CN203213099U - Occluded bored pile - Google Patents
Occluded bored pile Download PDFInfo
- Publication number
- CN203213099U CN203213099U CN 201320225291 CN201320225291U CN203213099U CN 203213099 U CN203213099 U CN 203213099U CN 201320225291 CN201320225291 CN 201320225291 CN 201320225291 U CN201320225291 U CN 201320225291U CN 203213099 U CN203213099 U CN 203213099U
- Authority
- CN
- China
- Prior art keywords
- bored
- bored pile
- pile
- piles
- interlock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320225291 CN203213099U (en) | 2013-04-28 | 2013-04-28 | Occluded bored pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320225291 CN203213099U (en) | 2013-04-28 | 2013-04-28 | Occluded bored pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203213099U true CN203213099U (en) | 2013-09-25 |
Family
ID=49202647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320225291 Withdrawn - After Issue CN203213099U (en) | 2013-04-28 | 2013-04-28 | Occluded bored pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203213099U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215949A (en) * | 2013-04-28 | 2013-07-24 | 中铁上海工程局有限公司 | Snap-in cast-in-place bored pile and construction method thereof |
-
2013
- 2013-04-28 CN CN 201320225291 patent/CN203213099U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215949A (en) * | 2013-04-28 | 2013-07-24 | 中铁上海工程局有限公司 | Snap-in cast-in-place bored pile and construction method thereof |
CN103215949B (en) * | 2013-04-28 | 2016-02-24 | 中铁上海工程局集团有限公司 | A kind of occlusion bored pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN203729306U (en) | Anti-slide pile and soil retaining plate supporting structure | |
CN202830942U (en) | Combined supporting structure with anchor cables and cast-in-situ bored piles | |
CN203096693U (en) | Interlocking type ecological slope protection building block | |
CN207646746U (en) | A kind of arch interlocking pile formula foundation pit supporting construction | |
CN202227368U (en) | Underground groove structured anti-floating structure | |
CN203939029U (en) | Gantry type supporting and protection structure when excavate the same period wall both sides, soil strip hole | |
CN105256811B (en) | Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function | |
CN203213099U (en) | Occluded bored pile | |
CN102808421A (en) | Telescopic concrete precast square culvert | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN105696701B (en) | A kind of suitable slope shear wall building development platform and its construction method | |
CN205012352U (en) | Sheet pile supporting construction with stagnant water function | |
CN205188976U (en) | Drag -line double row pile supporting construction | |
CN201696055U (en) | Multi-span flat arch tunnel structure | |
CN103215949B (en) | A kind of occlusion bored pile and construction method thereof | |
CN203530921U (en) | Water-permeable pile foundation spur dike | |
CN203429645U (en) | Slope support structure assembly | |
CN203782760U (en) | Self-adjusting anti-floating structure of U-shaped groove structure | |
CN202370001U (en) | Shoring structure | |
CN202298627U (en) | Foundation pit supporting structure | |
CN202969339U (en) | Building block for dry piled retaining wall | |
CN202359564U (en) | Arch steel sheet pile supporting structure | |
CN207092105U (en) | Foundation pit support system | |
CN205296390U (en) | In same direction as sloping shear force wall building development platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC |
|
CP03 | Change of name, title or address |
Address after: 200346 Shanghai Road, Zhabei District, No. three, No. 272 Patentee after: Shanghai Civil Engineering Co., Ltd. of Crec Address before: 200346, No. three, No. 272, Zhabei District Road, Zhabei District, Shanghai Patentee before: Shanghai Civil Engineering Co., Ltd. of CREC |
|
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP FI Free format text: FORMER OWNER: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC Effective date: 20150615 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150615 Address after: 530001, 7 building, On Tai Building, No. 56 Sau Road, the Guangxi Zhuang Autonomous Region, Nanning Patentee after: China Railway Shanghai Engineering Bureau Group Fifth Engineering Co., Ltd. Address before: 200346 Shanghai Road, Zhabei District, No. three, No. 272 Patentee before: Shanghai Civil Engineering Co., Ltd. of Crec |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20130925 Effective date of abandoning: 20160224 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |