CN203200808U - Excavator platform with novel structure - Google Patents

Excavator platform with novel structure Download PDF

Info

Publication number
CN203200808U
CN203200808U CN 201320228423 CN201320228423U CN203200808U CN 203200808 U CN203200808 U CN 203200808U CN 201320228423 CN201320228423 CN 201320228423 CN 201320228423 U CN201320228423 U CN 201320228423U CN 203200808 U CN203200808 U CN 203200808U
Authority
CN
China
Prior art keywords
platform
excavator
novel structure
excavators
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320228423
Other languages
Chinese (zh)
Inventor
黄升
甘仕锦
段勇
李才斌
严茂林
陈洁玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Yuchai Heavy Industry Co Ltd
Original Assignee
Guangxi Yuchai Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Yuchai Heavy Industry Co Ltd filed Critical Guangxi Yuchai Heavy Industry Co Ltd
Priority to CN 201320228423 priority Critical patent/CN203200808U/en
Application granted granted Critical
Publication of CN203200808U publication Critical patent/CN203200808U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an excavator platform with a novel structure. The excavator platform is formed by a left platform, a right platform and a platform body, wherein the left platform and the right platform are positioned through a tool and are welded to the platform body into a whole, and a beam of the excavator platform is divided into three sections. By means of the excavator platform, rhythmic and assembly line production is achieved, welding deformation and welding error can be corrected in a follow-up process in which the platforms are welded to form the novel structure, and thus the excavator platform with the novel structure is optimized.

Description

A kind of Platform of Excavators of new structure
Technical field
The utility model relates to a kind of Platform of Excavators of new structure, is applicable to the middle-size and small-size excavator below 6.0 tons.
Background technology
In the situation that the revolving platform of excavator functional structure is constant, for the quality of production, cost of production, the production efficiency requirement of satisfying platform, need to carry out the welded construction process optimization to platform, make the quality of production, cost of production, production efficiency maximization.Platform structure all uses slab, middle plate in a large number, and the complex structure productive temp of part own is difficult to reasonable arrangement.Platform is large and the peripheral component material thickness is little as area, and the core component material thickness is large, and welding is distortion easily, and the difficulty of welding post-equalization is large.Design the part relative separation of a kind of dual-side parts and material thickness, so that middle, two side portions material thickness of slab changes relatively is all little, can be greatly improved to welding handicraft product quality.How to design and a kind ofly meet good process and superior in quality platform is the huge difficult problem that we run into.
Summary of the invention
The utility model just provides a kind of Platform of Excavators of new structure, can make the relative variation of thickness of slab of each assembly of platform little, and welding deformation is easily controlled, the productive temp reasonable arrangement.Can allow simultaneously welding deformation, welding error revise follow-up being welded in the new construction platform, thereby draw the new construction platform of more optimizing.
The technical solution adopted in the utility model is: a kind of Platform of Excavators of new structure, this platform is welded into whole platform by tool locating is fixing with main platform body by left part platform, right part platform.
The beam design of this platform becomes 3 sections.
During production, the thick left part platform that is more or less the same of side plate, right part platform and platform body portion are not designed to three parts, and are original beam design that runs through whole platform three sections.Carry out respectively welding equipment, welding and process three large parts, then three large parts are carried out tool locating and correction and are welded into a new Platform of Excavators.
Outstanding advantages of the present utility model is:
The platform relative deformation of producing is little, the easy reasonable arrangement of productive temp, easily realizes pipelining production, and the implementation platform new construction, and its function is not any change.
Description of drawings
Fig. 1 is the structural representation of traditional Platform of Excavators.
Fig. 2 is the structural representation of the Platform of Excavators of new structure described in the utility model.
Fig. 3 is the left part platform structure schematic diagram of the Platform of Excavators of new structure described in the utility model.
Fig. 4 is the main platform structural representation of the Platform of Excavators of new structure described in the utility model.
Fig. 5 is the right part platform structure schematic diagram of the Platform of Excavators of new structure described in the utility model.
The specific embodiment
Below by drawings and Examples the technical solution of the utility model is described further.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.The Platform of Excavators of new structure described in the utility model, concrete structure is: the beam design of this platform 1 becomes 3 sections, as three large parts in left part platform 2, main platform 3, the right part platform 4, described left part platform 2, right part platform 4 are welded into whole platform by tool locating is fixing with main platform 3.
Be exactly to allow error and the distortion of parts welding be proofreaied and correct elimination in the process fixing and location.The weld seam of the process that three large parts are welded to each other is few, and strength of parts is good.This structure welding reduces final welding link weld seam, and the process of three large component combinations is the processes of reorientating and proofreading and correct.Can revise well distortion and the foozle of part.

Claims (2)

1. the Platform of Excavators of a new structure is characterized in that, this platform is welded into whole platform by tool locating is fixing with main platform body by left part platform, right part platform.
2. the Platform of Excavators of new structure according to claim 1 is characterized in that, the beam design of this platform becomes 3 sections.
CN 201320228423 2013-04-28 2013-04-28 Excavator platform with novel structure Expired - Fee Related CN203200808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320228423 CN203200808U (en) 2013-04-28 2013-04-28 Excavator platform with novel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320228423 CN203200808U (en) 2013-04-28 2013-04-28 Excavator platform with novel structure

Publications (1)

Publication Number Publication Date
CN203200808U true CN203200808U (en) 2013-09-18

Family

ID=49144932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320228423 Expired - Fee Related CN203200808U (en) 2013-04-28 2013-04-28 Excavator platform with novel structure

Country Status (1)

Country Link
CN (1) CN203200808U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114406620A (en) * 2022-01-27 2022-04-29 江苏润邦重工股份有限公司 Production and manufacturing process of main steel structural member of hydraulic material grabbing machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114406620A (en) * 2022-01-27 2022-04-29 江苏润邦重工股份有限公司 Production and manufacturing process of main steel structural member of hydraulic material grabbing machine
CN114406620B (en) * 2022-01-27 2023-09-08 江苏润邦重工股份有限公司 Production and manufacturing process of main steel structural part of hydraulic material grabbing machine

Similar Documents

Publication Publication Date Title
CN204645024U (en) Pile foundation steel bar cage skeleton processing moulding bed
CN102009565A (en) Steel ring integral wheel rim
CN104029017A (en) Wind tunnel flow deflector forming device
CN103722297A (en) Compound welding equipment and manufacturing technology for hollow-type transverse diaphragm of steel box beam
CN104438944B (en) A kind of process for stamping of vehicle fuel tank cap inner panel
CN203200808U (en) Excavator platform with novel structure
CN106964945A (en) A kind of production technology of guide wheel wheel blank
CN103418751B (en) A kind of control method of large-scale gas turbine exhaust casing sand cores of castings size
CN203900870U (en) Wind tunnel deflector molding device
CN203888594U (en) Automobile skylight reinforcing plate assembly
CN203863265U (en) Welding and positioning device for arm rack
CN203567473U (en) Forklift drive axle integrated axle housing assembly
CN203113773U (en) Concrete plastic steel internal corner pattern plate
CN104088322A (en) Miniature excavator rotation frame
CN201871870U (en) Welding spot forming clamp for welding ring-shaped stirrups
CN101758121B (en) Universal curved mould with junction box
CN203439040U (en) Integral type end wall plate of railway vehicle
CN204547757U (en) A kind of fuel tank shroud ring limiting stopper, steel band and fuel tank shroud ring
CN204605943U (en) The special longeron splicing component of novel Cowes
CN202852407U (en) Frame structure of engineering machine covering part
CN205869787U (en) Steel band welding carriage
CN201687029U (en) Upper frame for excavator
CN202186841U (en) Electric single beam crane
CN207104173U (en) A kind of steel construction curved arc box beam makes frock moulding bed
CN201626237U (en) Outer rim structural steel used for wheeled construction machinery vehicle without inner tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20160428