China
Prior art keywords
stone
tenon
balustrade
building stones
stone balustrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320009834
Other languages
Chinese (zh)
Inventor
周益
唐纪军
张喜平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU GARDEN DEVELOPMENT Co Ltd
Original Assignee
SUZHOU GARDEN DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU GARDEN DEVELOPMENT Co Ltd filed Critical SUZHOU GARDEN DEVELOPMENT Co Ltd
Priority to CN 201320009834 priority Critical patent/CN203174968U/en
Application granted granted Critical
Publication of CN203174968U publication Critical patent/CN203174968U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Artificial Fish Reefs (AREA)

Abstract

The utility model discloses a stone balustrade and the manufacturing and installing technology thereof. The stone balustrade is formed by assembly of more than two separated building stone components, wherein tenon assemblies with matched sizes and shapes are arranged at positions where the building stone components are connected, each tenon assembly comprises a rigid rabbet arranged in a hole of a building stone component on one side and a mortise formed in the body of a building stone component on the other side, and the building stone components are machine-shaped independently and assembled into a whole through the tenon assemblies to form the stone balustrade. According to the technical scheme and compared with a traditional manufacturing and installing technology of a stone balustrade, the stone balustrade and the manufacturing and installing technology thereof have the obvious advantages that material drawing requirements of stone materials are reduced due to the fact that assembly is achieved after separate machining, and therefore the stone materials are saved; mechanized machining can be carried out locally so that large-scale manufacturing can be achieved conveniently; transportation is convenient, and the manufacturing and installing efficiency of the stone balustrade as ancient architecture in parks is greatly improved.

Description

A kind of stone balustrade
Technical field
The utility model relates to a kind of gardens ancient building manufacture craft, relates in particular to the wherein fabrication and installation technology of a kind of non-whole stone processing of stone balustrade.
Background technology
As shown in Figure 1, be the common stone balustrade of tradition in the ancient building of gardens.Visible this stone balustrade of diagram only can be divided into armrest part, breast board portion and drag mud portion on shape and function for whole stone processes.But the general whole celt skies that adopt of traditional method for making are done the vase support more at the middle part, top is handrail, and breast board cutter side in bottom delays, and the both sides is aided with stone column and laterally continues.
But adopt this kind stone balustrade fabrication and installation technology, shortcoming of its whole work made of stones is more, and for example: a, building stones piece face are bigger, and material price is big, the general building stones that need man-made recoveries more; B, manufacture difficulty are big, produce render a service low, most of manual manufacture that adopts; C, because big, the deal of the stone balustrade scale of construction is heavy, transportation, install inconvenient.
Summary of the invention
In view of the defective that above-mentioned prior art exists, the purpose of this utility model is to propose a kind of stone balustrade, solves stone matter building in the ancient architecture of gardens or stone matter view and is convenient to the problem of making, transport, installing.
Above-mentioned purpose of the present utility model, to be achieved by the following technical programs: a kind of stone balustrade, have armrest part, breast board portion from top to bottom and drag mud portion, it is characterized in that: described stone balustrade forms for the building stones member attaching by two above piecemeals, phase attaching place between the building stones member is provided with the tenon assembly that size and shape are complementary, comprise rigidity tenon and the mortise of being located at the opposite side building stones member itself that connects in the eyelet of being located at a kerbstone material member, all building stones members are by tenon assembly attaching all-in-one-piece stone balustrade.
Further, described tenon assembly is internal hidden type structure.
Further, the size of described eyelet satisfies the inwall of eyelet to the outer wall spacing 2mm~6mm of rigidity tenon, and the degree of depth that described rigidity tenon gos deep into eyelet is 30mm~50mm.
Further, described building stones member is provided with the position line that the position is set for signal rigidity tenon.
Further, fill out between the described building stones member or between the eyelet of building stones member and the rigidity tenon and be provided with stone material glue.
The application implementation of technical solutions of the utility model, its effect of fabrication and installation technology that compares to traditional stone balustrade is remarkable: by splitting the assembling of processing back, reduced the requirement of drawing materials to stone material, be conducive to save building stones; Mechanized Processing can be adopted again in the part, is convenient to the scale operation and makes; Convenient transportation has greatly improved the fabrication and installation efficient of stone balustrade as the gardens ancient architecture simultaneously.
Description of drawings
Fig. 1 is the surface structure schematic diagram of the whole stone processing of tradition stone balustrade.
Fig. 2 is the enforcement schematic diagram that the utility model stone balustrade divides three part processing and fabricatings.
Fig. 3 is the enforcement schematic diagram that the utility model stone balustrade divides seven part processing and fabricatings.
The specific embodiment
The utility model adopts many drawbacks of whole stone machine-shaping at traditional stone balustrade, for improving fabrication and installation efficient and avoiding problem such as building stones destruction Of resources exploitation, innovation has proposed a kind of stone balustrade and fabrication and installation technology thereof, employing is to stone balustrade blocking processing, solves stone matter building in the ancient architecture of gardens or stone matter view and is convenient to the problem of making, transport, installing.
Structure from the utility model stone balustrade, this stone balustrade is for being divided into building stones member more than two according to the monnolithic case of stone balustrade structure with stone balustrade, and the building stones member attaching of those piecemeals forms, phase attaching place between the building stones member is provided with the tenon assembly that size and shape are complementary, comprise rigidity tenon and the mortise of being located at the opposite side building stones member itself that connects in the eyelet of being located at a kerbstone material member, all building stones members pass through tenon assembly attaching all-in-one-piece stone balustrade after finishing the difference processing and fabricating.And the finished product stone balustrade after install, this tenon assembly is internal hidden type structure.
Such scheme also can be optimized design, and for example the size of this eyelet satisfies the inwall of eyelet to the outer wall spacing 2mm~6mm of rigidity tenon, so that fill stone material glue the rigidity tenon is fixed wherein; Be 30mm~50mm and this rigidity tenon gos deep into the degree of depth of eyelet.
Mainly comprise step by step from the fabrication and installation technology of the utility model stone balustrade: I, according to the monnolithic case of stone balustrade structure stone balustrade is divided into building stones member more than two, and processes respectively according to default shape, flower type; II, according to the building stones member attaching corresponding relation more than two, on two relative building stones members, be processed to form eyelet and mortise respectively, and the rigidity tenon placed among the eyelet, adopt the sealing of stone material glue; III, treat rigidity tenon and building stones member jail knot after, with whole building stones component packages of stone balustrade, be transported to on-the-spot and be mounted to one from bottom to top, and between the building stones member, fill out and establish stone material glue and seal admittedly.
Such scheme also can be optimized design, is to make the stone balustrade monnolithic case of finishing after the installation attractive in appearance, and the error of no above the fold or shape can be provided with the position line that the position is set for signal rigidity tenon at this building stones member.According to unitary construction and the dimensional requirement of stone balustrade, calculated and considered rational error, to process tenon based on this required eyelet is set, this is a kind of pursuit of stone balustrade being made quality.In addition, for the eyelet of building stones member and the slit between the rigidity tenon, can fill out and establish stone material glue tenon is carried out security measure.
Following constipation closes the embodiment accompanying drawing, the specific embodiment of the present utility model is described in further detail, so that technical solutions of the utility model are easier to understand, grasp.
Embodiment one:Shown in the enforcement schematic diagram that Fig. 2 the utility model stone balustrade divides three part processing and fabricatings, according to the monnolithic case of figure stone balustrade structure stone balustrade is divided into three blocks of building stones members, what be respectively the breast board portion 2 at armrest part 1, middle part on top and bottom drags mud portion 3.Practical application intermediate hurdles board 2 and drag mud portion 3 to divide is about to stone balustrade and is divided into two blocks of building stones members and gets final product.
On the method for making, at first press the design drawing batching of stone balustrade, namely process required dimension stone with cutting machine; Also need prepare stone material glue and tenon in addition, generally tenon is optional but be not limited to the stainless steel circle tenon 4 of ∮ 12.As previously mentioned, be provided for illustrating that at the building stones member rigidity tenon arranges the position line of position, with the eyelet work of borehole machine, and the tenon that every block of building stones member bottom is installed (in the junction of two blocks of building stones members up and down, is established the stainless steel circle tenon 4 of ∮ 12 than concealed location.Eyelet than the big every limit 3mm~6mm(of the tenon periphery inwall that is eyelet to the crack that forms 3mm~6mm between the outer wall of rigidity tenon), stainless steel circle tenon 4 gos deep into building stones member 30mm~50mm, the tenon installation site should be accurate, in conjunction with wanting firm.Building stones member in the butt joint side arranges corresponding mortise 5.Treat that the tenon of building stones member bottom packs, is transported to the scene after firmly, install from bottom to top again, get final product with the stone material adhesive edge.
Embodiment two:Shown in the enforcement schematic diagram that Fig. 3 the utility model stone balustrade divides seven part processing and fabricatings, according to the monnolithic case of figure stone balustrade structure stone balustrade is divided into three blocks of building stones members earlier, what be respectively the breast board portion 2 at armrest part 1, middle part on top and bottom drags mud portion 3.Again armrest part 1 is lived 12,14 etc. by handrail 11, pinner 15, vase support 13, half vase side and further be divided into polylith building stones member.
Method for making to install similarly to embodiment, will not give unnecessary details now.The benefit that present embodiment is divided polylith building stones member to armrest part is just more obvious.Except labor and material saving, install light outside, a Pin railing can be many people make or mechanical batch machining, and be not subjected to the restriction in angle, space, reduction of erection time.
By the detailed description of above two embodiment, it is just apparent that technical solutions of the utility model compare to the advantage of fabrication and installation technology of traditional stone balustrade: by splitting the assembling of processing back, reduced the requirement of drawing materials to stone material, be conducive to save building stones; Mechanized Processing can be adopted again in the part, is convenient to the scale operation and makes; Convenient transportation has greatly improved the fabrication and installation efficient of stone balustrade as the gardens ancient architecture simultaneously.

Claims (5)

1. stone balustrade, have armrest part, breast board portion from top to bottom and drag mud portion, it is characterized in that: described stone balustrade forms for the building stones member attaching by two above piecemeals, phase attaching place between the building stones member is provided with the tenon assembly that size and shape are complementary, comprise rigidity tenon and the mortise of being located at the opposite side building stones member itself that connects in the eyelet of being located at a kerbstone material member, all building stones members are by tenon assembly attaching all-in-one-piece stone balustrade.
2. a kind of stone balustrade according to claim 1, it is characterized in that: described tenon assembly is internal hidden type structure.
3. a kind of stone balustrade according to claim 1, it is characterized in that: the size of described eyelet satisfies the inwall of eyelet to the outer wall spacing 2mm~6mm of rigidity tenon, and the degree of depth that described rigidity tenon gos deep into eyelet is 30mm~50mm.
4. a kind of stone balustrade according to claim 1 is characterized in that: described building stones member is provided with the position line that the position is set for signal rigidity tenon.
5. a kind of stone balustrade according to claim 1 is characterized in that: fill out between the described building stones member or between the eyelet of building stones member and the rigidity tenon and be provided with stone material glue.
CN 201320009834 2013-01-09 2013-01-09 Stone balustrade Expired - Lifetime CN203174968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320009834 CN203174968U (en) 2013-01-09 2013-01-09 Stone balustrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320009834 CN203174968U (en) 2013-01-09 2013-01-09 Stone balustrade

Publications (1)

Publication Number Publication Date
CN203174968U true CN203174968U (en) 2013-09-04

Family

ID=49071692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320009834 Expired - Lifetime CN203174968U (en) 2013-01-09 2013-01-09 Stone balustrade

Country Status (1)

Country Link
CN (1) CN203174968U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046707A (en) * 2013-01-09 2013-04-17 苏州园林发展股份有限公司 Stone balustrade and making and mounting process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046707A (en) * 2013-01-09 2013-04-17 苏州园林发展股份有限公司 Stone balustrade and making and mounting process thereof

Similar Documents

Publication Publication Date Title
CN104452917A (en) Seamless undermount stainless steel sink system
CN203174968U (en) Stone balustrade
CN103498534B (en) Bionic tree-shaped concrete column and construction method thereof
CN103046707A (en) Stone balustrade and making and mounting process thereof
CN103982026A (en) Solid wood composite floor board with built-in core board structure and manufacturing method of solid wood composite floor board
CN105569437A (en) Stone balustrade and manufacturing and mounting process thereof
CN203320809U (en) Column package structure with circular-arc-shaped aluminum veneers
CN200940324Y (en) Flooring block having edge frames
CN205742840U (en) The mounting assembly of wall decorating veneer
CN102581966B (en) The processing method of hollow stone marble pillars
CN100370105C (en) Profiled template for building and supporting system thereof
CN204997790U (en) Mortise and tenon processing isolated plant that suitability is high
CN105965704A (en) Stone line composite machining method
US8561368B2 (en) Carved solid face door and method of fabrication
CN103590530B (en) The special structure material of glass sunlight house and corresponding glass sunlight house
CN204163337U (en) Lower concealed moulds limit wooden floor
CN104947893A (en) Combined decoration board
CN203867139U (en) Built-in core plate structure solid wood floor
CN206938085U (en) Decorate cellular board
CN102248561B (en) Spliced woodwork showing annual ring grains and manufacturing method thereof
CN205776996U (en) A kind of can the ecological hardwood house roof system of Fast Installation
CN204997791U (en) Mortise and tenon processing isolated plant
CN214034598U (en) Combined decorative moulding
CN201850947U (en) Assembled door with framework structure
CN202718338U (en) Combined core plate for wood decoration system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130904