CN203229960U - Granular mixture accumulation slope cutting excavation strengthening and protective structure - Google Patents
Granular mixture accumulation slope cutting excavation strengthening and protective structure Download PDFInfo
- Publication number
- CN203229960U CN203229960U CN 201320121223 CN201320121223U CN203229960U CN 203229960 U CN203229960 U CN 203229960U CN 201320121223 CN201320121223 CN 201320121223 CN 201320121223 U CN201320121223 U CN 201320121223U CN 203229960 U CN203229960 U CN 203229960U
- Authority
- CN
- China
- Prior art keywords
- bulk solid
- reinforcement
- slip casting
- steel bar
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
A granular mixture accumulation slope cutting excavation strengthening and protective structure comprises reinforced concrete strengthening piles (10), reinforced concrete soil guarding plates (20), composite drainage networks (21) and slip casting steel floral pipes (3); the reinforced concrete strengthening piles (10) are arranged at the excavated cutting foot along the longitudinal direction of a route at intervals; the reinforced concrete soil guarding plates (20) are respectively arranged between two adjacent reinforced concrete strengthening piles (10); the composite drainage networks (21) are arranged behind the reinforced concrete soil guarding plates (20); the slip casting steel floral pipes (3) are arranged on the upper slope side, the lower slope side and among the piles at intervals; the slip casting steel floral pipes and the surrounded granular mixtures are formed into slip casting strengthening bodies through slip casting.
Description
Technical field
The utility model relates to the excavation reinforcement protection structure that bulk solid is piled up sloping cutting excavation ruggedized construction, particularly fine grained bulk solid such as sand-sliding slope cutting.
Background technology
Western China particularly Sichuan-Tibet highway be distributed with a large amount of bulk solid along the line and pile up the slope, as sand-sliding slope, when the highway construction of building railway engineering particularly, owing to be subjected to the control of conditions such as line style and longitudinal gradient, the bulk solid that some can occur is piled up sloping cutting engineering, owing to the bulk solid deposit that resembles the sand-sliding slope class has shot, domatic source is measured greatly, is difficult to excavation and propped up the characteristics such as protecting difficulty of keeping off, when the road engineering was passed through with the cutting form, a kind of bulk solid of active demand was piled up sloping cutting excavation reinforcement protection structure.
The utility model content
Technical problem to be solved in the utility model provides a kind of bulk solid and piles up sloping cutting excavation reinforcement protection structure, pile up the slope because of excavation and slope reinforcement protection difficult problem that cutting excavation causes to solve bulk solid, effectively guarantee to excavate the stable of cutting engineering.
The technical scheme that its technical problem that solves the utility model adopts is as follows:
Bulk solid of the present utility model is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: the steel bar concrete reinforcement stake is arranged at excavation cutting toe along circuit longitudinal separation; The steel concrete breast boards is arranged between the adjacent two steel bar concrete reinforcement stakes; Composite drainage network, be arranged at the steel concrete breast boards after; Slip casting spray of molten steel pipe is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake, by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
The beneficial effects of the utility model are, solve bulk solid effectively and piled up the slope reinforcement protection difficult problem that the slope causes because of cutting excavation, simple in structure, easy construction, can guarantee effectively that bulk solid piles up stable behind safety in the sloping digging process and the excavation, have wide popularizing application prospect.
Description of drawings
This manual comprises following two width of cloth accompanying drawings:
Fig. 1 is the schematic cross-sectional view that the utility model bulk solid is piled up sloping cutting excavation reinforcement protection structure;
Fig. 2 is the floor map that the utility model bulk solid is piled up sloping cutting excavation reinforcement protection structure.
Member shown in the figure, toponym and corresponding mark: steel bar concrete reinforcement stake 10, steel concrete breast boards 20, composite drainage network 21, slip casting spray of molten steel pipe 30, stablize that rock-soil layer A, bulk solid pile up sloping body B, bulk solid is piled up sloping body direction C.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
See figures.1.and.2, bulk solid of the present utility model is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: steel bar concrete reinforcement stake 10 is arranged at excavation cutting toe along circuit longitudinal separation; Steel concrete breast boards 20 is arranged between the adjacent two steel bar concrete reinforcement stakes 10; Composite drainage network 21, be arranged at steel concrete breast boards 20 after; Slip casting spray of molten steel pipe 3 is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake 10, by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
The utility model utilizes steel bar concrete reinforcement stake 10 to bear soil pressure and sliding force that bulk solid is piled up sloping cutting top bulk solid, utilize block bulk solid between 10 of steel bar concrete reinforcement stakes of breast boards 20, utilize composite drainage network 21 rows, and prevent that breast boards 20 back bulk solids from being taken out of by underground infiltration and phenomenon occurs emptying, utilize 30 pairs of bulk solids of slip casting spray of molten steel pipe to carry out grouting and reinforcing and form the grouting and reinforcing body, guarantee stablizing in steel bar concrete reinforcement stake 10 digging processs, avoid occurring in the work progress hole that collapses.This structure has solved the slope reinforcement protection difficult problem that bulk solid is piled up sloping cutting excavation difficulty and therefore caused effectively, simple in structure, easy construction, can guarantee effectively that bulk solid piles up stable behind safety in the sloping digging process and the excavation, have wide popularizing application prospect.
The grouting and reinforcing body that described slip casting spray of molten steel pipe 30 slip castings form should be connected to form integral body, usually should be greater than 5m at the uphill side grouting and reinforcing body width of steel bar concrete reinforcement stake 10, and the descending side should be greater than 2m, and reinforcement depth is piled up the degree of depth greater than bulk solid.
Described steel bar concrete reinforcement stake 10 bottoms are embedded in stablizes under the bulk solid in the rock-soil layer, and pile spacing usually should be less than 6m.Steel concrete breast boards 20 should adopt reinforced concrete prefabricated construction, connects by the embedded bar that is arranged in the steel bar concrete reinforcement stake 10, and the lap width of its two ends and steel bar concrete reinforcement stake 10 is not less than 30cm.
Steel bar concrete reinforcement stake 10 should be adopted every 2 piles job-hopping excavation, excavation stake well arranges a joint fore shaft or retaining wall carries out a well protection and at steel concrete breast boards 20 the pre-buried connecting reinforcement in position is set every 1m, should strengthen the observation of bulk solid slope deforming in the digging process and carry out the emergent precautionary measures.Steel bar concrete reinforcement stake 10 construction finish reach design strength 80% after can excavate preceding a ground body, the each cutting depth of ground body should not be greater than 2m before the stake, the timely construction reinforced bar concrete breast boards 20 of palpus behind the excavation.
The above the utility model bulk solid that just explains through diagrams is piled up some principles of sloping cutting excavation reinforcement protection structure, be not be the utility model to be confined to shown in and in described concrete structure and the scope of application, so every corresponding modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.
Claims (4)
1. bulk solid is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that it comprises: steel bar concrete reinforcement stake (10) is arranged at excavation cutting toe along circuit longitudinal separation; Steel concrete breast boards (20) is arranged between the adjacent two steel bar concrete reinforcement stakes (10); Composite drainage network (21), be arranged at steel concrete breast boards (20) after; Slip casting spray of molten steel pipe (3) is arranged at intervals between uphill side, descending side and the stake of steel bar concrete reinforcement stake (10), by slip casting and the grouting and reinforcing of bulk solid formation on every side body.
2. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: the grouting and reinforcing body that described slip casting spray of molten steel pipe (30) slip casting forms is connected to form integral body, at the uphill side grouting and reinforcing body width of steel bar concrete reinforcement stake (10) greater than 5m, the descending side is greater than 2m, and reinforcement depth is piled up the degree of depth greater than bulk solid.
3. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: described steel bar concrete reinforcement stake (10) bottom is embedded in stablizes under the bulk solid in the rock-soil layer, and pile spacing is less than 6m.
4. bulk solid as claimed in claim 1 is piled up sloping cutting excavation reinforcement protection structure, it is characterized in that: described steel concrete breast boards (20) connects by the embedded bar that is arranged in the steel bar concrete reinforcement stake (10), and the lap width of its two ends and steel bar concrete reinforcement stake (10) is not less than 30cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320121223 CN203229960U (en) | 2013-03-16 | 2013-03-16 | Granular mixture accumulation slope cutting excavation strengthening and protective structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320121223 CN203229960U (en) | 2013-03-16 | 2013-03-16 | Granular mixture accumulation slope cutting excavation strengthening and protective structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203229960U true CN203229960U (en) | 2013-10-09 |
Family
ID=49286093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320121223 Expired - Lifetime CN203229960U (en) | 2013-03-16 | 2013-03-16 | Granular mixture accumulation slope cutting excavation strengthening and protective structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203229960U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161170A (en) * | 2013-03-16 | 2013-06-19 | 中铁二院工程集团有限责任公司 | Excavation, consolidation and protection structure of granular mixture accumulation slope cutting |
CN103821188A (en) * | 2014-01-28 | 2014-05-28 | 中铁二院工程集团有限责任公司 | High-speed railway embankment offset correction structure |
-
2013
- 2013-03-16 CN CN 201320121223 patent/CN203229960U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161170A (en) * | 2013-03-16 | 2013-06-19 | 中铁二院工程集团有限责任公司 | Excavation, consolidation and protection structure of granular mixture accumulation slope cutting |
CN103821188A (en) * | 2014-01-28 | 2014-05-28 | 中铁二院工程集团有限责任公司 | High-speed railway embankment offset correction structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410167B (en) | Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method | |
CN106499413B (en) | A kind of Shallow-buried section tunnel stratum consolidation construction method | |
CN203603105U (en) | Wall plate type ecological retaining wall bank protection structure | |
CN202899165U (en) | T-shaped wallboard type retaining wall structure of highway subgrade | |
CN102425082A (en) | Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway | |
CN203855974U (en) | Three-dimensional-drainage flexible geocell eco-bag side slope | |
CN203429660U (en) | Stereo stiffened rigid-flexible combined ecological retaining wall | |
CN103334450B (en) | Construction method of pile precast slab retaining wall with drainage ditch | |
CN103952986A (en) | Load-shedding type rigid culvert structure | |
CN203462484U (en) | Existing retaining wall reinforcement structure | |
CN104674863A (en) | Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range | |
CN103046543A (en) | Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement | |
CN103855650A (en) | Special construction method by utilizing electricity jacking pipe | |
CN108487234B (en) | Construction method of cast-in-situ pile plate type platform wall | |
CN104988949A (en) | Soil layer pile plate buttress combined retaining wall | |
CN203229960U (en) | Granular mixture accumulation slope cutting excavation strengthening and protective structure | |
CN201635745U (en) | Ribbed-arch multi-arch tunnel | |
CN103321181A (en) | Method for damming by hydraulic-filling full tailings to geomembrane bag woven by using split film yarns | |
CN203547763U (en) | High backfilling anti-sliding open cut tunnel structure | |
CN203284795U (en) | Buttressed retaining wall with anchor board | |
CN204491683U (en) | A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging | |
CN107090804A (en) | A kind of flexible net debris flow dam and its construction method | |
CN204356606U (en) | The light-duty road structure in abrupt slope | |
CN103821164B (en) | Mountain area cheuch backfill tunnel construction | |
CN204325837U (en) | Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170116 Address after: 100070 Fuxing Road, Beijing, Haidian District, No. 10 Patentee after: CHINA RAILWAY Corp. Patentee after: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd. Address before: 610031 Sichuan Province, Chengdu City Kam Tong Road No. 3 Patentee before: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131009 |