CN203222265U - Intelligent air cannon - Google Patents

Intelligent air cannon Download PDF

Info

Publication number
CN203222265U
CN203222265U CN 201220677776 CN201220677776U CN203222265U CN 203222265 U CN203222265 U CN 203222265U CN 201220677776 CN201220677776 CN 201220677776 CN 201220677776 U CN201220677776 U CN 201220677776U CN 203222265 U CN203222265 U CN 203222265U
Authority
CN
China
Prior art keywords
cylinder
jet pipe
controlling device
piston
electromagnetic valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220677776
Other languages
Chinese (zh)
Inventor
武新宽
于亚康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Original Assignee
PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PUYANG YALI MACHINERY MANUFACTURE CO Ltd filed Critical PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Priority to CN 201220677776 priority Critical patent/CN203222265U/en
Application granted granted Critical
Publication of CN203222265U publication Critical patent/CN203222265U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an air cannon, in particular to an intelligent air cannon, wherein an air cannon and an intelligent control device are combined as a whole. The intelligent control over the air cannon is realized remotely by the intelligent control device. After an electromagnetic valve is opened, gases in a cylinder are discharged out of the cylinder through the opened electromagnetic valve. Pressures at the two ends of a piston are out of balance, so that the piston is moved inside the cylinder. The port of a jet pipe is unlatched and then high-pressure gases in a gas tank are rapidly released through the jet pipe to form a spray explosion. The intelligent air cannon is simple in structure and convenient in operation, wherein the air cannon and the intelligent control device are combined as a whole. In this way, the automatic control over the air cannon and the automatic operation of the air cannon can be realized. Meanwhile, the manpower is saved to a large extent.

Description

The intelligent air big gun
Technical field
The utility model relates to a kind of air bubble, relates in particular to a kind of intelligent air big gun.
Background technology
Air bubble, another name air flow-aid device, Arch-Breaking Device, Cleaning device for pipeline, be the isolated plant of phenomenons such as material arch camber, the feed bin that prevents and eliminate all kinds feed bin, hopper, tube furcation place stops up, sticking wall, delay, be applicable to cartridge type feed bin, hopper, pipeline and flat windrow that various steels, cement concrete and other material are made; Air bubble is installed the place that eminence or people be difficult for to arrive in actual applications often, so the unusual trouble of operating, because some equipment are bigger, higher, the position that air bubble is installed is also higher, and operating personal is operated air bubble aloft, also has very big danger.
Summary of the invention
The purpose of this utility model is to change the deficiency of existing air bubble technology, and provide a kind of can be from master control, the intelligent air big gun of operation automatically.
The technical scheme that the utility model adopts:
The intelligent air big gun, comprise storage tank, built in gas tank has pneumatic release assembly, the storage tank periphery is provided with air inlet pipe, be installed with air induction hose on the air inlet pipe, the air induction hose end is equipped with ball valve, on the storage tank periphery relatively both sides also respectively level be provided with jet pipe and exhausr port, pneumatic release assembly is between jet pipe and exhausr port, exhaust ports is provided with electromagnetic valve, electromagnetic valve is positioned at the exhausr port outside, pneumatic release assembly comprises the cylinder coaxial with jet pipe, cylinder bottom fixedly has retracing spring, be provided with piston in the cylinder, piston one end cooperates with the cylinder bottom roof pressure by retracing spring, piston other end shutoff jet pipe port, described intelligent air big gun also includes intelligence controlling device, intelligence controlling device is connected with line solenoid valve by cable, intelligence controlling device ACTIVE CONTROL electromagnetic valve is opened, gas in the cylinder is discharged by the electromagnetic valve of opening, and it is mobile in cylinder that the piston pressure at two ends is unbalance, opens the jet pipe port, storage tank inner high voltage gas discharges fast by jet pipe, and it is quick-fried to form spray.
Described intelligence controlling device is control box or the control housing that master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver are installed, master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), the fracture signal receiver of appeal link together by electric wire, form an intelligence control circuit.
Control button also is installed in the described intelligence controlling device, control button, change-over swith, indicator lamp, master cock link together by electric wire, form a manual control circuit, can realize conversion between intelligence control circuit and the manual control circuit by change-over swith.
The DCS interface also is installed in the described intelligence controlling device, the DCS interface also is installed in the intelligence controlling device, master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver, control button, DCS interface link together by electric wire, by the DCS interface intelligent air big gun is connected with computing machine, realizes by computing machine the intelligent air big gun being controlled.
The beneficial effects of the utility model: the utility model is simple in structure, and is easy to operate, and intelligence controlling device and air bubble are combined, realize air bubble from master control, operation automatically, saved manpower to a great extent.
Description of drawings
Fig. 1 is the constructional drawing of the utility model intelligent air big gun.
The specific embodiment
As shown in the figure, the intelligent air big gun, comprise storage tank 1, be provided with pneumatic release assembly 9 in the storage tank 1, storage tank 1 periphery is provided with air inlet pipe 3, be installed with air induction hose 4 on the air inlet pipe 3, air induction hose 4 ends are equipped with ball valve 5, on storage tank 1 periphery relatively both sides also respectively level be provided with jet pipe 6 and exhausr port 7, pneumatic release assembly is between jet pipe 6 and exhausr port 7, exhausr port 7 places are provided with electromagnetic valve 8, electromagnetic valve 8 is positioned at exhausr port 7 outsides, pneumatic release assembly 9 comprises the cylinder 10 coaxial with jet pipe 6, retracing spring 11 is fixedly arranged at cylinder 10 bottoms, be provided with piston 12 in the cylinder 10, piston 12 1 ends cooperate with cylinder 10 bottom roof pressures by retracing spring 11, piston 12 other end shutoff jet pipes 6 ports, described intelligent air big gun also comprises intelligent control box 2, intelligent control box 2 is connected with electromagnetic valve 8 by cable, and intelligent control box 2 ACTIVE CONTROL electromagnetic valves 8 are opened, and the gas in the cylinder 10 is discharged by the electromagnetic valve of opening 8, it is mobile in cylinder 10 that piston 12 pressure at two ends are unbalance, open jet pipe 6 ports, storage tank 1 inner high voltage gas discharges fast by jet pipe 6, and it is quick-fried to form spray.
Above-mentioned intelligent control box 2 is equipped with master cock 16, indicator lamp 14, change-over swith 15, time relay 17, programmable logic controller (PLC) 18, fracture signal receiver 19, the master cock 16, indicator lamp 14, change-over swith 15, time relay 17, programmable logic controller (PLC) 18, fracture signal receiver 19 of appeal links together by electric wire, forms an intelligence control circuit.
In the above-mentioned intelligent control box 2 control button 13 is installed also, control button 13, change-over swith 15, indicator lamp 14, master cock 16 link together by electric wire, form a manual control circuit, can realize conversion between intelligence control circuit and the manual control circuit by change-over swith 15.
In the above-mentioned intelligent control box 2 DCS interface 20 is installed also, master cock 16, indicator lamp 14, change-over swith 15, time relay 17, programmable logic controller (PLC) 18, fracture signal receiver 19, control button 13, DCS interface 20 link together by electric wire, by DCS interface 20 the intelligent air big gun is connected with computing machine, realizes by computing machine the intelligent air big gun being controlled.
After air bubble installs as required, open intelligence control circuit in the intelligent control box 2 by change-over swith 15, technical personnel is according to the needs of actual conditions, the intelligent air big gun is carried out program setting, or the program that will weave is in advance implanted in the intelligent control box 2, or by DCS interface 20 the intelligent air big gun is connected with computing machine, by computing machine the intelligent air big gun is write or implants suitable procedure.
During use, retracing spring 11 promotes piston 12 sealing jet pipes 6 ports, open ball valve 5, gas is by air induction hose 4, air inlet pipe 3 is full of storage tank 1, this moment, air bubble was in arm-to-arm, when intelligent control box 2 receives from impacting feed bin, hopper, behind the fracture signal of pipeline, signal is carried out intelligent decision, after reaching the quick-fried condition of spray, intelligent control box 2 sends electric signal by cable to electromagnetic valve 8, electromagnetic valve 8 is opened, gas is discharged by electromagnetic valve 8 in the cylinder 10, cylinder 10 internal pressures reduce, and storage tank 1 internal pressure is constant, and piston 12 two ends form difference of pressure, storage tank 1 inner high voltage gas promotes piston 12 quick travel, open jet pipe 6 openings, storage tank 1 inner high voltage gas sprays fast by jet pipe 6 and impacts feed bin, hopper, the material arch camber at tube furcation place, feed bin stops up, sticking wall, be detained, realize feed bin, hopper, the cleaning mediation of pipeline.
When needs manually control to feed bin, hopper, when the tube furcation place clears up, technical personnel is opened the manual control circuit of intelligent control box 2 inside by change-over swith 15, send electric signal by control button 13 control intelligent control box 2 to electromagnetic valve 8, opens solenoid valve 8 is discharged gas in the cylinder 10, and piston 12 is under the pressure effect of storage tank 1 inner high voltage gas, mobile, open jet pipe 6 openings, storage tank 1 inner high voltage gas discharges fast, realizes that the air bubble spray is quick-fried.
By DCS interface 20 the intelligent air big gun is connected with computing machine, realization is directly carried out programming or implantation to intelligent control box 2 by computing machine, also can directly send electric signal by computer controlled intelligent control box 2 to electromagnetic valve 8, opens solenoid valve 8 realizes the control to air bubble.
The Based Intelligent Control cabinet is that the many groups of set master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver, control button, DCS interface are in the control housing device of one, can be connected with a plurality of electromagnetic valves simultaneously by cable, control many air bubbles simultaneously, its principle of work is identical with intelligent control box.

Claims (4)

1. intelligent air big gun, comprise storage tank, built in gas tank has pneumatic release assembly, the storage tank periphery is provided with air inlet pipe, be installed with air induction hose on the air inlet pipe, the air induction hose end is equipped with ball valve, on the storage tank periphery relatively both sides also respectively level be provided with jet pipe and exhausr port, pneumatic release assembly is between jet pipe and exhausr port, exhaust ports is provided with electromagnetic valve, electromagnetic valve is positioned at the exhausr port outside, pneumatic release assembly comprises the cylinder coaxial with jet pipe, cylinder bottom fixedly has retracing spring, be provided with piston in the cylinder, piston one end cooperates with the cylinder bottom roof pressure by retracing spring, piston other end shutoff jet pipe port, it is characterized in that: described intelligent air big gun also comprises intelligence controlling device, intelligence controlling device is connected with line solenoid valve by cable, intelligence controlling device ACTIVE CONTROL electromagnetic valve is opened, gas in the cylinder is discharged by the electromagnetic valve of opening, and it is mobile in cylinder that the piston pressure at two ends is unbalance, opens the jet pipe port, storage tank inner high voltage gas discharges fast by jet pipe, and it is quick-fried to form spray.
2. intelligent air big gun according to claim 1, it is characterized in that: described intelligence controlling device is control box or the control housing that master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver are installed, above-mentioned master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver link together by electric wire, form an intelligence control circuit.
3. intelligent air big gun according to claim 1, it is characterized in that: control button also is installed in the intelligence controlling device, and control button, change-over swith, indicator lamp, master cock link together by electric wire, form a manual control circuit.
4. according to claim 1 or 2 or 3 described intelligent air big guns, it is characterized in that: the DCS interface also is installed in the intelligence controlling device, and master cock, indicator lamp, change-over swith, time relay, programmable logic controller (PLC), fracture signal receiver, control button, DCS interface link together by electric wire.
CN 201220677776 2012-12-11 2012-12-11 Intelligent air cannon Expired - Fee Related CN203222265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220677776 CN203222265U (en) 2012-12-11 2012-12-11 Intelligent air cannon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220677776 CN203222265U (en) 2012-12-11 2012-12-11 Intelligent air cannon

Publications (1)

Publication Number Publication Date
CN203222265U true CN203222265U (en) 2013-10-02

Family

ID=49249277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220677776 Expired - Fee Related CN203222265U (en) 2012-12-11 2012-12-11 Intelligent air cannon

Country Status (1)

Country Link
CN (1) CN203222265U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103600938A (en) * 2013-10-18 2014-02-26 河北省电力勘测设计研究院 Automatic coal dredging device for raw coal conveying system in thermal power plant
CN104996311A (en) * 2015-07-23 2015-10-28 郑州大学 Visual scare connection automatic training apparatus
CN106613577A (en) * 2017-01-11 2017-05-10 青海中水数易信息科技有限责任公司 Air-cannon artificial rainfall device based on liquid silver iodide
CN106718431A (en) * 2017-01-11 2017-05-31 青海中水数易信息科技有限责任公司 Gas silver iodide air bubble artificial rain device
CN109238576A (en) * 2018-09-29 2019-01-18 濮阳市亚利机械制造有限公司 A kind of pressure testing/detecting device suitable for air bubble

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103600938A (en) * 2013-10-18 2014-02-26 河北省电力勘测设计研究院 Automatic coal dredging device for raw coal conveying system in thermal power plant
CN103600938B (en) * 2013-10-18 2017-01-11 河北省电力勘测设计研究院 Automatic coal dredging device for raw coal conveying system in thermal power plant
CN104996311A (en) * 2015-07-23 2015-10-28 郑州大学 Visual scare connection automatic training apparatus
CN106613577A (en) * 2017-01-11 2017-05-10 青海中水数易信息科技有限责任公司 Air-cannon artificial rainfall device based on liquid silver iodide
CN106718431A (en) * 2017-01-11 2017-05-31 青海中水数易信息科技有限责任公司 Gas silver iodide air bubble artificial rain device
CN109238576A (en) * 2018-09-29 2019-01-18 濮阳市亚利机械制造有限公司 A kind of pressure testing/detecting device suitable for air bubble

Similar Documents

Publication Publication Date Title
CN203222265U (en) Intelligent air cannon
CN101962125B (en) Positive and negative pressure integrated storehouse pump
CN104418092B (en) A kind of powder wind send device
CN211894499U (en) Intelligent anti-blocking device of rectangular flat-bottom feeding bin
CN108786660A (en) A kind of continuous automatic charging device of self-cleaning powder
CN203222264U (en) Remote-control air cannon
CN203222262U (en) Automatic air canon
CN109524258B (en) Isobaric vacuumizing and inflating device of power switch and control method thereof
CN202414692U (en) Device for remotely conveying powdered active carbon
CN202449449U (en) Powder transfer tank assembly and powder truck
CN201721840U (en) Novel air shot
CN203877256U (en) Blockage removal device for cylindrical flat-bottom reinforced concrete bin
CN203548424U (en) Oil returning-gas returning system for CNG (compressed natural gas) gas station
CN202893181U (en) Desulphurization device in circulating fluidized bed boiler
CN208951675U (en) A kind of industrial gasses automatic charging device
CN208465883U (en) A kind of dustless automatic charging reactor tank
CN201862893U (en) Balanced pressure powder spraying device
CN204150708U (en) A kind of defeated ash silo pump control system
CN101293598B (en) Combined cone pump feed method and apparatus for pneumatic transmission
CN201224624Y (en) Combined type cone pump for pneumatic convey
CN201658968U (en) Adsorbent charging device
CN205771997U (en) The error prevention device of the feed pipe in switching feed system
CN205262199U (en) A settle and expect device for sintering machine platform truck
CN214679748U (en) Device for realizing centralized discharge of residual water of fire engine
CN203450851U (en) Fine-powder material conveying system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20141211

EXPY Termination of patent right or utility model