CN203229960U - Granular mixture accumulation slope cutting excavation strengthening and protective structure - Google Patents

Granular mixture accumulation slope cutting excavation strengthening and protective structure Download PDF

Info

Publication number
CN203229960U
CN203229960U CN 201320121223 CN201320121223U CN203229960U CN 203229960 U CN203229960 U CN 203229960U CN 201320121223 CN201320121223 CN 201320121223 CN 201320121223 U CN201320121223 U CN 201320121223U CN 203229960 U CN203229960 U CN 203229960U
Authority
CN
China
Prior art keywords
bulk solid
reinforcement
slip casting
steel bar
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320121223
Other languages
Chinese (zh)
Inventor
姚裕春
朱颖
李安洪
徐骏
叶世斌
龚建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
China State Railway Group Co Ltd
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN 201320121223 priority Critical patent/CN203229960U/en
Application granted granted Critical
Publication of CN203229960U publication Critical patent/CN203229960U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A granular mixture accumulation slope cutting excavation strengthening and protective structure comprises reinforced concrete strengthening piles (10), reinforced concrete soil guarding plates (20), composite drainage networks (21) and slip casting steel floral pipes (3); the reinforced concrete strengthening piles (10) are arranged at the excavated cutting foot along the longitudinal direction of a route at intervals; the reinforced concrete soil guarding plates (20) are respectively arranged between two adjacent reinforced concrete strengthening piles (10); the composite drainage networks (21) are arranged behind the reinforced concrete soil guarding plates (20); the slip casting steel floral pipes (3) are arranged on the upper slope side, the lower slope side and among the piles at intervals; the slip casting steel floral pipes and the surrounded granular mixtures are formed into slip casting strengthening bodies through slip casting.

Description

Bulk solid is piled up sloping cutting excavation reinforcement protection structure
Technical field
The utility model relates to the excavation reinforcement protection structure that bulk solid is piled up sloping cutting excavation ruggedized construction, particularly fine grained bulk solid such as sand-sliding slope cutting.
Background technology
Western China particularly Sichuan-Tibet highway be distributed with a large amount of bulk solid along the line and pile up the slope, as sand-sliding slope, when the highway construction of building railway engineering particularly, owing to be subjected to the control of conditions such as line style and longitudinal gradient, the bulk solid that some can occur is piled up sloping cutting engineering, owing to the bulk solid deposit that resembles the sand-sliding slope class has shot, domatic source is measured greatly, is difficult to excavation and propped up the characteristics such as protecting difficulty of keeping off, when the road engineering was passed through with the cutting form, a kind of bulk solid of active demand was piled up sloping cutting excavation reinforcement protection structure.
The utility model content
Technical problem to be solved in the utility model provides a kind of bulk solid and piles up sloping cutting excavation reinforcement protection structure, pile up the slope because of excavation and slope reinforcement protection difficult problem that cutting excavation causes to solve bulk solid, effectively guarantee to excavate the stable of cutting engineering.
The technical scheme that its technical problem that solves the utility model adopts is as follows:
Bulk solid of the present utility model is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: the steel bar concrete reinforcement stake is arranged at excavation cutting toe along circuit longitudinal separation; The steel concrete breast boards is arranged between the adjacent two steel bar concrete reinforcement stakes; Composite drainage network, be arranged at the steel concrete breast boards after; Slip casting spray of molten steel pipe is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake, by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
The beneficial effects of the utility model are, solve bulk solid effectively and piled up the slope reinforcement protection difficult problem that the slope causes because of cutting excavation, simple in structure, easy construction, can guarantee effectively that bulk solid piles up stable behind safety in the sloping digging process and the excavation, have wide popularizing application prospect.
Description of drawings
This manual comprises following two width of cloth accompanying drawings:
Fig. 1 is the schematic cross-sectional view that the utility model bulk solid is piled up sloping cutting excavation reinforcement protection structure;
Fig. 2 is the floor map that the utility model bulk solid is piled up sloping cutting excavation reinforcement protection structure.
Member shown in the figure, toponym and corresponding mark: steel bar concrete reinforcement stake 10, steel concrete breast boards 20, composite drainage network 21, slip casting spray of molten steel pipe 30, stablize that rock-soil layer A, bulk solid pile up sloping body B, bulk solid is piled up sloping body direction C.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
See figures.1.and.2, bulk solid of the present utility model is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: steel bar concrete reinforcement stake 10 is arranged at excavation cutting toe along circuit longitudinal separation; Steel concrete breast boards 20 is arranged between the adjacent two steel bar concrete reinforcement stakes 10; Composite drainage network 21, be arranged at steel concrete breast boards 20 after; Slip casting spray of molten steel pipe 3 is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake 10, by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
The utility model utilizes steel bar concrete reinforcement stake 10 to bear soil pressure and sliding force that bulk solid is piled up sloping cutting top bulk solid, utilize block bulk solid between 10 of steel bar concrete reinforcement stakes of breast boards 20, utilize composite drainage network 21 rows, and prevent that breast boards 20 back bulk solids from being taken out of by underground infiltration and phenomenon occurs emptying, utilize 30 pairs of bulk solids of slip casting spray of molten steel pipe to carry out grouting and reinforcing and form the grouting and reinforcing body, guarantee stablizing in steel bar concrete reinforcement stake 10 digging processs, avoid occurring in the work progress hole that collapses.This structure has solved the slope reinforcement protection difficult problem that bulk solid is piled up sloping cutting excavation difficulty and therefore caused effectively, simple in structure, easy construction, can guarantee effectively that bulk solid piles up stable behind safety in the sloping digging process and the excavation, have wide popularizing application prospect.
The grouting and reinforcing body that described slip casting spray of molten steel pipe 30 slip castings form should be connected to form integral body, usually should be greater than 5m at the uphill side grouting and reinforcing body width of steel bar concrete reinforcement stake 10, and the descending side should be greater than 2m, and reinforcement depth is piled up the degree of depth greater than bulk solid.
Described steel bar concrete reinforcement stake 10 bottoms are embedded in stablizes under the bulk solid in the rock-soil layer, and pile spacing usually should be less than 6m.Steel concrete breast boards 20 should adopt reinforced concrete prefabricated construction, connects by the embedded bar that is arranged in the steel bar concrete reinforcement stake 10, and the lap width of its two ends and steel bar concrete reinforcement stake 10 is not less than 30cm.
Steel bar concrete reinforcement stake 10 should be adopted every 2 piles job-hopping excavation, excavation stake well arranges a joint fore shaft or retaining wall carries out a well protection and at steel concrete breast boards 20 the pre-buried connecting reinforcement in position is set every 1m, should strengthen the observation of bulk solid slope deforming in the digging process and carry out the emergent precautionary measures.Steel bar concrete reinforcement stake 10 construction finish reach design strength 80% after can excavate preceding a ground body, the each cutting depth of ground body should not be greater than 2m before the stake, the timely construction reinforced bar concrete breast boards 20 of palpus behind the excavation.
The above the utility model bulk solid that just explains through diagrams is piled up some principles of sloping cutting excavation reinforcement protection structure, be not be the utility model to be confined to shown in and in described concrete structure and the scope of application, so every corresponding modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.

Claims (4)

1. bulk solid is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: steel bar concrete reinforcement stake (10) is arranged at excavation cutting toe along circuit longitudinal separation; Steel concrete breast boards (20) is arranged between the adjacent two steel bar concrete reinforcement stakes (10); Composite drainage network (21), be arranged at steel concrete breast boards (20) after; Slip casting spray of molten steel pipe (3) is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake (10), by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
2. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: the grouting and reinforcing body that described slip casting spray of molten steel pipe (30) slip casting forms is connected to form integral body, at the uphill side grouting and reinforcing body width of steel bar concrete reinforcement stake (10) greater than 5m, the descending side is greater than 2m, and reinforcement depth is piled up the degree of depth greater than bulk solid.
3. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: described steel bar concrete reinforcement stake (10) bottom is embedded in stablizes under the bulk solid in the rock-soil layer, and pile spacing is less than 6m.
4. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: described steel concrete breast boards (20) connects by the embedded bar that is arranged in the steel bar concrete reinforcement stake (10), and the lap width of its two ends and steel bar concrete reinforcement stake (10) is not less than 30cm.
CN 201320121223 2013-03-16 2013-03-16 Granular mixture accumulation slope cutting excavation strengthening and protective structure Expired - Lifetime CN203229960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320121223 CN203229960U (en) 2013-03-16 2013-03-16 Granular mixture accumulation slope cutting excavation strengthening and protective structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320121223 CN203229960U (en) 2013-03-16 2013-03-16 Granular mixture accumulation slope cutting excavation strengthening and protective structure

Publications (1)

Publication Number Publication Date
CN203229960U true CN203229960U (en) 2013-10-09

Family

ID=49286093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320121223 Expired - Lifetime CN203229960U (en) 2013-03-16 2013-03-16 Granular mixture accumulation slope cutting excavation strengthening and protective structure

Country Status (1)

Country Link
CN (1) CN203229960U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161170A (en) * 2013-03-16 2013-06-19 中铁二院工程集团有限责任公司 Excavation, consolidation and protection structure of granular mixture accumulation slope cutting
CN103821188A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 High-speed railway embankment offset correction structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161170A (en) * 2013-03-16 2013-06-19 中铁二院工程集团有限责任公司 Excavation, consolidation and protection structure of granular mixture accumulation slope cutting
CN103821188A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 High-speed railway embankment offset correction structure

Similar Documents

Publication Publication Date Title
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN202899165U (en) T-shaped wallboard type retaining wall structure of highway subgrade
CN102425082A (en) Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN203855974U (en) Three-dimensional-drainage flexible geocell eco-bag side slope
CN203429660U (en) Stereo stiffened rigid-flexible combined ecological retaining wall
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN103952986A (en) Load-shedding type rigid culvert structure
CN203462484U (en) Existing retaining wall reinforcement structure
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN103046543A (en) Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
CN103855650A (en) Special construction method by utilizing electricity jacking pipe
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
CN104988949A (en) Soil layer pile plate buttress combined retaining wall
CN203229960U (en) Granular mixture accumulation slope cutting excavation strengthening and protective structure
CN201635745U (en) Ribbed-arch multi-arch tunnel
CN103321181A (en) Method for damming by hydraulic-filling full tailings to geomembrane bag woven by using split film yarns
CN203547763U (en) High backfilling anti-sliding open cut tunnel structure
CN203284795U (en) Buttressed retaining wall with anchor board
CN204491683U (en) A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging
CN107090804A (en) A kind of flexible net debris flow dam and its construction method
CN204356606U (en) The light-duty road structure in abrupt slope
CN103821164B (en) Mountain area cheuch backfill tunnel construction
CN204325837U (en) Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170116

Address after: 100070 Fuxing Road, Beijing, Haidian District, No. 10

Patentee after: CHINA RAILWAY Corp.

Patentee after: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd.

Address before: 610031 Sichuan Province, Chengdu City Kam Tong Road No. 3

Patentee before: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131009