CN203188579U - Automatic ceramic tile sticking and wall-whitewashing synchronous machine - Google Patents

Automatic ceramic tile sticking and wall-whitewashing synchronous machine Download PDF

Info

Publication number
CN203188579U
CN203188579U CN 201320022872 CN201320022872U CN203188579U CN 203188579 U CN203188579 U CN 203188579U CN 201320022872 CN201320022872 CN 201320022872 CN 201320022872 U CN201320022872 U CN 201320022872U CN 203188579 U CN203188579 U CN 203188579U
Authority
CN
China
Prior art keywords
ceramic tile
conveyer belt
chain
ash
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320022872
Other languages
Chinese (zh)
Inventor
余选兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320022872 priority Critical patent/CN203188579U/en
Application granted granted Critical
Publication of CN203188579U publication Critical patent/CN203188579U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses an automatic ceramic tile sticking and wall-whitewashing synchronous machine which comprises a ceramic tile sticking main machine, a wall-whitewashing main machine and a lifting machine arranged below the ceramic tile sticking main machine and the wall-whitewashing main machine. The ceramic tile sticking main machine comprises a first rack, a first conveying mechanism arranged on the first rack and used for conveying ceramic tiles, a first ash bin arranged above the first conveying mechanism and used for plastering the surfaces of the ceramic tiles, a box iron type ceramic tile box for containing the ceramic tiles, a first ash cutting plate, a ceramic tile rolling sticking shaft and a ceramic tile depressing shaft, wherein the first ash cutting plate, the ceramic tile rolling sticking shaft and the ceramic tile depressing shaft are arranged on the first rack. The automatic ceramic tile sticking and wall-whitewashing synchronous machine is simple in operation, achieves flatness of the whitewashing appearances of building walls and the flatness and firmness of the ceramic tile sticking appearances of the building walls, greatly improves the speed of ceramic tile sticking and wall whitewashing, reduces labor cost and material cost, and saves time.

Description

Automatically the sticking brick synchronous all-in-one of plastering wall
Technical field
The utility model relates to a kind of automatic sticking brick synchronous all-in-one of plastering wall.
Background technology
There are not simple and practical sticking brick machine or plastering machine in the market, and function is only limited to single realization sticking brick or white washed wall, special sticking brick body is long-pending huge, constructional difficulties, outward appearance out-of-flatness during sticking brick, when engineering is carried out, exist problems such as time waste and inefficiency.Because of of long duration or be pasted not strongly and situations such as ceramic tile comes off to occur.
Summary of the invention
In order to overcome the insufficiency that existing equipment exists, complicated operation, constructional difficulties, impracticable and lose time and ineffective defective and the shortcoming that ceramic tile dropping situations etc. occurs of long duration, the utility model provide a kind of automatic sticking brick synchronous all-in-one of plastering wall.
The technical solution adopted in the utility model is:
Automatically the sticking brick synchronous all-in-one of plastering wall is characterized in that: comprise the sticking brick main frame, the main frame and be located at described sticking brick main frame and the hoist of white washed wall main frame below of plastering wall;
Described sticking brick main frame comprises first frame, is located at first conveying mechanism of the conveying ceramic tile on described first frame, is located at described first conveying mechanism top and the channel-section steel formula ceramic tile case of first ash bin of plastering to ceramic tile surface and dress ceramic tile, is located at first on described first frame and cuts hawk, roll the tile fixing axle and ceramic tile is smashed axle;
Described white washed wall main frame comprises second frame that is located on described first frame, second conveying mechanism that is located at the conveying ceramic tile on described second frame, be located at the telescopic hydraulic cylinder that can control described first conveying mechanism and the running of second conveying mechanism respectively of described first frame below and be located at hydraulic cylinder control device on described second frame, be located at described second conveying mechanism top and second ash bin of plastering to ceramic tile surface, the pressure ash axle and the white washed wall that are located on described second frame step on hawk, described white washed wall is stepped on hawk and is fixed on described described second frame of pressing ash axle below;
The first conveyer belt main shaft and the first conveying tape spool that described first conveying mechanism comprises first chain, the 5th chain, the first baffle plate conveyer belt and is located at the described first frame both sides; Described first chain is located on the individual event change-speed gearing of the described first conveyer belt main shaft and two ends link to each other respectively, and chain reclaims machine, and wherein an end is fixed on the underframe of described hoist; The described first baffle plate conveyer belt, one end is set on the described first conveyer belt main shaft, the other end is set in described first and carries on the tape spool, thereby so that described hoist when rising described first chain drive the described first conveyer belt main shaft and drive described first baffle plate conveyer belt running; Described the 5th chain one end is set on the individual event change-speed gearing of the described first conveyer belt main shaft, the other end is set on the described individual event change-speed gearing that rolls the tile fixing axle, and the described tile fixing axle that rolls is smashed axle and is cut hawk through-drive and be connected with described ceramic tile respectively by second chain and the 3rd chain, and described first cuts hawk is located at described first and cuts on the hawk axle; Thereby described first chain drive the described first conveyer belt main shaft rotate drive describedly roll the tile fixing axle, ceramic tile is smashed axle and first and is cut the rotation of hawk axle;
The second conveyer belt main shaft and the second conveying tape spool that described second conveying mechanism comprises the 4th chain, the 6th chain, second baffle conveyer belt and is located at the described second frame both sides, described the 4th chain one end is located on the individual event change-speed gearing of the described second conveyer belt main shaft, and the other end is located on the individual event gear of the described first conveyer belt main shaft and described first chain can drive described the 4th chain operation; Described second baffle conveyer belt one end is set on the described second conveyer belt main shaft, the other end is set in described second and carries on the tape spool, so that described hoist when rising described first chain drive described the 4th chain, described the 6th chain one end is set on the individual event change-speed gearing of the described second conveyer belt main shaft, the other end is set on the individual event change-speed gearing of described pressure ash axle, and the described second conveyer belt main shaft drives described second baffle conveyer belt and described pressure ash axle turns round thereby described the 4th chain drives;
Described hoist comprises hoist top board, underframe, is located at the metal wheel of described underframe bottom, is located at the lifting arm on the described underframe, hydraulic cylinder and the lifting motor of the described lifting arm of driving; Described underframe is provided with channel-section steel formula track, and the bottom of described lifting arm is located in the described channel-section steel formula track, and the upper end of described lifting arm is connected with described hoist top board; Described hydraulic cylinder is installed on the described lifting arm.
Further, but the described first conveyer belt main shaft, first cut hawk axle, the second conveyer belt main shaft, press ash axle and the described individual event change-speed gearing that rolls the rotary speed that is respectively equipped with regulating shaft on the tile fixing axle.
Further, described tile fixing axle and the ceramic tile of rolling smashed and is respectively equipped with on the axle and can smashes useless ash on the axle and remove clean right angle and scrape ash-containing plate peace plate and scrape ash-containing plate rolling tile fixing axle and ceramic tile dropping.
Further, described first frame is provided with porous hydraulic giant pipe, water pump and water pump return pipe, the pump drain pipe for useless ash on the described first baffle plate conveyer belt of cleaning and the second baffle conveyer belt; Also be provided with tank on described first frame, described first frame is located at one and is provided with on the track of wheel, and described track is located on the described hoist top board.
Further, also be provided with the holder axle respectively between the described first conveyer belt main shaft and the described second conveying tape spool and between the described second conveyer belt main shaft and the described second conveying tape spool.
Further, the bottom of described first ash bin is provided with the pressure limiting plate, and described pressure limiting plate two ends are respectively arranged with the spring of band latch; The bottom of described second ash bin is provided with smashes hawk.
Further, equidistantly be provided with dust block board in described first ash bin and second ash bin.
Further, described underframe is provided with the movable motor of the described all-in-one walking of control and the described chain recovery machine of described first chain of recovery.
Further, described hydraulic cylinder control device comprises control hydraulic cylinder and chain pitch wheel.When working as stopping all-in-one, to control hydraulic cylinder and rise, by two gears on the control hydraulic cylinder top first chain be risen, after first chain exceeds the height of individual event change-speed gearing of the first conveyer belt main shaft, all-in-one will lose the driving force of first chain, thereby quit work.Only resuming work needs the control hydraulic cylinder is lowered, and first chain is got back on the individual event change-speed gearing of the first conveyer belt main shaft and got final product.
Further, the lower end of described first frame is provided with the heating element of avoiding ceramic tile to tilt that can toast the ash of metope.
Sticking brick main frame described in the utility model and white washed wall main frame adopt ascending/decending power: the power of described sticking brick main frame and white washed wall main frame is when utilizing hoist to rise, first chain drives first, second conveyer belt main shaft as power, hoist descends, first chain is recovered simultaneously, and described sticking brick main frame and white washed wall main frame are with the maintenance state that stops operating.
The design of the utility model channel-section steel formula track is to retread down for avoiding hoist to raise, and the bottom wheel adopts metal wheel.Hoist will keep consistent with the distance of whole metope when dropping to behind the end in track walking, make to plaster wall and the ceramic tile of stickup is more smooth and can paste the polylith ceramic tile simultaneously.
Operating principle of the present utility model:
1, separately during sticking brick: the white washed wall main frame need not be adorned ash.Channel-section steel formula ceramic tile case is filled ceramic tile, and ceramic tile is transported under first ash bin, and first ash bin is filled ash, starts telescopic hydraulic cylinder, and the sticking brick main frame is stretched to metope, reaches required distance when meeting sticking brick from the distance of metope.When hoist rises, drive first chain, first chain drives the first conveyer belt main shaft, drives the first baffle plate conveyer belt and the 5th chain operation simultaneously, drives second chain and the 3rd chain again and drives and to roll tile fixing axle and ceramic tile and smash axle and first and cut hawk axle rotary work.During the operation of sticking brick main frame, the ceramic tile that baffle plate on the first baffle plate conveyer belt will drop on the first baffle plate conveyer belt in the ceramic tile case is pushed under first ash bin, ceramic tile is during through first ash bin, ceramic tile surface is smeared full ash, through smashing hawk the ash on the ceramic tile is smashed again, simultaneously the grey thickness on the ceramic tile is dropped to the thickness that oneself needs.The ceramic tile of the filling ash back of coming out arrives first and cuts the hawk axle and can cut in the grey scope, this moment first cut the hawk axle at rotary work, cut by first and cut ash that hawk goes up ceramic tile foremost on the hawk axle and cut flat (influencing the injustice of ceramic tile stickup when avoiding ceramic tile contact with metope) and make all ceramic tile front ends maintenances smooth.Ceramic tile ash is foremost cut flat back ceramic tile and is entered and roll the tile fixing axle, and when ceramic tile was delivered to roller surface, the roller bearing rotation was rolled ceramic tile is rolled into metope, and hoist sticks on ceramic tile on the metope when rising, and smashes axle by ceramic tile again ceramic tile is smashed again.Some ash dropped and smashed on the axle rolling tile fixing axle and ceramic tile this moment, scraped ash-containing plate peace plate by the right angle and scraped ash-containing plate and will drop respectively and scrape totally rolling the useless ash that tile fixing axle and ceramic tile smash on the axle.The first baffle plate conveyer belt will enter tank when returning and clean automatically, transport behind the effluent trough through porous hydraulic giant pipe, water under high pressure by the water pump ejection cleans again, guarantees to enter the not sticking any ash of the first baffle plate conveyer belt and other material, the periodic duty like this of ceramic tile case.
When 2, plastering wall separately: need not adorn ceramic tile and ash on the sticking brick main frame.Second ash bin is filled ash, start telescopic hydraulic cylinder, the main frame of will plaster wall stretches to metope, reaches from the distance of metope to meet required distance when plastering wall.Start hoist, first chain drives the 4th chain, drive the second conveyer belt main shaft and the 6th chain operation simultaneously, the running of white washed wall main frame, the second baffle conveyer belt is started working, ash is exported second ash bin, through stepping on hawk the thickness of ash is dropped to the thickness that needs, the second baffle conveyer belt is delivered to ash and is pressed the ash axle then, and the pressure of rolling simultaneously ash axle is delivered to metope with ash, press the ash axle not stop to roll ash is pressed on metope, hoist rises to be stepped on the hawk secondary by white washed wall and steps on tightly and smash.
When 3, sticking brick and white washed wall are synchronous: the sticking brick main frame and the white washed wall main frame lump together up and down, the white washed wall main frame in the above, the sticking brick main frame below, two main frame synchronous workings.Ceramic tile in the ash of first ash bin and the channel-section steel formula ceramic tile case and ash are filled the back, and (annotate: first ash bin on the sticking brick main frame of this moment does not need the dress ash, and ceramic tile does not need to plaster, and directly pastes metope ash the inside; Water pump does not need work yet), (after by the first conveyer belt baffle plate all ceramic tiles being stoped balance, the spring on the damping plate will be upspring to add the damping plate.) start telescopic hydraulic cylinder, two main frames are stretched to metope, reach when meeting white washed wall from the distance of metope and the sticking brick required separation distance.Start hoist, drive first chain and the 4th chain, start sticking brick main frame and white washed wall main frame synchronously, when the white washed wall main frame is attached to ashes on the metope, the sticking brick main frame directly sticks on ceramic tile on the metope ash synchronously, simultaneously ceramic tile is compressed into the ash the inside, smashed axle by ceramic tile again ceramic tile is smashed again.By heating element the quick baking of the ash of metope is examined at last, avoid the humidity of ash to cause ceramic tile to tilt.
Synchronously method of attaching pastes the ash the inside with ceramic tile, and sticking is more firm, has solved the high-rise building sticking brick time dropping situations to occur after long.Broken through the defective of pasting the maximum of exterior wall tile.That also ash is pressed when ceramic tile is compressed into the ash the inside is tighter, and the slit in the metope all is stained with ash, prevents that the crack from appearring in metope.
The beneficial effects of the utility model are embodied in: simple to operate, solved building wall white washed wall appearance flatness and sticking brick appearance flatness and more firm, and improve speed energetically and reduce cost of labor and material cost, save time.
Description of drawings
Fig. 1 is the utility model overall structure schematic diagram.
Fig. 2 is the utility model partial structurtes schematic diagrames.
Fig. 3 is the utility model first baffle plate conveyer belt structure schematic diagram.
Fig. 4 is the utility model hoist Undercarriage structure schematic diagram.
Fig. 5 is that the utility model white washed wall is stepped on the hawk structural representation.
Fig. 6 is the utility model channel-section steel formula track structure schematic diagram.
Fig. 7 is that the utility model first is cut hawk axle construction schematic diagram.
Fig. 8 is the utility model hydraulic cylinder control device structural representation.
Fig. 9 is the utility model pressure limiting plated construction schematic diagram.
Figure 10 is the utility model ash last item structural representation.
Figure 11 is that the utility model rolls tile fixing axle construction schematic diagram.
The specific embodiment
Referring to figs. 1 through Figure 11, the automatic sticking brick synchronous all-in-one of plastering wall comprises the sticking brick main frame, the main frame and be located at described sticking brick main frame and the hoist of white washed wall main frame below of plastering wall;
Described sticking brick main frame comprises first frame 1, is located at first conveying mechanism of the conveying ceramic tile on described first frame 1, is located at described first conveying mechanism top and the channel-section steel formula ceramic tile case 2 of first ash bin 3 of plastering to ceramic tile surface and dress ceramic tile, is located at first on described first frame 1 and cuts hawk 41, roll tile fixing axle 5 and ceramic tile is smashed axle 7;
Described white washed wall main frame comprises second frame 20 that is located on described first frame 1, be located at second conveying mechanism of the conveying ceramic tile on described second frame 20, be located at the telescopic hydraulic cylinder 23 that to control described first conveying mechanism and the running of second conveying mechanism respectively of described first frame 1 below and the hydraulic cylinder that is located on described second frame 20 and control device, second ash bin 17 that is located at described second conveying mechanism top and plasters to ceramic tile surface, the pressure ash axle 46 and the white washed wall that are located on described second frame 20 are stepped on hawk 39, and described white washed wall is stepped on hawk 39 and is fixed on described second frame 20 of described pressure ash axle 46 belows;
The first conveyer belt main shaft 13 and the first conveying tape spool 49 that described first conveying mechanism comprises first chain 9, the 5th chain 48, the first baffle plate conveyer belt 8 and is located at described first frame 1 both sides; Described first chain 9 is located on the individual event change-speed gearing of the described first conveyer belt main shaft 13 and two ends link to each other respectively, and chain reclaims machine 33, and wherein an end is fixed on the underframe 28 of described hoist; The described first baffle plate conveyer belt, 8 one ends are set on the described first conveyer belt main shaft 13, the other end is set in described first and carries on the tape spool 49, thereby so that described hoist when rising described first chain 9 drive the described first conveyer belt main shaft 13 and drive 8 runnings of the described first baffle plate conveyer belt; Described the 5th chain 48 1 ends are set on the individual event change-speed gearing of the described first conveyer belt main shaft 13, the other end is set on the described individual event change-speed gearing that rolls tile fixing axle 5, and the described tile fixing axle 5 that rolls is smashed axle 7 and is cut hawk axle 6 with described ceramic tile respectively by second chain 10 and the 3rd chain 11 and is in transmission connection, and described first cuts hawk 41 is located at described first and cuts on the hawk axle 6; Thereby described first chain 9 drive the described first conveyer belt main shaft 13 rotate drive describedly roll tile fixing axle 5, ceramic tile is smashed axle 7 and first and is cut 6 rotations of hawk axle;
The second conveyer belt main shaft 14 and the second conveying tape spool 19 that described second conveying mechanism comprises the 4th chain 16, the 6th chain 47, second baffle conveyer belt 15 and is located at described second frame 20 both sides, described the 4th chain 16 1 ends are located on the individual event change-speed gearing of the described second conveyer belt main shaft 14, and the other end is located on the individual event gear of the described first conveyer belt main shaft 13 and described first chain 9 can drive 16 runnings of described the 4th chain; Described second baffle conveyer belt 15 1 ends are set on the described second conveyer belt main shaft 14, the other end is set in described second and carries on the tape spool 19, so that described hoist when rising described first chain 9 drive described the 4th chain 16, described the 6th chain 47 1 ends are set on the individual event change-speed gearing of the described second conveyer belt main shaft 14, the other end is set on the individual event change-speed gearing of described pressure ash axle 46, drives described second baffle conveyer belt 15 and 46 running of described pressure ash thereby described the 4th chain 16 drives the described second conveyer belt main shaft 14;
Described hoist comprises hoist top board 24, underframe 28, is located at the metal wheel 31 of described underframe 28 bottoms, is located at the lifting arm 26 on the described underframe 28, hydraulic cylinder 27 and the lifting motor 30 of the described lifting arm 26 of driving; Described underframe 28 is provided with channel-section steel formula track 32, and the bottom of described lifting arm 26 is located in the described channel-section steel formula track 32, and the upper end of described lifting arm 26 is connected with described hoist top board 24; Described hydraulic cylinder 27 is installed on the described lifting arm 26.
Further, but the described first conveyer belt main shaft 13, first cut hawk axle 6, the second conveyer belt main shaft 14, press ash axle 46 and the described individual event change-speed gearing that rolls the rotary speed that is respectively equipped with regulating shaft on the tile fixing axle 5.
Further, described tile fixing axle 5 and the ceramic tile of rolling smashed and is respectively equipped with on the axle 7 and can smashes useless ash on the axle 7 and remove clean right angle and scrape ash-containing plate peace plate and scrape ash-containing plate rolling tile fixing axle 5 and ceramic tile dropping.
Further, described first frame 1 is provided with porous hydraulic giant pipe 44, water pump 35 and water pump return pipe 36, the pump drain pipe 34 for useless ash on the described first baffle plate conveyer belt 8 of cleaning and the second baffle conveyer belt 15; Also be provided with tank 12 on described first frame 1, described first frame 1 is located at one and is provided with on the track 21 of wheel 25, and described track 21 is located on the described hoist top board 24.
Further, also be provided with holder axle 18 respectively between the described first conveyer belt main shaft 13 and the described second conveying tape spool 14 and between the described second conveyer belt main shaft 14 and the described second conveying tape spool 19.
Further, the bottom of described first ash bin 3 is provided with pressure limiting plate 4, and described pressure limiting plate 4 two ends are respectively arranged with the spring 43 of band latch 42; The bottom of described second ash bin 17 is provided with smashes hawk.
Further, equidistantly be provided with dust block board in described first ash bin 3 and second ash bin 17.
Further, described underframe 28 is provided with the movable motor 29 of the described all-in-one walking of control and the described chain recovery machine 30 of described first chain 9 of recovery.
Further, described hydraulic cylinder control device comprises control hydraulic cylinder 38 and chain pitch wheel 40.When working as stopping all-in-one, to control hydraulic cylinder 38 rises, by two gears 40 on control hydraulic cylinder 38 tops first chain 9 is risen, after first chain 9 exceeds the height of individual event change-speed gearing of the first conveyer belt main shaft 13, all-in-one will lose the driving force of first chain 9, thereby quit work.Only resuming work needs control hydraulic cylinder 38 is lowered, and first chain 9 is got back on the individual event change-speed gearing of the first conveyer belt main shaft 13 and got final product.
Further, the lower end of described first frame 1 is provided with the heating element 22 of avoiding ceramic tile to tilt that can toast the ash of metope.
Sticking brick main frame described in the utility model and white washed wall main frame adopt ascending/decending power: the power of described sticking brick main frame and white washed wall main frame is when utilizing hoist to rise, first chain 9 drives first, second conveyer belt main shaft 13,14 as power, hoist descends, first chain 9 is recovered simultaneously, and described sticking brick main frame and white washed wall main frame are with the maintenance state that stops operating.
The design of the utility model channel-section steel formula track 32 is to retread down for avoiding hoist to raise, and the bottom wheel adopts metal wheel 31.Hoist will keep consistent with the distance of whole metope when dropping to behind the end in track walking, make to plaster wall and the ceramic tile of stickup is more smooth and can paste the polylith ceramic tile simultaneously.
Operating principle of the present utility model:
1, separately during sticking brick: the white washed wall main frame need not be adorned ash.Channel-section steel formula ceramic tile case 2 is filled ceramic tile, and ceramic tile is transported to first ash bin 3 times, and first ash bin 3 is filled ash, starts telescopic hydraulic cylinder 23, and the sticking brick main frame is stretched to metope, reaches required distance when meeting sticking brick from the distance of metope.When hoist rises, drive first chain 9, first chain 9 drives the first conveyer belt main shafts 13 and 48 runnings of the 5th chain, drives the first baffle plate conveyer belt 8 simultaneously, drives second chain 10 and the 3rd chain 11 again and drives and roll tile fixing axle 5 and ceramic tile and smash axle 7 and first and cut hawk axle 6 rotary works.During the operation of sticking brick main frame, the ceramic tile that baffle plate 37 on the first baffle plate conveyer belt 8 will drop on the first baffle plate conveyer belt 8 in the ceramic tile case 2 is pushed to first ash bin 3 times, ceramic tile is during through first ash bin 3, ceramic tile surface is smeared full ash, through smashing hawk the ash on the ceramic tile is smashed again, simultaneously the grey thickness on the ceramic tile is dropped to the thickness that oneself needs.The ceramic tile of the filling ash back of coming out arrives first and cuts hawk axle 6 and can cut in the grey scope, this moment first cut hawk axle 6 at rotary work, cut by first and cut ash that hawk 41 goes up ceramic tile foremost on the hawk axle 6 and cut flat (influencing the injustice of ceramic tile stickup when avoiding ceramic tile contact with metope) and make all ceramic tile front ends maintenances smooth.Ceramic tile ash is foremost cut flat back ceramic tile and is entered and roll tile fixing axle 5, and when ceramic tile was delivered to roller surface, the roller bearing rotation was rolled ceramic tile is rolled into metope, and hoist sticks on ceramic tile on the metope when rising, and smashes axle 7 by ceramic tile again ceramic tile is smashed again.Some ash dropped and smashed on the axle 7 rolling tile fixing axle 5 and ceramic tile this moment, and scrape ash-containing plate peace plate by the right angle and scrape ash-containing plate and will drop respectively and scrape totally rolling the useless ash that tile fixing axle 5 and ceramic tile smash on the axle 7.The first baffle plate conveyer belt 8 will enter tank 12 when returning and clean automatically, transport behind the effluent trough 12 through porous hydraulic giant pipe 44, water under high pressure by water pump 35 ejections cleans again, guarantees to enter the not sticking any ash of the first baffle plate conveyer belt 8 and other material, the periodic duty like this of ceramic tile case.
When 2, plastering wall separately: need not adorn ceramic tile and ash on the sticking brick main frame.Second ash bin 17 is filled ash, start telescopic hydraulic cylinder 23, the main frame of will plaster wall stretches to metope, reaches from the distance of metope to meet required distance when plastering wall.Start hoist, first chain 9 drives the 4th chain 16 and 47 runnings of the 6th chain, drive the second conveyer belt main shaft 14 simultaneously, the running of white washed wall main frame, second baffle conveyer belt 15 is started working, ash is exported second ash bin 17, through and stepping on the thickness that hawk 45 drops to the thickness of ash needs, second baffle conveyer belt 15 is delivered to ash and is pressed the ash axle then, the pressure ash axle that rolls is simultaneously delivered to metope with ash, press ash axle axle not stop to roll ash is pressed on metope, hoist rises to be stepped on hawk 39 secondaries by white washed wall and steps on tightly and smash.
When 3, sticking brick and white washed wall are synchronous: the sticking brick main frame and the white washed wall main frame lump together up and down, the white washed wall main frame in the above, the sticking brick main frame below, two main frame synchronous workings.Ceramic tile in the ash of first ash bin 3 and the channel-section steel formula ceramic tile case 2 and ash are filled the back, and (annotate: first ash bin on the sticking brick main frame of this moment does not need the dress ash, and ceramic tile does not need to plaster, and directly pastes metope ash the inside; Water pump does not need work yet), (after by the first conveyer belt baffle plate all ceramic tiles being stoped balance, the spring on the damping plate will be upspring to add the damping plate.) start telescopic hydraulic cylinder, two main frames are stretched to metope, reach when meeting white washed wall from the distance of metope and the sticking brick required separation distance.Start hoist, drive first chain 9 and the 4th chain 16, start sticking brick main frame and white washed wall main frame synchronously, when the white washed wall main frame is attached to ashes on the metope, the sticking brick main frame directly sticks on ceramic tile on the metope ash synchronously, simultaneously ceramic tile is compressed into the ash the inside, smashed axle by ceramic tile again ceramic tile is smashed again.By heating element 22 the quick baking of the ash of metope is examined at last, avoid the humidity of ash to cause ceramic tile to tilt.
The described content of this manual embodiment only is enumerating the way of realization of inventive concept; protection domain of the present utility model should not be regarded as only limiting to the concrete form that embodiment states, protection domain of the present utility model also reach in those skilled in the art according to the utility model design the equivalent technologies means that can expect.

Claims (10)

1. the automatic sticking brick synchronous all-in-one of plastering wall is characterized in that: comprise the sticking brick main frame, the main frame and be located at described sticking brick main frame and the hoist of white washed wall main frame below of plastering wall;
Described sticking brick main frame comprises first frame, is located at first conveying mechanism of the conveying ceramic tile on described first frame, is located at described first conveying mechanism top and the channel-section steel formula ceramic tile case of first ash bin of plastering to ceramic tile surface and dress ceramic tile, is located at first on described first frame and cuts hawk, roll the tile fixing axle and ceramic tile is smashed axle;
Described white washed wall main frame comprises second frame that is located on described first frame, second conveying mechanism that is located at the conveying ceramic tile on described second frame, be located at the telescopic hydraulic cylinder that can control described first conveying mechanism and the running of second conveying mechanism respectively of described first frame below and be located at hydraulic cylinder control device on described second frame, be located at described second conveying mechanism top and second ash bin of plastering to ceramic tile surface, the pressure ash axle and the white washed wall that are located on described second frame step on hawk, described white washed wall is stepped on hawk and is fixed on described described second frame of pressing ash axle below;
The first conveyer belt main shaft and the first conveying tape spool that described first conveying mechanism comprises first chain, the 5th chain, the first baffle plate conveyer belt and is located at the described first frame both sides; Described first chain is located on the individual event change-speed gearing of the described first conveyer belt main shaft and two ends link to each other respectively, and chain reclaims machine, and wherein an end is fixed on the underframe of described hoist; The described first baffle plate conveyer belt, one end is set on the described first conveyer belt main shaft, the other end is set in described first and carries on the tape spool, thereby so that described hoist when rising described first chain drive the described first conveyer belt main shaft and drive described first baffle plate conveyer belt running; Described the 5th chain one end is set on the individual event change-speed gearing of the described first conveyer belt main shaft, the other end is set on the described individual event change-speed gearing that rolls the tile fixing axle, and the described tile fixing axle that rolls is smashed axle and is cut hawk through-drive and be connected with described ceramic tile respectively by second chain and the 3rd chain, and described first cuts hawk is located at described first and cuts on the hawk axle; Thereby described first chain drive the described first conveyer belt main shaft rotate drive describedly roll the tile fixing axle, ceramic tile is smashed axle and first and is cut the rotation of hawk axle;
The second conveyer belt main shaft and the second conveying tape spool that described second conveying mechanism comprises the 4th chain, the 6th chain, second baffle conveyer belt and is located at the described second frame both sides, described the 4th chain one end is located on the individual event change-speed gearing of the described second conveyer belt main shaft, and the other end is located on the individual event gear of the described first conveyer belt main shaft and described first chain can drive described the 4th chain operation; Described second baffle conveyer belt one end is set on the described second conveyer belt main shaft, the other end is set in described second and carries on the tape spool, so that described hoist when rising described first chain drive described the 4th chain, described the 6th chain one end is set on the individual event change-speed gearing of the described second conveyer belt main shaft, the other end is set on the individual event change-speed gearing of described pressure ash axle, and the described second conveyer belt main shaft drives described second baffle conveyer belt and described pressure ash axle turns round thereby described the 4th chain drives;
Described hoist comprises hoist top board, underframe, is located at the metal wheel of described underframe bottom, is located at the lifting arm on the described underframe, hydraulic cylinder and the lifting motor of the described lifting arm of driving; Described underframe is provided with channel-section steel formula track, and the bottom of described lifting arm is located in the described channel-section steel formula track, and the upper end of described lifting arm is connected with described hoist top board; Described hydraulic cylinder is installed on the described lifting arm.
2. the automatic sticking brick as claimed in claim 1 synchronous all-in-one of plastering wall is characterized in that: but the described first conveyer belt main shaft, first is cut hawk axle, the second conveyer belt main shaft, is pressed ash axle and the described individual event change-speed gearing that rolls the rotary speed that is respectively equipped with regulating shaft on the tile fixing axle.
3. the automatic sticking brick as claimed in claim 2 synchronous all-in-one of plastering wall is characterized in that: described tile fixing axle and the ceramic tile of rolling smashed and is respectively equipped with on the axle and can smashes useless ash on the axle and remove clean right angle and scrape ash-containing plate peace plate and scrape ash-containing plate rolling tile fixing axle and ceramic tile dropping.
4. the automatic sticking brick as claimed in claim 3 synchronous all-in-one of plastering wall, it is characterized in that: described first frame is provided with porous hydraulic giant pipe, water pump and water pump return pipe, the pump drain pipe for useless ash on the described first baffle plate conveyer belt of cleaning and the second baffle conveyer belt; Also be provided with tank on described first frame, described first frame is located at one and is provided with on the track of wheel, and described track is located on the described hoist top board.
5. the automatic sticking brick as claimed in claim 4 synchronous all-in-one of plastering wall is characterized in that: the described first conveyer belt main shaft and described second is carried between the tape spool and the described second conveyer belt main shaft and described second is carried and also is provided with holder spool between the tape spool respectively.
6. the automatic sticking brick as claimed in claim 5 synchronous all-in-one of plastering wall, it is characterized in that: the bottom of described first ash bin is provided with the pressure limiting plate, and described pressure limiting plate two ends are respectively arranged with the spring of band latch; The bottom of described second ash bin is provided with smashes hawk.
7. the automatic sticking brick as claimed in claim 6 synchronous all-in-one of plastering wall is characterized in that: equidistantly be provided with dust block board in described first ash bin and second ash bin.
8. the automatic sticking brick as claimed in claim 7 synchronous all-in-one of plastering wall is characterized in that: the described chain that described underframe is provided with the movable motor of the described all-in-one walking of control and reclaims described first chain reclaims machine.
9. the automatic sticking brick as claimed in claim 8 synchronous all-in-one of plastering wall, it is characterized in that: described hydraulic cylinder control device comprises control hydraulic cylinder and chain pitch wheel.
10. the automatic sticking brick as claimed in claim 9 synchronous all-in-one of plastering wall, it is characterized in that: the lower end of described first frame is provided with the heating element of avoiding ceramic tile to tilt that can toast the ash of metope.
CN 201320022872 2013-01-16 2013-01-16 Automatic ceramic tile sticking and wall-whitewashing synchronous machine Expired - Lifetime CN203188579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320022872 CN203188579U (en) 2013-01-16 2013-01-16 Automatic ceramic tile sticking and wall-whitewashing synchronous machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320022872 CN203188579U (en) 2013-01-16 2013-01-16 Automatic ceramic tile sticking and wall-whitewashing synchronous machine

Publications (1)

Publication Number Publication Date
CN203188579U true CN203188579U (en) 2013-09-11

Family

ID=49105446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320022872 Expired - Lifetime CN203188579U (en) 2013-01-16 2013-01-16 Automatic ceramic tile sticking and wall-whitewashing synchronous machine

Country Status (1)

Country Link
CN (1) CN203188579U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074994A (en) * 2013-01-16 2013-05-01 余选兵 Synchronous all-in-one machine for automatically pasting ceramic tile and whitewashing wall
CN104533068A (en) * 2014-12-25 2015-04-22 苏州金螳螂住宅集成装饰有限公司 Stone installation assisting lifting platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074994A (en) * 2013-01-16 2013-05-01 余选兵 Synchronous all-in-one machine for automatically pasting ceramic tile and whitewashing wall
CN103074994B (en) * 2013-01-16 2014-12-17 余选兵 Synchronous all-in-one machine for automatically pasting ceramic tile and whitewashing wall
CN104533068A (en) * 2014-12-25 2015-04-22 苏州金螳螂住宅集成装饰有限公司 Stone installation assisting lifting platform

Similar Documents

Publication Publication Date Title
CN103074994B (en) Synchronous all-in-one machine for automatically pasting ceramic tile and whitewashing wall
CN111561137B (en) Cement device is smeared to ceramic tile for building
CN202197737U (en) Sandwiching machine for making sandwich biscuits
CN203188579U (en) Automatic ceramic tile sticking and wall-whitewashing synchronous machine
CN102121306A (en) Differential type plastering device
CN101525939A (en) Inner and outer wall plastering machine
CN207829419U (en) Ceramic tile mechanical float
CN203665614U (en) Paper collecting device of paper cutting machine
CN203665082U (en) Cutting and leveling machine for discharging
CN210888019U (en) Hanging basket for building convenient to remove
CN210279657U (en) Environment-friendly aluminum honeycomb core's rubber coating device
CN116427668B (en) Light partition wall vertical joint treatment device and application method thereof
CN201762969U (en) Automatic wall plastering machine
CN112109182A (en) System for preparing environment-friendly bricks by using construction waste reclaimed materials
CN211974205U (en) Automatic plastering and leveling device for vertical wallboard
CN211280451U (en) A quick knurling device for prefabricated panel
CN104818837A (en) Linkage execution device of troweling machine
CN108487614A (en) A kind of high-altitude wall decoration equipment of substitution climbing operation
CN213379530U (en) Building templates device convenient to tailor
CN205558220U (en) Ceramic tile mechanical float
CN204473901U (en) Dinas brickes stacks bricks folder
CN102862323B (en) Improved automatic paper cone coiling machine set for tube coiling mechanism
CN201013078Y (en) Ground surface plastering machine
CN206882049U (en) A kind of scraper for decorative panel production
CN203958750U (en) A kind of being applied to put foam dam device on ceramic tile packaging line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130911

Effective date of abandoning: 20141217

RGAV Abandon patent right to avoid regrant