CN203188568U - High-rise building construction garbage treatment system - Google Patents

High-rise building construction garbage treatment system Download PDF

Info

Publication number
CN203188568U
CN203188568U CN 201320233781 CN201320233781U CN203188568U CN 203188568 U CN203188568 U CN 203188568U CN 201320233781 CN201320233781 CN 201320233781 CN 201320233781 U CN201320233781 U CN 201320233781U CN 203188568 U CN203188568 U CN 203188568U
Authority
CN
China
Prior art keywords
sieve
building construction
carrier pipe
rotating shaft
disposal system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320233781
Other languages
Chinese (zh)
Inventor
景男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI JINGWEI CONSTRUCTION GROUP CO Ltd
Original Assignee
SHAANXI JINGWEI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI JINGWEI CONSTRUCTION GROUP CO Ltd filed Critical SHAANXI JINGWEI CONSTRUCTION GROUP CO Ltd
Priority to CN 201320233781 priority Critical patent/CN203188568U/en
Application granted granted Critical
Publication of CN203188568U publication Critical patent/CN203188568U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The utility model provides a high-rise building construction garbage treatment system, relates to a separation device and particularly relates to a separation device of building garbage. The high-rise building construction garbage treatment system disclosed by the utility model comprises a conveying pipe, wherein the conveying pipe is provided with a feeding opening; and a buffering device is arranged inside the conveying pipe. According to the high-rise building construction garbage treatment system disclosed by the utility model, the conveying pipe is arranged between floors, and the buffering device is arranged inside the conveying pipe, so as to effectively block the impact generated in a falling process of the garbage, reduce the descending speed of the building garbage, and avoid damages to an operator and equipment by the building garbage; and meanwhile, a sieving treatment device at the lower part of the conveying pipe is used for separating and outputting the garbage. The system disclosed by the utility model is simple in structure; the classified separation of the construction building garbage can be realized without using a power machine; and the high-rise building construction garbage treatment system is strong in practicability and can be industrially produced.

Description

The high-building construction refuse disposal system
Technical field
The utility model relates to a kind of separator, particularly a kind of piece-rate system of building waste.
Background technology
Situations such as concrete is shed, leakage owing to aspects such as template construction technology, concrete are carried, concrete vibrates, can take place, thereby produce the building waste that some is formed concrete material in structure construction procedure in the highrise building of concrete structure; Decorating, can produce in the installation and land mortar, concrete to pick cutter fragment etc. be main building waste.For these building wastes, the general employing artificially collects, utilize vertical transport equipment to collect, be transported to ground from each floor then, and then the mode that focuses on, this transportation, processing mode waste time and energy, need great amount of manpower rubbish is collected and to be classified, and taken vertical transport equipment, equipment is produced bigger infringement.At present in the building of low layer building, the mode of utilizing conveyance conduit to carry building waste is arranged also, if but this mode is applied in the highrise building of tens meters or up to a hundred meters, will bring great potential safety hazard.
Summary of the invention
The utility model is intended to propose a kind of safe, reliable treatment system that the building operations garbage reclamation is utilized of transmission.
High-building construction refuse disposal system described in the utility model comprises carrier pipe, and carrier pipe is provided with dog-house, and described carrier pipe inside is provided with buffer.
Preferably, described buffer comprises rotating shaft and dsah-pot, and rotating shaft is fixedly set on the carrier pipe, and dsah-pot is socketed in the rotating shaft outside, and is rotationally connected with rotating shaft.
Preferably, described rotating shaft is passed carrier pipe and is fixedly set on the concrete wall.
Preferably, described rotating shaft is the L type, and dsah-pot is socketed in its end that is provided with knuckle.
Preferably, described buffer has several, is arranged at carrier pipe inside stragglyly.
Preferably, the bottom of described carrier pipe is provided with the screening treating apparatus, and described screening treating apparatus comprises blower fan and screen cloth, and blower fan is arranged at the bottom of carrier pipe, and screen cloth is arranged at the bottom of blower fan.
Preferably, described screen cloth is three layers, is followed successively by gravel screen, middle sieve and end sieve from top to bottom, and the sieve diameter of gravel screen, middle sieve and end sieve reduces successively.
Further preferably, described gravel screen and middle sieve be arranged in parallel, and an end of gravel screen and middle sieve all links to each other with carrier pipe, all form the obtuse angle with carrier pipe, and the other end of described gravel screen and middle sieve is provided with discharging chute respectively.
Further preferably, one end of sieve of the described end links to each other with the end that middle sieve is provided with discharging chute, and forms angle between end sieve and the middle sieve, and this angle is acute angle, and the other end of sieve of the described end also is provided with discharging chute.
Preferably, carrier pipe inside also is provided with some buffers, and described buffer is located at carrier pipe inside stragglyly.
Preferably, described dog-house is provided with several.
High-building construction refuse disposal system described in the utility model, at floor gap carrier pipe is set, in carrier pipe inside buffer is set, effectively stop the impact that rubbish produces in the process of falling, reduce the sinking speed of building waste, avoid building waste to the damage of operating personnel and equipment, the screening treating apparatus of the bottom of carrier pipe separates output with rubbish simultaneously, system architecture described in the utility model is simple, do not use dynamic power machine can realize that the classification of construction building rubbish separates, practical, but suitability for industrialized production.
Description of drawings
Fig. 1 is the vertical profile structural representation of embodiment 1;
Fig. 2 is the vertical profile structural representation of buffer stopper;
1-carrier pipe among the figure; The 2-blower fan; The 3-buffer; The 4-gravel screen; Sieve among the 5-; Sieve at the bottom of the 6-; The 7-dog-house, the rotating shaft of 31-L shape; The 32-dsah-pot.
The specific embodiment
Embodiment 1
High-building construction refuse disposal system described in the utility model, present embodiment with carrier pipe 1 vertical fixing be arranged in the floor, a dog-house 7 all is set on the carrier pipe 1 of each layer, carrier pipe 1 inside is provided with buffer 3.Described buffer 3 comprises L shaped rotating shaft 31 and dsah-pot 32, L shaped rotating shaft 31 is provided with an end socket dsah-pot 32 of knuckle, dsah-pot 32 can freely rotate in L shaped rotating shaft 31, the knuckle of L shaped rotating shaft 31 can effectively stop dsah-pot 32, prevent that it from dropping when swing, the other end of L shaped rotating shaft 31 is fixedly installed on the carrier pipe 1 or passes carrier pipe 1 and is fixedly installed on the body of wall, described buffer 3 has several, these several buffers are irregular in carrier pipe 1 inside arranges, and arbitrary adjacent two buffers 3 are not all on same level or vertical line.Present embodiment arranges 2 buffers 3 equably at each layer of carrier pipe 1.
During work, building waste is dropped into from dog-house, in the process that building waste falls downwards, touch buffer 3, around L shaped rotating shaft 31 rotate after dsah-pot 32 is collided this moment, change has also taken place in the direction of falling of building waste, himself can continue to move downward under the gravity effect again simultaneously, bumps with next buffer.Arranging of buffer can effectively stop the impact that rubbish produces in the process of falling, reduce the sinking speed of building waste, effectively avoids building waste to the damage of operating personnel and equipment.
Embodiment 2
Present embodiment is substantially the same manner as Example 1, and difference is that present embodiment is provided with the screening treating apparatus in the bottom of carrier pipe 1, and this screening treating apparatus comprises blower fan 2, gravel screen 4, middle sieve 5 and end sieve 6; Blower fan 2 is arranged at the bottom of carrier pipe, the blower fan bottom is provided with gravel screen 4, middle sieve 5 and end sieve 6 successively, sieve 5 during gravel screen 4 is parallel to, one end of gravel screen 4 and middle sieve 5 all links to each other with carrier pipe 1, all form the obtuse angle with carrier pipe 1, and be provided with discharging chute respectively at the other end of gravel screen 4 and middle sieve 5.A sieve end of 6 links to each other with the end that middle sieve 5 is provided with discharging chute at the bottom of the present embodiment, and forms acute angle between end sieve 6 and the middle sieve 5, sieves 6 the other end end of at and also is provided with discharging chute.Present embodiment also is provided with some buffers 3 in carrier pipe 1 inside, buffer 3 arranges stragglyly, be provided with several dog-houses 7 simultaneously, make things convenient for the rubbish of each layer to drop into, present embodiment also is provided with discharging chute respectively in the exit of gravel screen 4 and middle sieve 5.
During construction, the dog-house 7 of building waste from each layer dropped into, building waste moves downward in carrier pipe 1 internal vertical under the gravity effect, the rubbish of lighter weight is blown from transporting hose under the effect of blower fan 2, the heavier rubbish of quality falls into screen cloth, because gravel screen 4, middle sieve 5, the sieve aperture of end sieve 6 reduces successively, therefore bigger rubbish is just separated from gravel screen 4, medium coarse sand stone therefrom sieves in 5 separated, thinner Powdered rubbish separates from end sieve 6, the material of separating is all discharged by its discharging chute separately, according to the situation of producing sandstone is reused at last.

Claims (10)

1. the high-building construction refuse disposal system comprises carrier pipe (1), and carrier pipe (1) is provided with dog-house (7), it is characterized in that described carrier pipe (1) inside is provided with buffer (3).
2. high-building construction refuse disposal system as claimed in claim 1, it is characterized in that described buffer (3) comprises rotating shaft and dsah-pot (32), rotating shaft is fixedly set on the carrier pipe (1), and dsah-pot (32) is socketed in the rotating shaft outside, and is rotationally connected with rotating shaft.
3. high-building construction refuse disposal system as claimed in claim 2 is characterized in that described rotating shaft passes carrier pipe (1) and be fixedly set on the concrete wall.
4. high-building construction refuse disposal system as claimed in claim 2 is characterized in that described rotating shaft is L shaped rotating shaft (31), and dsah-pot (32) is socketed in the end that L shaped rotating shaft (31) is provided with knuckle.
5. high-building construction refuse disposal system as claimed in claim 1 is characterized in that described buffer (3) has several, is arranged at carrier pipe (1) inside stragglyly.
6. high-building construction refuse disposal system as claimed in claim 1, the bottom that it is characterized in that described carrier pipe (1) is provided with the screening treating apparatus, this screening treating apparatus comprises blower fan (2) and screen cloth, blower fan (2) is arranged at the bottom of carrier pipe (1), and screen cloth is arranged at the bottom of blower fan (2).
7. high-building construction refuse disposal system as claimed in claim 5, it is characterized in that described screen cloth is three layers, be followed successively by gravel screen (4), middle sieve (5) and end sieve (6) from top to bottom, the sieve diameter of gravel screen (4), middle sieve (5) and end sieve (6) reduces successively.
8. high-building construction refuse disposal system as claimed in claim 6, it is characterized in that described gravel screen (4) and middle sieve (5) be arranged in parallel, one end of gravel screen (4) and middle sieve (5) all links to each other with carrier pipe (1), all form the obtuse angle with carrier pipe (1), the other end of described gravel screen (4) and middle sieve (5) is provided with discharging chute respectively.
9. high-building construction refuse disposal system as claimed in claim 6, an end that it is characterized in that described end sieve (6) links to each other with the end that middle sieve (5) is provided with discharging chute, and form angle between end sieve (6) and the middle sieve (5), this angle is acute angle, and the other end of described end sieve (6) also is provided with discharging chute.
10. high-building construction refuse disposal system as claimed in claim 1 is characterized in that described dog-house (7) is provided with several.
CN 201320233781 2013-05-03 2013-05-03 High-rise building construction garbage treatment system Expired - Fee Related CN203188568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320233781 CN203188568U (en) 2013-05-03 2013-05-03 High-rise building construction garbage treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320233781 CN203188568U (en) 2013-05-03 2013-05-03 High-rise building construction garbage treatment system

Publications (1)

Publication Number Publication Date
CN203188568U true CN203188568U (en) 2013-09-11

Family

ID=49105435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320233781 Expired - Fee Related CN203188568U (en) 2013-05-03 2013-05-03 High-rise building construction garbage treatment system

Country Status (1)

Country Link
CN (1) CN203188568U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790364A (en) * 2014-01-13 2014-05-14 中建三局集团有限公司 High-rise building garbage transportation system
CN106013731A (en) * 2016-06-03 2016-10-12 刘祥生 Household garbage guiding and conveying device
CN108643517A (en) * 2018-05-17 2018-10-12 江西联保工程咨询有限公司 One kind being used for construction site construction waste collection device
CN113463881A (en) * 2021-07-19 2021-10-01 詹晓君 High-rise building is with screening building rubbish recovery unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790364A (en) * 2014-01-13 2014-05-14 中建三局集团有限公司 High-rise building garbage transportation system
CN103790364B (en) * 2014-01-13 2016-02-24 中建三局集团有限公司 A kind of highrise building garbage transport system
CN106013731A (en) * 2016-06-03 2016-10-12 刘祥生 Household garbage guiding and conveying device
CN108643517A (en) * 2018-05-17 2018-10-12 江西联保工程咨询有限公司 One kind being used for construction site construction waste collection device
CN108643517B (en) * 2018-05-17 2019-06-07 江西联保工程咨询有限公司 One kind being used for construction site construction waste collection device
CN113463881A (en) * 2021-07-19 2021-10-01 詹晓君 High-rise building is with screening building rubbish recovery unit

Similar Documents

Publication Publication Date Title
KR100878841B1 (en) A sortting preparation system of sand and aggregate
CN104549619B (en) Dry-method sand manufacturing production line and sand method processed
CN203188568U (en) High-rise building construction garbage treatment system
CN108176697A (en) Build composting sorting total system and processing method
CN108237135A (en) A kind of equipment of building waste pretreatment system
CN201442005U (en) Construction waste comprehensive treatment equipment
CN105396781B (en) Vibrate pneumatic separator
KR20130138626A (en) The foreign material sorting apparatus which is contained in construction waste
CN103962302B (en) A kind of screening machine and screening plant thereof
CN211274779U (en) Solid construction waste cyclic utilization processing system
CN103331287A (en) Method and system for comprehensively treating building solid wastes
JP2011050959A (en) Waste sorting system
CN103586257A (en) Construction waste treatment system
CN104588314A (en) Dustless broken sorting facilities of coal gangue
KR20120052617A (en) System sorting crushed aggregates
CN111744941A (en) Decoration garbage disposal method
CN107350263A (en) A kind of decoration garbage and/or tear room rubbish joint disposal and Application way open
CN107309249A (en) A kind of stacked construction refuse resource processing equipment
CN204523544U (en) A kind of building waste screening machine various articles collecting apparatus
CN207592419U (en) A kind of building waste specification processing system
CN203526190U (en) Construction waste treatment system
CN203356180U (en) Comprehensive processing system for building solid wastes
CN106064113A (en) Novel melting quartz sand production line
CN108906301A (en) A kind of efficient dry-method sand manufacturing production line
CN213377142U (en) Construction waste mud stone separation crushing screening grading production system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130911

Termination date: 20210503

CF01 Termination of patent right due to non-payment of annual fee