Copper tube clamping mechanism Download PDFInfo
- Publication number
- CN203184931U CN203184931U CN 201320055154 CN201320055154U CN203184931U CN 203184931 U CN203184931 U CN 203184931U CN 201320055154 CN201320055154 CN 201320055154 CN 201320055154 U CN201320055154 U CN 201320055154U CN 203184931 U CN203184931 U CN 203184931U
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- clamp
- chute
- cylinder
- copper tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a copper tube clamping mechanism which comprises a copper tube clamp and a control mechanism for controlling the copper tube clamp to move up and down. The copper tube clamp is installed on a second sliding groove of the control mechanism through a connector in a sliding mode. The copper tube clamping mechanism can clamp or loosen a copper tube. After the copper tube is clamped, a glass tube is moved to be sleeved out of a light absorption piece sleeve with the copper tube. Thus, the inner wall of the glass tube is effectively prevented from being scratched, and assembling quality is greatly improved.
Description
Technical field
The utility model is specifically related to a kind of copper pipe clamp mechanism, belongs to a kind of frock clamp.
Background technology
The extinction sheet is to be used in the field of emitting light and heat, utilize the extinction sheet to absorb the luminous energy generating of generating heat, in order to increase the pyroconductivity of extinction sheet, below the extinction sheet, be provided with copper pipe and carry out heat and conduct, the extinction sheet that needs during use to have copper pipe is put into glass tube, need artificial hand to hold copper pipe and insert glass tube, when holding, be easy to generate and rock, copper pipe can be crooked, thereby the inwall scratch of glass tube influences assembling quality, also wastes time and energy.
The utility model content
Insert in the glass tube in order to overcome the extinction sheet that manually will have copper pipe in the prior art, waste time and energy, be easy to generate and rock, with the inwall scratch of glass tube, influence the problem of assembling quality, copper pipe clamp mechanism of the present utility model can clamp copper pipe or unclamp, after the clamping, mobile glass tube, be enclosed within outside the extinction sheet cover that has copper pipe, the inwall that can effectively prevent glass tube has been improved assembling quality greatly by scratch.
In order to achieve the above object, the technical scheme that adopts of the utility model is:
A kind of copper pipe clamp mechanism is characterized in that: comprise the copper pipe anchor clamps and be used for the controlling organization of the upper and lower movement of copper pipe anchor clamps, described copper pipe anchor clamps are slidingly mounted on second chute of controlling organization by connector.
Aforesaid a kind of copper pipe clamp mechanism, it is characterized in that: described copper pipe anchor clamps comprise clamp base, one end of clamp base fixedly has baffle plate, the other end fixedly has first cylinder, described clamp base is provided with first chute, be placed with sliding clamp in described first chute, one side of described sliding clamp is connected with the catch bar of first cylinder, be provided with return spring between opposite side and the baffle plate, described copper pipe baffle plate is provided with the return spring installing hole, described baffle plate is provided with strap, is used for placing copper pipe between described strap and the sliding clamp.
Aforesaid a kind of copper pipe clamp mechanism is characterized in that: described sliding clamp is placed the copper pipe place and is provided with the semicircle draw-in groove that is complementary with copper pipe.
Aforesaid a kind of copper pipe clamp mechanism is characterized in that: also be provided with installing hole on the described clamp base, fixedly connected with connector by installing hole.
Aforesaid a kind of copper pipe clamp mechanism is characterized in that: described sliding clamp is L shaped shape.
Aforesaid a kind of copper pipe clamp mechanism, it is characterized in that: described controlling organization comprises second cylinder and chute placing plate, described chute placing plate is vertical placement, and a side is provided with second chute, described second cylinder is positioned at the below of chute placing plate, and the connecting rod of described second cylinder is connected with connector on being installed in second chute.
The beneficial effects of the utility model are: copper pipe clamp mechanism of the present utility model can clamp copper pipe or unclamp, after the clamping, mobile glass tube, be enclosed within outside the extinction sheet cover that has copper pipe, the inwall that can effectively prevent glass tube has been improved assembling quality greatly by scratch.
Description of drawings
Fig. 1 is the structural representation of copper pipe clamp mechanism of the present utility model.
Fig. 2 is the structural representation of copper pipe anchor clamps of the present utility model.
Fig. 3 is the structural representation of controlling organization of the present utility model.
The mark implication of accompanying drawing is as follows:
101: the copper pipe anchor clamps; 102: controlling organization; 103: clamp base; 2: glass extinction pipe; 3: the extinction sheet; 4: the first chutes; 5: the first cylinders; 6: catch bar; 7: semicircle draw-in groove; 8: the return spring installing hole; 9: strap; 10: installing hole; 11: copper pipe; 12: the second cylinders; 13: the second chutes; 14: the chute placing plate.
The specific embodiment
Below in conjunction with Figure of description, the utility model is further described.
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of copper pipe clamp mechanism, comprise copper pipe anchor clamps 101 and be used for the controlling organization 102 of copper pipe anchor clamps 101 upper and lower movements, copper pipe anchor clamps 101 are slidingly mounted on by connector 103 on second chute 13 of controlling organization 102, and connector 103 drives copper pipe anchor clamps 101 and slides at second chute 13 of controlling organization 102.
Copper pipe anchor clamps 101 comprise clamp base 1, one end of clamp base 1 fixedly has baffle plate 2, the other end fixedly has first cylinder 5, clamp base 1 is provided with first chute 4, be placed with sliding clamp 3 in first chute 4, one side of sliding clamp 3 is connected with the catch bar 6 of first cylinder 5, be provided with return spring between opposite side and the baffle plate 2, copper pipe baffle plate 2 is provided with return spring installing hole 8, baffle plate 2 is provided with strap 9, be used for placing copper pipe 11 between strap 9 and the sliding clamp 3, strap 9 is used for supporting the extinction plate that links to each other with copper pipe 11 with sliding clamp 3, sliding clamp 3 is L shaped shape, and horizontal edge slidably reciprocates in groove 4, and the placement copper pipe place of sliding clamp 3 is provided with the semicircle draw-in groove 7 that is complementary with copper pipe 11, convenient fixedly copper pipe 11, do not produce and rock, also be provided with installing hole 10 on the clamp base 1, fixedly connected with connector 103 by installing hole 10.
Controlling organization 102 comprises second cylinder 12 and chute placing plate 14, chute placing plate 14 is vertical placement, and a side is provided with second chute 13, second cylinder 12 is positioned at the below of chute placing plate 14, the connecting rod of second cylinder 12 is connected with connector 103 on being installed in second chute 13, the connecting rod of second cylinder 12 promotes connector 103 and moves up and down, and moves up and down thereby drive copper pipe anchor clamps 101.
The course of work of the present utility model is as follows, a plurality of copper pipe clamp mechanism are distributed in the below of copper pipe, control first cylinder 5 and promote catch bar 6 reaches, sliding clamp 3 clamps copper pipe 11, mobile glass tube, just can be inserted in the extinction sheet of copper pipe anchor clamps front end, controlling first cylinder 5 then moves after with catch bar 6, return spring is with sliding clamp 3 pop into position, control second cylinder, 12 drop links then, drive copper pipe anchor clamps 101 and move down, glass tube just can pass through this copper pipe clamp mechanism smoothly, by continuing reach, during to next copper pipe clamp mechanism, repeat above-mentioned steps, thereby the whole extinction sheet that has copper pipe 11 all is inserted in glass tube inside, prevent that effectively the inwall of glass tube from by scratch, having improved assembling quality greatly.
More than show and described basic principle of the present utility model, principal character and advantage.The technical staff of the industry should understand; the utility model is not restricted to the described embodiments; that describes in above-described embodiment and the specification just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (6)
1. copper pipe clamp mechanism, it is characterized in that: comprise copper pipe anchor clamps (101) and be used for the controlling organization (102) of the upper and lower movement of copper pipe anchor clamps (101), described copper pipe anchor clamps (101) are slidingly mounted on second chute (13) of controlling organization (102) by connector (103).
2. a kind of copper pipe clamp mechanism according to claim 1, it is characterized in that: described copper pipe anchor clamps (101) comprise clamp base (1), one end of clamp base (1) fixedly has baffle plate (2), the other end fixedly has first cylinder (5), described clamp base (1) is provided with first chute (4), be placed with sliding clamp (3) in described first chute (4), one side of described sliding clamp (3) is connected with the catch bar (6) of first cylinder (5), opposite side and baffle plate are provided with return spring between (2), described copper pipe baffle plate (2) is provided with return spring installing hole (8), described baffle plate (2) is provided with strap (9), is used for placing copper pipe between described strap (9) and the sliding clamp (3).
3. a kind of copper pipe clamp mechanism according to claim 2 is characterized in that: described sliding clamp (3) is placed the copper pipe place and is provided with the semicircle draw-in groove (7) that is complementary with copper pipe.
4. a kind of copper pipe clamp mechanism according to claim 2 is characterized in that: also be provided with installing hole (10) on the described clamp base (1), fixedly connected with connector (103) by installing hole (10).
5. a kind of copper pipe clamp mechanism according to claim 2, it is characterized in that: described sliding clamp (3) is L shaped shape.
6. a kind of copper pipe clamp mechanism according to claim 2, it is characterized in that: described controlling organization (102) comprises second cylinder (12) and chute placing plate (14), described chute placing plate (14) is vertical placement, and a side is provided with second chute (13), described second cylinder (12) is positioned at the below of chute placing plate (14), and the connecting rod of described second cylinder (12) is connected with connector (103) on being installed in second chute (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320055154 CN203184931U (en) | 2013-01-31 | 2013-01-31 | Copper tube clamping mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320055154 CN203184931U (en) | 2013-01-31 | 2013-01-31 | Copper tube clamping mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203184931U true CN203184931U (en) | 2013-09-11 |
Family
ID=49101825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320055154 Expired - Fee Related CN203184931U (en) | 2013-01-31 | 2013-01-31 | Copper tube clamping mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203184931U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105523872A (en) * | 2016-01-18 | 2016-04-27 | 中国兵器工业第二一三研究所 | Quick clamping mechanism of explosive tube for automatic loading of metal cable explosive |
CN107838845A (en) * | 2017-10-27 | 2018-03-27 | 惠州市美呈空间装饰设计工程有限公司 | A kind of decoration fixes shaft clamping device |
-
2013
- 2013-01-31 CN CN 201320055154 patent/CN203184931U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105523872A (en) * | 2016-01-18 | 2016-04-27 | 中国兵器工业第二一三研究所 | Quick clamping mechanism of explosive tube for automatic loading of metal cable explosive |
CN105523872B (en) * | 2016-01-18 | 2018-08-31 | 中国兵器工业第二一三研究所 | A kind of pencil Quick assembling mechanism for mfg. metal cord medicament automatic Loading |
CN107838845A (en) * | 2017-10-27 | 2018-03-27 | 惠州市美呈空间装饰设计工程有限公司 | A kind of decoration fixes shaft clamping device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202894685U (en) | Pipe clamp automatic assembling mechanism | |
CN103586657A (en) | Mechanism and method for automatically assembling power-saving lamp tube and lamp holder lower cover | |
CN203937342U (en) | A kind of metallic article marking equipment | |
CN103111841A (en) | Copper pipe clamping mechanism | |
CN203184931U (en) | Copper tube clamping mechanism | |
CN104889558B (en) | Conveying, positioning and spot-welding device of battery spot-welder | |
CN203143554U (en) | Vibration discharging mechanism for bulb clamping plates and clamping pieces | |
CN203659808U (en) | Filament foot bending machine of double-capped lamp | |
CN103111826A (en) | Copper pipe clamp | |
CN203712210U (en) | Automatic sleeve changing device | |
CN203184904U (en) | Copper tube clamp | |
CN204329783U (en) | A kind of firework assembling machine push away heat-extraction system | |
CN203592282U (en) | Device used for automatic assembly of energy-saving lamp tube and lamp cap lower cover | |
CN202894980U (en) | Grinding machine double row feeding equipment | |
CN103635025A (en) | Online printed circuit board (PCB) programming tool | |
CN203184932U (en) | Glass light suction tube automatic assembling device | |
CN202639571U (en) | Double-station flame soldering machine | |
CN209839999U (en) | Lamp convenient to disassemble and assemble | |
CN104128535B (en) | LED lamp tube end-connector shaping tool | |
CN206982109U (en) | A kind of radiating subassembly bottom plate grafting installing mechanism | |
CN103111840A (en) | Glass light absorption pipe automatic assembly device | |
CN104959807A (en) | Automatic assembling device for spring and oil seal | |
CN204740175U (en) | Anchor clamps on falling ball impact test machine | |
CN205158829U (en) | Testing stand is shielded to LED | |
CN203185274U (en) | Glass tube clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |