CN203188186U - Retaining wall structure of hydropower station plant at dam heel - Google Patents

Retaining wall structure of hydropower station plant at dam heel Download PDF

Info

Publication number
CN203188186U
CN203188186U CN2013201407887U CN201320140788U CN203188186U CN 203188186 U CN203188186 U CN 203188186U CN 2013201407887 U CN2013201407887 U CN 2013201407887U CN 201320140788 U CN201320140788 U CN 201320140788U CN 203188186 U CN203188186 U CN 203188186U
Authority
CN
China
Prior art keywords
factory building
plant
earth
retaining wall
sloping core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013201407887U
Other languages
Chinese (zh)
Inventor
陈本龙
慕洪友
湛正刚
李清石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN2013201407887U priority Critical patent/CN203188186U/en
Application granted granted Critical
Publication of CN203188186U publication Critical patent/CN203188186U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a retaining wall structure of a hydropower station plant at a dam heel. The retaining wall structure comprises a gravity balancing platform (2) located at the bottom of the outer side of an earth-rock dam (9), an inclined wall (1) is arranged on one side, close to the plant, of the top of the gravity balancing platform (2), backfilling stone ballast (8) is arranged between the inclined wall (1) and the earth-rock dam (9), one side, close to the plant, of the gravity balancing platform (2) is connected with a plant bottom board (4) through construction joints (5), water stopping pieces (6) are arranged in the construction joints (5), and the water stopping pieces (6) and the construction joints (5) are vertically arranged. The retaining wall structure is combined with a retaining wall at the end portion of the plant and can serve as a permanent water retaining wall structure of the plant, and engineering investment is saved; a transportation channel is arranged in the wall and connected with a penstock construction cave, so that construction of penstocks is convenient; the backfilling stone ballast outside the wall is connected with an incoming highway, so that the traffic problem of entering the plant is solved. The retaining wall structure has the advantages of being multipurpose, and beneficial for shortening water diversion pipelines and saving the engineering investment.

Description

A kind of base of dam powerhouse of hydropower station wall-retaining structure
Technical field
The utility model relates to a kind of base of dam powerhouse of hydropower station wall-retaining structure, belongs to base of dam powerhouse of hydropower station construction engineering technical field.
Background technology
In the hydroelectric project, the power plant building usually is arranged in the limit, riverbank near the earth and rockfill dam base of dam.When building the power plant building, be direct base of dam excavation factory building foundation ditch at earth and rockfill dam at present, in foundation ditch, build factory building foundation, carry out construction of hydropower then.Because factory building is nearer apart from earth and rockfill dam, may have ratchel during the earth and rockfill dam construction and roll into the factory building foundation ditch, have a strong impact on the construction safety of factory building.In addition, a penstock construction hole and incoming highway are arranged comparatively difficulty.
Summary of the invention
The purpose of this utility model is, a kind of base of dam powerhouse of hydropower station wall-retaining structure is provided, to solve the safety problem of construction of hydropower; Also can solve simultaneously the Layout Problem of a penstock construction hole and incoming highway, to overcome the deficiencies in the prior art.
The technical solution of the utility model:
A kind of base of dam powerhouse of hydropower station wall-retaining structure comprises the weight platform that is positioned at the earth and rockfill dam exterior bottom, and weight platform top is provided with sloping core near factory building one side, is provided with the backfill rock ballast between sloping core and the earth and rockfill dam; The weight platform is connected with the factory building base plate through constuction joint near factory building one side; Be provided with the sealing sheet in the constuction joint; The sealing sheet is vertical with constuction joint to be arranged.
In the aforementioned structure, described sloping core is vertical plane near factory building one side, and the another side of sloping core is the inclined-plane, constitutes thick thin sloping core down.
In the aforementioned structure, be provided with the transport channel that links to each other with a penstock construction hole in the described weight platform.
In the aforementioned structure, described weight platform is provided with one group of joint bar that is connected with factory building base plate, floor or beam steel with sloping core near factory building one side.
In the aforementioned structure, the top of described backfill rock ballast is the road surface that links to each other with incoming highway; The backfill rock ballast is the inclined-plane near earth and rockfill dam one side.
Compared with prior art, the utility model arranges in conjunction with factory building end waterwall, in the power plant building wall-retaining structure is set between earth and rockfill dam, barricade has following major function: the ratchel that 1. prevents the earth and rockfill dam construction rolls into the factory building foundation ditch, guarantees construction of hydropower safety; 2. body of wall can be used as the permanent waterwall body structure of factory building, can save construction investment; 3. body of wall inside arranges a transport channel and penstock construction hole and joins, and makes things convenient for the construction of penstock; 4. wall outer side backfill rock ballast and incoming highway join, and solve factory's traffic problems.The utlity model has the outstanding advantage that a wall is used more, be conducive to shorten the diversion circuit, save construction investment.
Description of drawings.
Fig. 1 is generalized section of the present utility model.
Being labeled as in the accompanying drawing: 1-sloping core, 2-weight platform, 3-transport channel, 4-factory building base plate, 5-constuction joint, 6-sealing sheet, 7-beam steel, 8-rock ballast, 9-earth and rockfill dam, 10-road surface.
The specific embodiment.
The utility model is described in further detail below in conjunction with accompanying drawing, but not as to any restriction of the present utility model.
A kind of base of dam powerhouse of hydropower station wall-retaining structure as shown in Figure 1, comprises the weight platform 2 that is positioned at earth and rockfill dam 9 exterior bottom, and weight platform 2 tops are provided with sloping core 1 near factory building one side, are provided with backfill rock ballast 8 between sloping core 1 and the earth and rockfill dam 9; Weight platform 2 is connected with factory building base plate 4 through constuction joint 5 near factory building one side; Be provided with sealing sheet 6 in the constuction joint 5; Sealing sheet 6 and constuction joint 5 vertical settings.Described sloping core 1 is vertical plane near factory building one side, and the another side of sloping core 1 is the inclined-plane, constitutes thick thin sloping core down.Be provided with the transport channel 3 that links to each other with a penstock construction hole in the described weight platform 2.Described weight platform 2 is provided with one group of joint bar that is connected with factory building base plate 4, floor or beam steel 7 with sloping core 1 near factory building one side.The top of described backfill rock ballast 8 is the road surface 10 that links to each other with incoming highway; Backfill rock ballast 8 is the inclined-plane near earth and rockfill dam 9 one sides.
Implementation process of the present utility model
The utility model in the specific implementation, barricade arranges in conjunction with factory building end waterwall, mainly is made up of interior straight outer oblique sloping core and the weight platform of balance body of wall, sloping core and weight platform are the overall structures that employing concreting forms, internal configurations has reinforcing bar.Sloping core is upright near factory building one side, can make things convenient for the layout of the inner electromechanical equipment of factory building; Sloping core tilts near earth and rockfill dam one side, can increase the resistance of barricade, to increase the stability of barricade.The weight platform is to arrange in the sloping core bottom to earth and rockfill dam one side to extend and have a certain thickness concrete structure, weight platform inside arranges transport channel, weight platform top backfill rock ballast makes end face constitute the road surface that joins with incoming highway, weight platform and backfill rock ballast can increase the resistance of barricade, increase the stability of barricade.At the inner transport channel that joins with a penstock construction hole that arranges of weight platform, weight platform top backfill rock ballast and incoming highway join.
The present invention can implement by shown in Figure 1:
After the factory building excavation of foundation pit is finished, at first construct the factory building barricade at foundation ditch near earth and rockfill dam one side, between earth and rockfill dam, form the barrier of blocking at factory building, roll into the factory building foundation ditch with the ratchel that prevents the earth and rockfill dam construction, jeopardize mill construction and constructor's safety; The factory building barricade is constructed according to the following steps:
A, carry out the concrete construction of weight platform; Between weight platform and factory building base plate, constuction joint is set and is connected joint bar, and in constuction joint, bury the sealing sheet underground.Reserve transport channel in the weight platform, transport channel links to each other with a penstock construction hole, to solve the transportation problem of penstock work progress.
B, carry out the sloping core concrete construction at the weight platform; Remain for the joint bar that is connected with floor or beam steel at sloping core in advance near factory building one side and floor correspondence position, in order to when carrying out the factory building floor slab construction, floor or beam steel and joint bar are welded, make floor or beam steel and sloping core connect into overall structure.
C, on the top of weight platform and the outside backfill rock ballast of sloping core; On the top of weight platform and during the outside backfill rock ballast of sloping core, the top of backfill rock ballast is the road surface that links to each other with incoming highway; The backfill rock ballast is the inclined-plane near earth and rockfill dam one side, in order to the stone that stops earth and rockfill dam when construction and can be used as the gutter.

Claims (5)

1. base of dam powerhouse of hydropower station wall-retaining structure, it is characterized in that: comprise the weight platform (2) that is positioned at earth and rockfill dam (9) exterior bottom, weight platform (2) top is provided with sloping core (1) near factory building one side, is provided with backfill rock ballast (8) between sloping core (1) and the earth and rockfill dam (9); Weight platform (2) is connected with factory building base plate (4) through constuction joint (5) near factory building one side; Be provided with sealing sheet (6) in the constuction joint (5); Sealing sheet (6) and the vertical setting of constuction joint (5).
2. according to the described structure of claim 1, it is characterized in that: described sloping core (1) is vertical plane near factory building one side, and the another side of sloping core (1) is the inclined-plane, constitutes thick thin sloping core down.
3. according to the described structure of claim 1, it is characterized in that: be provided with the transport channel (3) that links to each other with a penstock construction hole in the described weight platform (2).
4. according to the described structure of claim 1, it is characterized in that: described weight platform (2) is provided with one group of joint bar that is connected with factory building base plate (4), floor or beam steel (7) with sloping core (1) near factory building one side.
5. according to the described structure of claim 1, it is characterized in that: the road surface (10) of the top of described backfill rock ballast (8) for linking to each other with incoming highway; Backfill rock ballast (8) is the inclined-plane near earth and rockfill dam (9) one sides.
CN2013201407887U 2013-03-26 2013-03-26 Retaining wall structure of hydropower station plant at dam heel Expired - Fee Related CN203188186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013201407887U CN203188186U (en) 2013-03-26 2013-03-26 Retaining wall structure of hydropower station plant at dam heel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013201407887U CN203188186U (en) 2013-03-26 2013-03-26 Retaining wall structure of hydropower station plant at dam heel

Publications (1)

Publication Number Publication Date
CN203188186U true CN203188186U (en) 2013-09-11

Family

ID=49105056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013201407887U Expired - Fee Related CN203188186U (en) 2013-03-26 2013-03-26 Retaining wall structure of hydropower station plant at dam heel

Country Status (1)

Country Link
CN (1) CN203188186U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911976A (en) * 2014-03-17 2014-07-09 高文标 Drainage-type water utilization engineering scheme

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911976A (en) * 2014-03-17 2014-07-09 高文标 Drainage-type water utilization engineering scheme
CN103911976B (en) * 2014-03-17 2016-08-31 高文标 Banish formula water utilizing works structure implementation method

Similar Documents

Publication Publication Date Title
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN203498799U (en) Prefabricated hollow pipe pile water-facing envelop enclosure
CN108979663B (en) Subway station main body structure construction method adopting temporary middle column support
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN203188186U (en) Retaining wall structure of hydropower station plant at dam heel
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN208472743U (en) Assembled cofferdam structure
CN104074176A (en) Construction method and structure of dam toe hydropower station workshop retaining wall
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN104120696B (en) Environment-friendly type slope sticking type trashrack structure and construction method thereof
CN113818446B (en) Tunnel foundation pit construction method for traversing non-navigable river channel
CN109881661A (en) Assembled underground continuous wall transverse connection structure
CN202945618U (en) Steel plate column joint of underground diaphragm wall
CN206035044U (en) Prefabricated assembled underground granary of plastic cover echelonment
CN209084162U (en) A kind of Large Underground pipeline anchor block
CN106223361A (en) Gravity Retaining Wall structure with culvert and construction method thereof
CN203113349U (en) Foundation trench shoring lattice type end structure
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN206189964U (en) Circular underground granary of prefabricated assembled of steel plated in slot -in type
CN206681016U (en) Dash earth-retaining building structure
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN217104940U (en) Be applicable to prevention of seepage water structure for hydraulic engineering construction
CN206035050U (en) Prefabricated bulkhead underground granary of slot -in type endocyst plastics
CN110528542A (en) Assembled cofferdam structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

CP01 Change in the name or title of a patent holder

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee after: CHINA POWER CONSRTUCTION GROUP GUIYANG SURVEY AND DESIGN INSTITUTE Co.,Ltd.

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: HydroChina Guiyang Engineering Corp.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130911

Termination date: 20190326

CF01 Termination of patent right due to non-payment of annual fee