CN204645024U - Pile foundation steel bar cage skeleton processing moulding bed - Google Patents
Pile foundation steel bar cage skeleton processing moulding bed Download PDFInfo
- Publication number
- CN204645024U CN204645024U CN201520265655.1U CN201520265655U CN204645024U CN 204645024 U CN204645024 U CN 204645024U CN 201520265655 U CN201520265655 U CN 201520265655U CN 204645024 U CN204645024 U CN 204645024U
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- positioning chamber
- cage skeleton
- steel bar
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses pile foundation steel bar cage skeleton processing moulding bed, it comprises the moulding bed unit of at least two distributions that are in line, described moulding bed unit comprises pedestal, being provided with a cross section in described pedestal is the positioning chamber of arc, the axle center of the positioning chamber in two adjacent moulding bed unit is on same axis, the intrados of positioning chamber is provided with many spacer barss, and described spacer bars is along the circle distribution of the arc section of positioning chamber.By arranging positioning chamber on pedestal, and the locating piece being used for the fixing main muscle of reinforcing cage is set in positioning chamber, fixing after at least two positioning chambers until whole reinforcing cage crossbearer, main muscle directly welds with reinforcement stirrup and forms reinforcement cage skeleton by workman, accurately indirectly, process velocity and the machining accuracy of reinforcement cage skeleton can be improve by the main muscle of spacer bars cage skeleton.
Description
Technical field
The utility model relates to a kind of auxiliary implement in building operations research field, particularly a kind of pile foundation steel bar cage skeleton processing moulding bed.
Background technology
Front pile foundation steel bar cage skeleton mainly adopts artificial reinforcing rib, then on reinforcing rib, adopt chalk or paint to indicate reinforcing cage main reinforce position, artificial being directly welded on by main muscle is finally adopted to strengthen on stirrup, thus complete the processing of reinforcement cage skeleton, but there is main muscle when there is error owing to adopting artificial sign and manually main muscle be welded on reinforcing rib cannot fix, in welding, cause spacing deviation between main muscle larger.
Utility model content
The purpose of this utility model, is to provide a kind of pile foundation steel bar cage skeleton to process moulding bed.
The solution that the utility model solves its technical problem is: pile foundation steel bar cage skeleton processing moulding bed, it comprises the moulding bed unit of at least two distributions that are in line, described moulding bed unit comprises pedestal, being provided with a cross section in described pedestal is the positioning chamber of arc, the axle center of the positioning chamber in two adjacent moulding bed unit is on same axis, the intrados of positioning chamber is provided with many spacer barss, and described spacer bars is along the circle distribution of the arc section of positioning chamber.
As the further improvement of technique scheme, the two ends of described spacer bars are stretched out outside positioning chamber respectively after the extension of both sides.
As the further improvement of technique scheme, described pedestal comprises curved plate and is welded on the angle steel bracing frame below curved plate, and described positioning chamber is located at curved plate inside.
As the further improvement of technique scheme, adjacent two described moulding bed unit are connected and fixed by moulding bed connecting reinforcement.
As the further improvement of technique scheme, also comprise multiple hook be arranged on above described positioning chamber.
As the further improvement of technique scheme, the cross section of described positioning chamber is semicircle.
The beneficial effects of the utility model are: the utility model by arranging positioning chamber on pedestal, and the locating piece being used for the fixing main muscle of reinforcing cage is set in positioning chamber, fixing after at least two positioning chambers until whole reinforcing cage crossbearer, main muscle directly welds with reinforcement stirrup and forms reinforcement cage skeleton by workman, accurately indirectly, process velocity and the machining accuracy of reinforcement cage skeleton can be improve by the main muscle of spacer bars cage skeleton.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present utility model, instead of whole embodiment, and those skilled in the art, under the prerequisite not paying creative work, can also obtain other design schemes and accompanying drawing according to these accompanying drawings.
Fig. 1 is lateral view of the present utility model;
Fig. 2 is the structural representation of the utility model when producing for reinforcement cage skeleton;
Fig. 3 is top view of the present utility model.
Detailed description of the invention
Be clearly and completely described below with reference to embodiment and the accompanying drawing technique effect to design of the present utility model, concrete structure and generation, to understand the purpose of this utility model, characteristic sum effect fully.Obviously; described embodiment is a part of embodiment of the present utility model, instead of whole embodiment, based on embodiment of the present utility model; other embodiments that those skilled in the art obtains under the prerequisite not paying creative work, all belong to the scope of the utility model protection.In addition, all connection/annexations mentioned in literary composition, not singly refer to that component directly connects, and refer to and according to concrete performance, can connect auxiliary by adding or reducing, and form more excellent draw bail.
With reference to Fig. 1 ~ 3, pile foundation steel bar cage skeleton processing moulding bed, it comprises the moulding bed unit 1 of at least two distributions that are in line, described moulding bed unit 1 comprises pedestal 2, the positioning chamber 20 that a cross section is arc is provided with in described pedestal 2, the axle center of the positioning chamber 20 in two adjacent moulding bed unit 1 is on same axis, and the intrados of positioning chamber 20 is provided with many spacer barss 3, and described spacer bars 3 is along the circle distribution of the arc section of positioning chamber 20.
By arranging positioning chamber 20 on the base 2, and the locating piece being used for the fixing main muscle of reinforcing cage is set in positioning chamber 20, fixing after at least two positioning chambers 20 until whole reinforcing cage crossbearer, main muscle directly welds with reinforcement stirrup and forms reinforcement cage skeleton by workman, accurately indirectly, process velocity and the machining accuracy of reinforcement cage skeleton can be improve by the main muscle of spacer bars 3 cage skeleton.
Be further used as preferred embodiment, the two ends of described spacer bars 3 are stretched out outside positioning chamber 20 respectively after the extension of both sides.
Be further used as preferred embodiment, described pedestal 2 comprises curved plate and is welded on the angle steel bracing frame 4 below curved plate, and described positioning chamber 20 is located at curved plate inside.
Be further used as preferred embodiment, adjacent two described moulding bed unit 1 are connected and fixed by moulding bed connecting reinforcement 6.
Be further used as preferred embodiment, also comprise multiple hook 5 be arranged on above described positioning chamber 20.
Be further used as preferred embodiment, the cross section of described positioning chamber 20 is semicircle.
Below the embodiment that the utility model manufactures:
1, choose length to be greater than the radius that reinforcement cage skeleton diameter is about the steel plate of 10cm, the width of steel plate is greater than reinforcement cage skeleton and to be about 10cm, steel plate thickness is not less than 1cm.Oxyacetylene metal-cutting is adopted steel plate to be cut into the curved plate that internal diameter equals the main muscle external diameter of reinforcing cage.
2,12 spacer barss 3 length being about 8cm are directly welded on as locating piece on semi-circular plate, and the protruded length of locating piece is about 3cm, and locating piece and steel plate lap length are 5cm, and locating piece pad is indirectly indirectly consistent with the main muscle of reinforcing cage.
3, adopt 6 bugle steel as the base of pedestal 2, curved plate is directly welded on angle steel, make moulding bed unit 1 can be upright.
4, the moulding bed unit 1 adopting steel plate to be made is lower part reinforcing cage moulding bed, moulding bed top adopts 12 round steel to be made into hook 5, hook 5 is adopted to be fixed on one by one on reinforcing rib by main for top muscle, make the main muscle of reinforcing cage and reinforcing rib connect into a reinforcement cage skeleton, then main muscle and reinforcing rib are welded into reinforcement cage skeleton.
5, can be used as a reinforcing cage machining production line after adopting the moulding bed connecting reinforcement 6 of 25 to be welded and fixed multiple moulding bed unit 1.
More than that better embodiment of the present utility model is illustrated, but the invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite without prejudice to the utility model spirit, and these equivalent modification or replacement are all included in the application's claim limited range.
Claims (6)
1. pile foundation steel bar cage skeleton processing moulding bed, it is characterized in that: it comprises the moulding bed unit of at least two distributions that are in line, described moulding bed unit comprises pedestal, being provided with a cross section in described pedestal is the positioning chamber of arc, the axle center of the positioning chamber in two adjacent moulding bed unit is on same axis, the intrados of positioning chamber is provided with many spacer barss, and described spacer bars is along the circle distribution of the arc section of positioning chamber.
2. pile foundation steel bar cage skeleton processing moulding bed according to claim 1, is characterized in that: the two ends of described spacer bars are stretched out outside positioning chamber respectively after the extension of both sides.
3. pile foundation steel bar cage skeleton processing moulding bed according to claim 1, is characterized in that: described pedestal comprises curved plate and is welded on the angle steel bracing frame below curved plate, and described positioning chamber is located at curved plate inside.
4. pile foundation steel bar cage skeleton processing moulding bed according to claim 1, is characterized in that: adjacent two described moulding bed unit are connected and fixed by moulding bed connecting reinforcement.
5. the pile foundation steel bar cage skeleton processing moulding bed according to claim 1 or 2 or 3 or 4, is characterized in that: also comprise multiple hook be arranged on above described positioning chamber.
6. pile foundation steel bar cage skeleton processing moulding bed according to claim 1, is characterized in that: the cross section of described positioning chamber is for semicircle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520265655.1U CN204645024U (en) | 2015-04-28 | 2015-04-28 | Pile foundation steel bar cage skeleton processing moulding bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520265655.1U CN204645024U (en) | 2015-04-28 | 2015-04-28 | Pile foundation steel bar cage skeleton processing moulding bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204645024U true CN204645024U (en) | 2015-09-16 |
Family
ID=54097782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520265655.1U Active CN204645024U (en) | 2015-04-28 | 2015-04-28 | Pile foundation steel bar cage skeleton processing moulding bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204645024U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106040921A (en) * | 2016-05-24 | 2016-10-26 | 中交第航务工程局有限公司 | Cylindrical steel reinforcement cage quick precise connection machining formwork and manufacturing method for steel reinforcement cages |
CN108655656A (en) * | 2018-04-13 | 2018-10-16 | 合肥海银杆塔有限公司 | A kind of internal steel reinforcement cage processing clamping positioning disk of shaft tower processing |
CN108842629A (en) * | 2018-07-16 | 2018-11-20 | 浙江交工集团股份有限公司 | A kind of hyperboloid pier shaft framework of steel reinforcement in-site installation localization method |
CN108842602A (en) * | 2018-07-16 | 2018-11-20 | 浙江交工集团股份有限公司 | A kind of hyperboloid vase pier framework of steel reinforcement |
CN109365696A (en) * | 2018-11-30 | 2019-02-22 | 中国冶集团有限公司 | A kind of fabrication of reinforcing cage mould bases and construction method |
CN109366063A (en) * | 2018-11-02 | 2019-02-22 | 筑梦高科建筑有限公司 | Framework of steel reinforcement machine table and framework of steel reinforcement processing method |
CN113756291A (en) * | 2021-10-12 | 2021-12-07 | 上海东华建设管理有限公司 | Assembling construction method for cast-in-place pile reinforcement cage |
DE202022105723U1 (en) | 2022-02-09 | 2022-11-08 | Shanghai Civil Engineering Co., Ltd Of Crec | Hoop frame to process pile foundation steel bar cage skeleton with adjustable diameter |
-
2015
- 2015-04-28 CN CN201520265655.1U patent/CN204645024U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106040921A (en) * | 2016-05-24 | 2016-10-26 | 中交第航务工程局有限公司 | Cylindrical steel reinforcement cage quick precise connection machining formwork and manufacturing method for steel reinforcement cages |
CN108655656A (en) * | 2018-04-13 | 2018-10-16 | 合肥海银杆塔有限公司 | A kind of internal steel reinforcement cage processing clamping positioning disk of shaft tower processing |
CN108842629A (en) * | 2018-07-16 | 2018-11-20 | 浙江交工集团股份有限公司 | A kind of hyperboloid pier shaft framework of steel reinforcement in-site installation localization method |
CN108842602A (en) * | 2018-07-16 | 2018-11-20 | 浙江交工集团股份有限公司 | A kind of hyperboloid vase pier framework of steel reinforcement |
CN109366063A (en) * | 2018-11-02 | 2019-02-22 | 筑梦高科建筑有限公司 | Framework of steel reinforcement machine table and framework of steel reinforcement processing method |
CN109365696A (en) * | 2018-11-30 | 2019-02-22 | 中国冶集团有限公司 | A kind of fabrication of reinforcing cage mould bases and construction method |
CN109365696B (en) * | 2018-11-30 | 2020-08-18 | 中国一冶集团有限公司 | Steel reinforcement cage manufacturing formwork and construction method |
CN113756291A (en) * | 2021-10-12 | 2021-12-07 | 上海东华建设管理有限公司 | Assembling construction method for cast-in-place pile reinforcement cage |
DE202022105723U1 (en) | 2022-02-09 | 2022-11-08 | Shanghai Civil Engineering Co., Ltd Of Crec | Hoop frame to process pile foundation steel bar cage skeleton with adjustable diameter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645024U (en) | Pile foundation steel bar cage skeleton processing moulding bed | |
CN205058277U (en) | Prefabricated T girder iron muscle mould | |
CN204983145U (en) | Connection structure of square steel column and steel I -beam | |
CN205223864U (en) | Reinforcement mould for moving die carrier | |
CN104727560A (en) | Reinforced concrete structure reinforced steel framework forming method and reinforced steel jig frame | |
CN202924576U (en) | Lifting tool for totally enclosed bus conductor | |
CN203738291U (en) | Vertical excavator balance-weight overlap welding tool | |
CN105421341A (en) | Large-diameter pile foundation reinforcement cage manufacturing method | |
CN208584137U (en) | Reinforced mesh welding support | |
CN202926860U (en) | Long curved rod | |
CN103967286A (en) | Large-sized stone installing and transferring clamp | |
CN205276698U (en) | Angle steel in system hole in concrete | |
CN203795876U (en) | Mounting and carrying clamp for large-sized stones | |
CN204225098U (en) | Overweight reinforcing cage | |
CN202766978U (en) | Lateral moving track device for road bridge erection machine | |
CN204524117U (en) | Bridge pile foundation fabrication of reinforcing cage simple platform | |
CN204525757U (en) | The steel bar binding clamping fixture of web at the bottom of prefabricated case beam | |
CN203892857U (en) | Industrial angle iron | |
CN205778935U (en) | A kind of closely-spaced tunnel suspension device | |
CN204897203U (en) | Gantry crane girder | |
CN205589654U (en) | Steel pipe support bracket | |
CN204531408U (en) | Sizing bed die | |
CN204326063U (en) | A kind of pile foundation reinforcement cage producing device | |
CN204163361U (en) | A kind of building implements scaffold | |
CN204212069U (en) | A kind of building operations Hanging Basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |