of the thick compacting of thickness 20-30cm.
Described local sculpt 6 refers to: repair along the whole ground of sloping layering along the contour absolute altitude, build the terraced fields on 45 ° on wide 0.5-1m, the high 0.5-0.6m of bank, bank slope, in field face outer rim the high low bank of earth between fields of 0.15-0.2m is set, along contour interval 4m the high low bank of earth between fields of 0.15-0.2m is set again, forms the little furrow of 4 * 1m.
The manufacture method of the local sculpt of beach saline land terrace-type barged-in fill described in the utility model is as follows:
The first step: the arrangement place, do basic landform: air-dry barged-in fill is carried out the compacting of layering mound, the high 1-1.5m to ground, gradient 15-30 °, purpose is to raise ground, lowering of watertable.
Second step: in slope end lowest part excavation infiltration ditch: the toe lowest part is the square sewer of excavation 0.5 * 0.5m vertically, in fill out particle diameter 10-12cm quarrel stone, be used for collecting the water that drenches under the layer row; Sewer peak to minimum point has 0.3% the gradient; Minimum point links to each other with the greenery patches inspection shaft.Collect unnecessary water in the soil, enter inspection shaft, prevent that subterranean water level from rising.
The 3rd step: curtain spreads straw on basic landform, the infiltration ditch: the straw curtain of laying the thick compacting of 20-30cm on basic landform and the infiltration ditch.The straw curtain can make the soil excessive moisture ooze under smooth and easy, reaches the purpose of salt discharge, can effectively stop again the basal layer soil salt with Investigation of Upward Movement of Soil Water, suppresses accumulation of salt in the surface soil phenomenon.
The 4th step: spread geotextiles on the straw curtain: the shop has the geotextiles of anticorrosion water permeability on the straw curtain, is used for isolation implant soil, and control soil enters into straw.
The 5th step: spread the barged-in fill after improveing on the geotextiles: loose air-dry barged-in fill is piled on the pouring layer of completing soil thickness 1-1.5m after mixing organic matter.The described organic matter that mixes refers to parts by weight and is: stalk or the peat composed of rotten mosses: mud: desulfurated plaster: acid-sludge 1:1:0.2:0.2~1:1:0.5:0.5, purpose increases the soil water permeability of barged-in fill.
The 6th step: local sculpt: repair along the whole ground of sloping layering along the contour absolute altitude, build the terraced fields on 45 ° on wide 0.5-1m, the high 0.5-0.6m of bank, bank slope, in field face outer rim the high low bank of earth between fields of 0.15-0.2m is set, along contour interval 4m the high low bank of earth between fields of 0.15-0.2m is set again, form the little furrow of 4 * 1m, purpose is convenient to retaining.
The 7th step: retaining washed out soil salinity: utilize natural precipitation or fresh water in rainy season, each little furrow retaining 0.15-0.2m is high, treats to have oozed under the nature again and pours water, and measures soil salt after carrying out three times altogether.
The 8th step: applying organic manure plowed soils: enrich the animal wastes of slaking on washed terraced fields cell surface, the component ratio is 1:1, then turn over and carry out fertilizing soil, measure the soil nutrient index, purpose provides the growth substrate with nutrient (animal wastes of slaking refer to: cow dung or chicken manure) for plant.
The 9th step: plant ornamental plant on the barged-in fill after the improvement: plantation is adapted at the ornamental plant of slight alkaline land growth, such as Chinese wax, Chinese scholar tree, locust tree, Luan Shu, silk tree, the rose of Sharon or mountain peach etc.
The utility model is conducive to retain rainwater in conjunction with the terrace-type moulding, and fully washed out soil reduces salinity, solves simultaneously the problem of beach saline land afforestation freshwater resources deficiency; Utilize landform and lay the isolated materials such as permeable geotextiles, straw curtain, both can reach the purpose of salt discharge so that soil moisture is oozed under smooth and easy, effectively stop simultaneously the basal layer soil salt with Investigation of Upward Movement of Soil Water, suppressed accumulation of salt in the surface soil phenomenon; By mixing stalk after the pulverizing, domestic sludge, the acid-sludge behind the compost fermentation, the refuses such as desulfurated plaster in power plant, increased the porosity of barged-in fill, accelerate to ooze, to have avoided the salification phenomenon under the moisture, effectively reduce simultaneously the pH value of washing behind the soil, increased the fertility of soil; By the utility model, ornamental plant can be planted the tool appreciation effect and the plant of salt resistance is arranged, and such as Chinese wax, Chinese scholar tree, locust tree, Luan Shu, silk tree, the rose of Sharon, mountain peach etc., survival rate is more than 90%.
The good effect that the local sculpt of the disclosed beach saline land terrace-type of the utility model barged-in fill compared with prior art has is:
(1) the direct mound of the utility model is raised ground, has avoided fluting to break ground and has laid the operation of french drain, blind pipe, has simplified construction technology.Particularly by mixing debirs, improve barged-in fill as the method for planting soil and use the straw curtain to substitute tradition quarrel masonry for the method for pouring layer, effectively utilized refuse, protected natural resources, saved the greening cost more than 50%.
(2) the utility model is conducive to retain rainwater in conjunction with the terrace-type moulding, makes salinity obtain effective drip washing and reduces; Be conducive to the fertilizer conservation soil conservation, make the ornamental plant survival rate more than 90%.
Description of drawings:
Fig. 1 is the local sculpt structural representation of beach saline land terrace-type barged-in fill;
Fig. 2 is the plane design drawing of the local sculpt of beach saline land terrace-type barged-in fill;
1, infiltration ditch (interior filling quarrel stone); 2 barged-in fills basis;
3, straw curtain; 4, geotextiles; 5, the planting soil after the improvement; 6, local sculpt; 7, inspection shaft.
Embodiment:
Below in conjunction with specific embodiment the utility model is described further, following each embodiment only is used for explanation the utility model and is not limitation of the utility model.
Embodiment 1
The local sculpt of beach saline land terrace-type barged-in fill, this local sculpt comprises from bottom to top: infiltration ditch 1, basic landform barged-in fill 2, straw curtain 3, geotextiles 4, the planting soil 5 after the improvement, local sculpt 6, inspection shaft 7, wherein:
(1) infiltration ditch 1 is at the vertical square sewer of excavation 0.5 * 0.5m of basic landform barged-in fill 2 lowest parts, in fill out particle diameter 10cm quarrel stone, infiltration ditch 1 peak has 0.3% the gradient to minimum point; Minimum point links to each other with greenery patches inspection shaft 7, and purpose is to collect unnecessary water in the soil, prevents that subterranean water level from rising.
(2) basic landform barged-in fill 2 to ground high 1.5m, 30 ° of the gradients, purpose are to raise ground, lowering of watertable.
(3) the straw curtain 3 of laying compacting on the basic landform barged-in fill 2, its thickness is 20cm, its objective is in order to play isolation, salt discharge water.
(4) spreading geotextiles 4 on the straw curtain, mainly is for isolation implant soil, and control soil enters into straw.
(5) repave planting soil 5 after the improvement on the geotextiles, carry out local sculpt 6 at planting soil.Described local sculpt 6 refers to: repair along sloping layering mound along the contour absolute altitude, build the terraced fields on 45 ° on wide 1m, the high 0.6m of bank, bank slope, in field face outer rim the high low bank of earth between fields of 0.2m is set, along contour interval 4m the high low bank of earth between fields of 0.2m is set again, form the little furrow of 4 * 1m, purpose is to be convenient to retaining.
Embodiment 2
A kind of local sculpt of beach saline land terrace-type barged-in fill is characterized in that this local sculpt comprises from bottom to top: infiltration ditch 1, basic landform barged-in fill 2, straw curtain 3, geotextiles 4, the planting soil 5 after the improvement, local sculpt 6, inspection shaft 7; Infiltration ditch 1 is positioned at the sloping end of basic landform barged-in fill 2, lays straw curtain 3 on the basic landform barged-in fill 2, spreads geotextiles 4 on the straw curtain, repaves the planting soil 5 after the improvement on the geotextiles, carries out local sculpt 6 at planting soil.Described basic landform barged-in fill is high 1.5m to ground, 15 ° of the gradients.The sloping end that described infiltration ditch 1 is positioned at basic landform barged-in fill 2 refers to: infiltration ditch 1 is at the vertical square sewer of excavation 0.5 * 0.5m of basic landform barged-in fill 2 lowest parts, in fill out particle diameter 12cm quarrel stone.
Described infiltration ditch 1 peak has 0.3% the gradient to minimum point; Minimum point links to each other with greenery patches inspection shaft 7.Straw curtain 3 is the straw of the thick compacting of thickness 30cm.Described local sculpt 6 refers to: repair along the whole ground of sloping layering along the contour absolute altitude, build the terraced fields on 45 ° on wide 1m, the high 1m of bank, bank slope, in field face outer rim the high low bank of earth between fields of 0.2m is set, along contour interval 4m the high low bank of earth between fields of 0.2m is set again, form the little furrow of 4 * 1m.
Embodiment 3
Be positioned at by the interim service area office building of prince wife Cao pasture, Hebei province ecological city, experiment soil is the ooze barged-in fill, and soil property is sandy loam, total salt 1.36%, pH value 7.72.
(1) barged-in fill with water content 12% carries out the compacting of layering mound, the high 1.5m to ground, and 25 ° of the gradients are as basic landform;
(2) the vertical square sewer of excavation 0.5 * 0.5m of toe lowest part, in fill out particle diameter 10-12cm quarrel stone; The sewer peak is to minimum point gradient 0.3%, and minimum point links to each other with the greenery patches inspection shaft;
(3) the straw curtain of the thick compacting of laying 25cm on basic landform and the infiltration ditch;
(4) spread one deck on the straw curtain and have the geotextiles of anticorrosion water permeability;
The hydraulic reclamation mound that (5) will mix the stalk pulverized, mud, desulfurated plaster, acid-sludge is on the straw curtain, and soil thickness 1.5m mixes the thing stalk: mud: desulfurated plaster: the component ratio of acid-sludge is 1:1:0.25:0.25(weight fraction ratio);
(6) along the whole ground of sloping layering, build the terraced fields on 45 ° on wide 0.6m, the high 1m of bank, bank slope, in field face outer rim the low bank of earth between fields of high 0.2 * 0.2m is set, along contour interval 4m the low bank of earth between fields of 0.2 * 0.2m is set again, form the little furrow of 4 * 1m;
(7) enter the high fresh water of 0.2m to each little border irrigation, treat to have oozed under the nature and continue again to pour water, carry out altogether three times;
(8) enrich the animal wastes of slaking in component ratio 1:1 on washed terraced fields cell surface, the plants such as plantation Chinese wax, Chinese scholar tree, locust tree, Luan Shu, silk tree, the rose of Sharon, mountain peach of turning over, plant survival rate 95%.
The desalination test effect of table 1 chiltern barged-in fill
Figure 668163DEST_PATH_IMAGE001
Nutrient before and after the improvement of table 2 sandy loam matter barged-in fill changes
The frequency of irrigation index Initial soil After 1 time Behind 2 water Behind 3 water
Total salt (%) 1.36 0.917 0.544 0.238
pH 7.72 7.92 8.06 8.12
Embodiment 4
Cost compare
Figure 709938DEST_PATH_IMAGE002
Embodiment 5
The effect of implantation methods and plant
Figure 614309DEST_PATH_IMAGE003
Conclusion:
(1) retains rainwater, raises under the landform acceleration moisture and ooze by the terrace-type moulding, realize that finally soil salt obtains effective drip washing, has suppressed accumulation of salt in the surface soil phenomenon;
(2) terrace-type moulding is conducive to the soil conservation fertilizer conservation, and the plant growing way does very well;
(3) the terrace-type greening method of moulding of improving the soil, more traditional soil improvement greening mode, plant survival rate improves more than 2 times.

Claims (6)

1. the local sculpt of a beach saline land terrace-type barged-in fill is characterized in that this local sculpt comprises from bottom to top: infiltration ditch (1), basic landform barged-in fill (2), straw curtain (3), geotextiles (4), the planting soil after the improvement (5), local sculpt (6), inspection shaft (7); Infiltration ditch (1) is positioned at the sloping end of basic landform barged-in fill (2), the upper straw curtain (3) of laying of basis landform barged-in fill (2), spread geotextiles (4) on the straw curtain, repave the planting soil (5) after the improvement on the geotextiles, carry out local sculpt (6) at planting soil.
2. beach saline land terrace-type barged-in fill local sculpt according to claim 1, it is characterized in that described basic landform barged-in fill (2) to ground high 1-1.5m, 15 °-30 ° of the gradients.
3. beach saline land terrace-type barged-in fill local sculpt according to claim 1, it is characterized in that the sloping end that described infiltration ditch (1) is positioned at basic landform barged-in fill (2) refers to: infiltration ditch (1) vertically excavates the square sewer of 0.5 * 0.5m at basic landform barged-in fill (2) lowest part, in fill out particle diameter 10-12cm quarrel stone.
4. beach saline land terrace-type barged-in fill local sculpt according to claim 1 is characterized in that described infiltration ditch (1) peak has 0.3% the gradient to minimum point; Minimum point links to each other with greenery patches inspection shaft (7).
5. beach saline land terrace-type barged-in fill local sculpt according to claim 1 is characterized in that described straw curtain (3) is the straw of the thick compacting of thickness 20-30cm.
6. beach saline land terrace-type barged-in fill local sculpt according to claim 1, it is characterized in that described local sculpt (6) refers to: repair along the whole ground of sloping layering along the contour absolute altitude, build the terraced fields on 45 ° on wide 0.5-1m, the high 0.5-0.6m of bank, bank slope, in field face outer rim the high low bank of earth between fields of 0.15-0.2m is set, along contour interval 4m the high low bank of earth between fields of 0.15-0.2m is set again, forms the little furrow of 4 * 1m.
CN 201320292655 2013-05-27 2013-05-27 Local modeling of coast saline-alkali land terraced field dredger fill Expired - Fee Related CN203233657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320292655 CN203233657U (en) 2013-05-27 2013-05-27 Local modeling of coast saline-alkali land terraced field dredger fill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320292655 CN203233657U (en) 2013-05-27 2013-05-27 Local modeling of coast saline-alkali land terraced field dredger fill

Publications (1)

Publication Number Publication Date
CN203233657U true CN203233657U (en) 2013-10-16

Family

ID=49311008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320292655 Expired - Fee Related CN203233657U (en) 2013-05-27 2013-05-27 Local modeling of coast saline-alkali land terraced field dredger fill

Country Status (1)

Country Link
CN (1) CN203233657U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105325225A (en) * 2014-08-08 2016-02-17 北京碧青园园林绿化工程有限公司 Method improving tree plantation survival rate in severe saline-alkali soil
CN107409522A (en) * 2017-07-18 2017-12-01 天津港(集团)有限公司 A kind of method that soil structure of coastal dredger fills is improved using mushroom bran base composite high-water-absorptivresin resin
CN110984200A (en) * 2019-12-29 2020-04-10 河南省地质矿产勘查开发局第二地质环境调查院 Method for draining water of foundation pit of binary geological structure layer
CN113317098A (en) * 2021-04-02 2021-08-31 深圳市华美绿生态环境集团有限公司 Hierarchical greening method suitable for saline-alkali soil

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105325225A (en) * 2014-08-08 2016-02-17 北京碧青园园林绿化工程有限公司 Method improving tree plantation survival rate in severe saline-alkali soil
CN107409522A (en) * 2017-07-18 2017-12-01 天津港(集团)有限公司 A kind of method that soil structure of coastal dredger fills is improved using mushroom bran base composite high-water-absorptivresin resin
CN110984200A (en) * 2019-12-29 2020-04-10 河南省地质矿产勘查开发局第二地质环境调查院 Method for draining water of foundation pit of binary geological structure layer
CN110984200B (en) * 2019-12-29 2022-01-07 河南省地质矿产勘查开发局第二地质环境调查院 Method for draining water of foundation pit of binary geological structure layer
CN113317098A (en) * 2021-04-02 2021-08-31 深圳市华美绿生态环境集团有限公司 Hierarchical greening method suitable for saline-alkali soil

Similar Documents

Publication Publication Date Title
CN103262689B (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN105519274B (en) A kind of integrated approach of extensive coastal new Climacteric symptoms farmland ecology exploitation
CN104472052B (en) A kind of engineering-chemical-biological-desalination water saving-information technology improvement saline land method
CN101849454B (en) Biological synthesis improvement method of salt-alkali shoaly land
CN102037806B (en) Greening method for dredger fill
CN102577789B (en) Method of cyclic sustainable vegetation recovery for waste dump of grassland mining area
CN106900322A (en) The engineering wound-surface Ecological recovery technology of moss crust
CN101336593B (en) Method for constructing ecology garden landscape compound structures to improve salt-affected soil
CN203896685U (en) Tree planting structure in coastal saline-alkali land
CN103181258A (en) Saline-alkali soil improvement method
CN102160483A (en) Method for afforesting desert and retaining water
Chen et al. Chinese rose (Rosa chinensis) cultivation in Bohai Bay, China, using an improved drip irrigation method to reclaim heavy coastal saline soils
CN104521363A (en) Reclamation method for rural residence lands on coastal saline land region
CN102067753A (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN104770097B (en) Original soil improvement greening method based on the strand severe salt-affected soil that material mixes
CN104186137A (en) Technology for cultivating and greening tall fescue grass on inshore mud flat saline-alkali soil
CN101849453A (en) Earth surface planting desert reforming technology
CN107969188A (en) A kind of salt-soda soil irrigation canals and ditches side slope herbosa plants raw structure and planting and establishing method
CN101946675A (en) Method for constructing muddy coast protection forest
CN110073756A (en) A kind of beach newly encloses tideland for cultivation the efficient modification method of farmland soil
CN203233657U (en) Local modeling of coast saline-alkali land terraced field dredger fill
CN102144523A (en) Sidewalk-frozen tree planting method for coastal saline-salt soil
CN112825639A (en) Coastal saline and alkaline land greening system based on landscaping waste utilization
CN207739092U (en) Landscape ecology Pavement Construction
CN104429802B (en) Unirrigated vegetation planting method by Haloxylonammodendron for heavy clay lands of arid area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20190527

CF01 Termination of patent right due to non-payment of annual fee