CN203145004U - Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile - Google Patents

Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile Download PDF

Info

Publication number
CN203145004U
CN203145004U CN 201320165882 CN201320165882U CN203145004U CN 203145004 U CN203145004 U CN 203145004U CN 201320165882 CN201320165882 CN 201320165882 CN 201320165882 U CN201320165882 U CN 201320165882U CN 203145004 U CN203145004 U CN 203145004U
Authority
CN
China
Prior art keywords
steel pipe
power head
rotary power
tube
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320165882
Other languages
Chinese (zh)
Inventor
孔超
龚迪快
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320165882 priority Critical patent/CN203145004U/en
Application granted granted Critical
Publication of CN203145004U publication Critical patent/CN203145004U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile comprises an upper part rotary power head with an auger stem and a lower part rotary power head with a tube joint, the tube joint is connected with the upper end of a steel tube in a sleeved mode, and the steel tube is provided with a connecting device and can be connected with a standard section tube into a whole. Pile forming comprises the steps that the auger stem enters the upper opening of the steel tube, penetrates through the lower part rotary power head to enter the steel tube and is ready at a designed pile position, the lower part rotary power head drives the steel tube to rotate in the clockwise direction to sink into an earth layer, the upper part rotary power head synchronously rotates in the clockwise direction, earth mass entering the steel tube is pushed and lifted upwards by the auger stem and discharged from an earth outlet, the standard section tube is connected to the upper opening of the steel tube in a sleeved mode, the auger stem penetrates through the lower part rotary power head to enter the steel tube and the standard section tube to discharge the entering earth mass and is stopped when the designed and required depth is met, the auger stem is pulled out from the steel tube, and a steel bar cage is arranged in the steel tube and the standard section tube and filled with concrete. The whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile has the advantages that the problem of pollution to city environment in construction based on civil construction engineering piles is eliminated at root, and construction efficiency is obviously improved.

Description

The synchronous immersed tube of the complete long steel pipe retaining wall of stake with revolve the castinplace pile that takes soil
Technical field
The utility model relates to a kind of pile foundation of civil construction project, especially relates to a kind ofly adopting the synchronous immersed tube of the complete long steel pipe retaining wall of stake that the long punching block of full stake manages and protects the dried construction synchronously of fetching earth of wall, spinning sinking pipe and spiral to take native castinplace pile with revolving.
Background technology
Belonging to the most frequently used in the non-extruding earth performance stake type in the existing pile foundation engineering is the holing with slurry wall protection castinplace pile, and this holing with slurry wall protection castinplace pile can be chosen the stake footpath and reach the requirement of design bearing capacity value with stake according to the requirement of design bearing capacity value, and no soil compaction influences; Since pile foundation adopted Commercial Concrete, the concrete quality and reliability of stake was comparatively stable, and is widely used in engineering; In Pile Foundation, it is the bored pile that adopts this mud off that the stake more than 80% is arranged.
Yet, the problem that the bored pile of existing mud off exists is: can cause discarded drilling slurry serious environment pollution in municipal construction, as flow into municipal sewage system, stop up urban discharging pipeline, enter the rivers in city and cause on the riverbed of rivers and rise etc., cause the cross-section of river to dwindle because drilling slurry enters rivers steathily, influence the safety of drainning off floodwaters in city.
Construction 1m 3The concrete of bored pile need 7m 3Clean water produces 4m 3Discarded drilling slurry; For example annual application bored pile is 300,000, and average stake footpath is Φ 800mm, and average long is 50m, then for producing the discarded drilling slurries of 3,000 ten thousand m3, is equivalent to the volume of thirty West Lake, 3 Hangzhoupro.So a large amount of discarded drilling slurries can not find storable place at all.
Thereby the bored pile of existing mud off brings serious urban and rural environment to pollute in the construction of city civil construction project pile foundation inevitably.
The utility model content
Technical problem to be solved in the utility model is a kind of synchronous immersed tube of the long steel pipe retaining wall of full stake that adopts dried soil extracting process and have remarkable pile efficient to be provided at above-mentioned prior art present situation and to revolve the castinplace pile that takes soil.
The utility model solves the problems of the technologies described above the technical scheme that adopts: the synchronous immersed tube of the long steel pipe retaining wall of a kind of full stake with revolve the castinplace pile that takes soil, it is characterized in that, comprise the top rotary power head that is connected with auger stem, this auger stem in a tubular form, this auger stem passes the bottom rotary power head of band soil outlet again, the bottom of this bottom rotary power head is provided with union, this union and steel pipe upper end socket.Its effect is that top rotary power head connection auger stem turns clockwise, and this auger stem runs through the bottom rotary power head again and enters in the steel pipe; Following rotary power head drives the steel pipe edge and is rotated counterclockwise,
Adopting two rotary power heads in upper and lower part is exactly to realize preferably synchronously immersed tube and revolve the function that takes soil;
Described bottom rotary power head is provided with soil outlet; Described auger stem rotation is discharged being pushed into this soil outlet on the spiral shell leaf of the soil body in the steel pipe with rotation.
Described steel pipe is provided with linkage, this linkage comprises sleeve pipe and the interconnective standard paragraphs pipe affixed with described steel pipe bottom, this sleeve pipe periphery is provided with the T-slot of being made up of vertical slot and translot, described standard paragraphs pipe upper end is provided with the rectangle projection, this rectangle bump width matches with the width of described vertical slot, and this rectangle bump height matches with the height of described translot; Its effect is that steel pipe can be connected with the standard paragraphs pipe by linkage, also sinks to soil layer synchronously with the spreading steel pipe; Rectangle projection on the standard paragraphs pipe inserts the vertical slot of sleeve pipe, and then, along with the sleeve pipe with steel pipe rotates, the rectangle projection namely enters translot, namely reaches the purpose that the standard paragraphs pipe is connected with steel pipe.
Described sleeve pipe is provided with mounting flange itself and reinforcing rib, and this mounting flange is used for described steel pipe welding.The effect of mounting flange itself and reinforcing rib is the reliability of guaranteeing between steel pipe and the standard paragraphs pipe that is connected accuracy and connection thereof;
Described rectangle projection arranges 4, and along the circumference uniform distribution setting of described standard paragraphs pipe; So that the joint efficiency between raising steel pipe and the standard paragraphs pipe.
Described this T-slot top is provided with central small hole, and this central small hole and described vertical slot center coincide.
Described rectangle projection center line below is provided with the location small salient point, and this small salient point center, location and described rectangle projection center line coincide.The effect of this location small salient point is the center that shows the rectangle projection, when steel pipe and standard paragraphs pipe must separate when extracting from interface, need only aim at the small salient point of standard paragraphs pipe rectangle projection of the steel pipe vertical slot central small hole on top and bottom on a vertical line, can rapidly steel pipe and standard paragraphs pipe be extracted from interface.
The synchronous immersed tube of a kind of complete long steel pipe retaining wall of stake and the pile step of revolving the castinplace pile that takes soil, comprise the top rotary power head and the bottom rotary power head that are connected with auger stem, described auger stem passes this bottom rotary power head, the bottom of this bottom rotary power head is provided with union, this union and the upper end socket of described steel pipe: the bottom of described bottom rotary power head is with after described union is connected, the socket suitable for reading of this union and described steel pipe; After described top rotary power head connected described auger stem, this auger stem entered the suitable for reading of described steel pipe, and passed described bottom rotary power head and enter in the described steel pipe; In place in design stake position then; Described bottom rotary power head drives described steel pipe and is rotated in a clockwise direction and sinks to soil layer, simultaneously, the described auger stem that is connected with described top rotary power head passes described rotary power head down and enters in the steel pipe, synchronously be rotated in a clockwise direction, the soil body that enters described steel pipe is upwards raised by this auger stem or be interrupted and pull out, the soil body in this steel pipe arrives described bottom rotary power head soil outlet and discharges, continuation with described steel pipe spinning underground layer to taking over the position, extract the suitable for reading of this steel pipe with the auger stem that described top rotary power head is connected, the union that is connected with bottom rotary power head bottom breaks away from the suitable for reading of this steel pipe; Described standard paragraphs pipe box is connected to the suitable for reading of described steel pipe; Described top rotary power head connects described auger stem, this auger stem passes described bottom rotary power head, enter in described steel pipe and the described standard paragraphs pipe, be rotated in a clockwise direction, the soil body that enters this steel pipe is upwards raised by described auger stem or be interrupted and pull out, the soil body in this steel pipe and the standard paragraphs pipe arrives the soil outlet position of bottom rotary power head and discharges, and continuation stops this steel pipe and this standard paragraphs pipe spinning underground layer until the designing requirement degree of depth; Described top rotary power head connects described auger stem, and this auger stem is extracted from the suitable for reading of described steel pipe; The union of the bottom of described bottom rotary power head breaks away from the suitable for reading of described steel pipe; In this steel pipe and standard paragraphs pipe, insert reinforcing cage then, fill concrete; Pull out this steel pipe and standard paragraphs pipe, i.e. pile again.
Compared with prior art, advantage of the present utility model is: adopt the long steel pipe retaining wall of full stake spinning sinking pipe and the dried construction synchronously of fetching earth of spiral again, fundamentally eliminate the pollution of borehole wall-protection mud, especially in the construction of city civil construction project pile foundation, fundamentally solved the pollution difficult problem to urban environment; Next is that efficiency of construction significantly improves.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the sleeve pipe schematic diagram of the utility model embodiment.
Fig. 3 is the utility model embodiment linkage schematic diagram.
Fig. 4 is the utility model embodiment standard paragraphs pipe schematic diagram.
Fig. 5 is the utility model embodiment pile program schematic diagram.
The specific embodiment
Describe in further detail below in conjunction with the utility model of accompanying drawing embodiment.
As Fig. 1~shown in Figure 5, present embodiment adopts following structure particularly: it comprises the top rotary power head 2 that is connected with auger stem 6, and this auger stem 6 in a tubular form and the clockwise direction rotation; This auger stem 6 passes bottom rotary power head 3 again and enters in the steel pipe 1; The bottom of this bottom rotary power head is provided with union 7, this union 7 and steel pipe 1 upper end socket, and this steel pipe 1 drives rotation in the counterclockwise direction by bottom rotary power head 3, as shown in Figure 1;
Synchronously immersed tube with revolve that to take native process be such: bottom rotary power head 3 drives steel pipes 1 spinning sinking pipe, the soil body that enters steel pipe 1 is transferred to pull out by auger stem 6 dextrorotations of last rotary power head 2 connections, and the soil outlet 9 that the soil body is brought to down rotary power head 3 is discharged;
In order to realize the length requirement of different castinplace piles, steel pipe 1 can be connected with standard paragraphs pipe 10 by linkage, with spreading steel pipe 1, and sinks to soil layer synchronously; This linkage comprises sleeve pipe 11 and the interconnective standard paragraphs pipe 10 of steel pipe 1 bottom, and this sleeve pipe is provided with mounting flange 15 and reinforcing rib 16, and this mounting flange is used for steel pipe 1 welding fixing; This sleeve pipe periphery is provided with the T-slot of being made up of vertical slot 13 and translot 14, and this T-slot top is provided with central small hole 4, and this central small hole and vertical slot 13 centers coincide;
Described standard paragraphs pipe 10 upper ends are provided with rectangle projection 8, and the width of this rectangle projection 8 matches with the width of vertical slot 13, and the height of this rectangle projection 8 matches with the height of translot 14;
Rectangle projection 8 on the standard paragraphs pipe inserts the vertical slot 13 of sleeve pipes 11, and then, along with the sleeve pipe 11 with steel pipe 1 rotates, rectangle projection 8 namely enters translot 14 and reaches the purpose that standard paragraphs pipe 10 is connected with steel pipe 1; Make bottom rotary power head 3 transmit moment of torsion to standard paragraphs pipe 10 by steel pipe 1, also namely realized the purpose of spreading steel pipe 1.
Rectangle projection 8 center lines below is provided with location small salient point 5, the effect of this location small salient point 5 is the centers that show rectangle projection 8, when steel pipe 1 and standard paragraphs pipe 10 must separate when extracting from interface, need only aim at the small salient point 5 of central small hole 4 and the standard paragraphs pipe rectangle projection of bottom of steel pipe vertical slot on top on a vertical line, be the rectangle projection in the center of vertical slot, steel pipe 1 and standard paragraphs pipe 10 can be extracted from interface.
After whole soil bodys were got only in the steel pipe, a cleaning stake hole was inserted reinforcing cage 21 then, is poured into concrete 22, pulls out steel pipe 10 in the rotation and goes out ground with standard paragraphs pipe 20, namely finishes the synchronous immersed tube of steel pipe retaining wall of the present utility model and revolves and dig cast in place pile 23;
The utility model is fundamentally eliminated the pollution of borehole wall-protection mud, is to dig the castinplace pile that dried soil extracting process is constructed with the complete long steel pipe retaining wall of stake and with synchronous immersed tube with revolving.
The pile step of present embodiment is:
The first step, the bottom of bottom rotary power head 3 is connected with union 7, this union socket steel pipe 1 suitable for reading, last rotary power head 2 connects auger stem 6, and this auger stem enters the pore of steel pipe 1, passes bottom rotary power head 3 again, enter in the steel pipe 1, in place in design stake position;
Second step, following rotary power head 3 drive steel pipes 1 are rotated in a clockwise direction and sink to soil layer, simultaneously, the auger stem 6 that is connected with last rotary power head passes down rotary power head 3 and enters in the steel pipe 1, synchronously be rotated in a clockwise direction, the soil body that enters steel pipe is upwards raised by this auger stem or be interrupted and pull out, the soil body in this steel pipe arrives down the soil outlet 9 of rotary power head and discharges; To taking over the position, the auger stem that is connected with last rotary power head is extracted the suitable for reading of steel pipe 1 with steel pipe 1 spinning underground layer in continuation, and the union 7 that is connected with following rotary power head bottom breaks away from the suitable for reading of steel pipe 1;
In the 3rd step, the standard paragraphs pipe box is gone into the suitable for reading of steel pipe 10; Top rotary power head 2 connects auger stem 6, this auger stem passes bottom rotary power head 3, enter in steel pipe 1 and the standard paragraphs pipe 10, be rotated in a clockwise direction, the soil body that enters steel pipe 1 is upwards raised by auger stem 6 or be interrupted and pull out, the soil body in steel pipe 1 and the standard paragraphs pipe 10 arrives soil outlet 9 positions of bottom rotary power head 3 and discharges, and continues steel pipe 1 and standard paragraphs pipe 10 spinning underground layers are stopped until the designing requirement degree of depth;
In the 4th step, top rotary power head 2 connects auger stem 6, and this auger stem 6 is extracted from the suitable for reading of steel pipe, and the union 7 of the bottom of bottom rotary power head 3 breaks away from the suitable for reading of standard paragraphs pipe 10; Then, in steel pipe 1 and standard paragraphs pipe 10, insert reinforcing cage 21, fill concrete 22; The union 7 socket standard paragraphs pipes 10 of the bottom of bottom rotary power head 3 suitable for reading, rotary power head 3 drives steel pipe and alternately rotates along clockwise direction with counterclockwise, because each steel pipe section header leaves 20 centimetres of swing offsets, after going up most 20 centimetres of displacements of joint steel pipe rotation, driving down again, the joint steel pipe rotates, if full stake is long 4 section headers are arranged, go up relatively can drive after the joint stake must have (4-1) * 20=60 centimetre and descend the joint steel pipe most, original friction of rest power becomes to move frictional resistance behind swing offset, rotary power head 3 drives standard paragraphs pipe 10 and rotatablely moves with steel pipe 1 alternating direction, make this steel pipe and the frictional resistance of soil property on every side descend significantly, this steel pipe all can be extracted ground with very little uplift force, namely finish the synchronous immersed tube of the complete long steel pipe retaining wall of stake and revolve the castinplace pile that takes soil.

Claims (7)

  1. The synchronous immersed tube of the complete long steel pipe retaining wall of stake with revolve the castinplace pile that takes soil, it is characterized in that, comprise the top rotary power head (2) that is connected with auger stem (6), this auger stem in a tubular form, this auger stem passes bottom rotary power head (3) again, the bottom of this bottom rotary power head is provided with union (7), this union and steel pipe (1) upper end socket.
  2. According to the synchronous immersed tube of the claim 1 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that described bottom rotary power head (3) is provided with soil outlet (9).
  3. According to the synchronous immersed tube of the claim 1 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that, described steel pipe (1) is provided with linkage, this linkage comprises sleeve pipe (11) and the interconnective standard paragraphs pipe (10) affixed with described steel pipe (1) bottom, this sleeve pipe periphery is provided with the T-slot of being made up of vertical slot (13) and translot (14), described standard paragraphs pipe upper end is provided with rectangle projection (8), this rectangle bump width matches with the width of described vertical slot, and this rectangle bump height matches with the height of described translot.
  4. According to the synchronous immersed tube of the claim 3 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that described sleeve pipe (11) is provided with mounting flange (15) and reinforcing rib (16), this mounting flange is used for welding with described steel pipe (1).
  5. According to the synchronous immersed tube of the claim 3 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that described rectangle projection (8) arranges 4, and along the circumference uniform distribution setting of described standard paragraphs pipe (10).
  6. According to the synchronous immersed tube of the claim 3 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that described T-slot top is provided with central small hole (4), this central small hole and described vertical slot (13) center coincide.
  7. According to the synchronous immersed tube of the claim 3 long steel pipe retaining wall of described full stake with revolve the castinplace pile that takes soil, it is characterized in that, described rectangle projection (8) center line below is provided with location small salient point (5), and this small salient point center, location and this rectangle projection (8) center line coincide.
CN 201320165882 2013-03-27 2013-03-27 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile Expired - Fee Related CN203145004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320165882 CN203145004U (en) 2013-03-27 2013-03-27 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320165882 CN203145004U (en) 2013-03-27 2013-03-27 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile

Publications (1)

Publication Number Publication Date
CN203145004U true CN203145004U (en) 2013-08-21

Family

ID=48972545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320165882 Expired - Fee Related CN203145004U (en) 2013-03-27 2013-03-27 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile

Country Status (1)

Country Link
CN (1) CN203145004U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161157A (en) * 2013-03-27 2013-06-19 孔超 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado
WO2016179774A1 (en) * 2015-05-11 2016-11-17 徐州徐工基础工程机械有限公司 Power head of rotary drilling rig and rotary drilling rig
CN108612089A (en) * 2017-03-06 2018-10-02 李海兰 A kind of arc ground pile-forming equipment of municipal administration
CN109056719A (en) * 2018-08-09 2018-12-21 上海二十冶建设有限公司 It is a kind of to pierce formula steel tube for soil-nail with drill bit conversion attachment device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161157A (en) * 2013-03-27 2013-06-19 孔超 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado
CN103161157B (en) * 2013-03-27 2015-02-25 孔超 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado
WO2016179774A1 (en) * 2015-05-11 2016-11-17 徐州徐工基础工程机械有限公司 Power head of rotary drilling rig and rotary drilling rig
CN108612089A (en) * 2017-03-06 2018-10-02 李海兰 A kind of arc ground pile-forming equipment of municipal administration
CN108612092A (en) * 2017-03-06 2018-10-02 李海兰 A kind of arc ground pile-forming apparatus of municipal works
CN108612090A (en) * 2017-03-06 2018-10-02 李海兰 A kind of building lot pile-forming equipment
CN108612088A (en) * 2017-03-06 2018-10-02 李海兰 A kind of ground pile-forming equipment of municipal administration
CN108612091A (en) * 2017-03-06 2018-10-02 李海兰 A kind of arc ground pile-forming apparatus of municipal administration
CN108612090B (en) * 2017-03-06 2019-12-10 杭州富阳鸿祥技术服务有限公司 Arc-shaped foundation pile forming equipment for municipal construction engineering
CN109056719A (en) * 2018-08-09 2018-12-21 上海二十冶建设有限公司 It is a kind of to pierce formula steel tube for soil-nail with drill bit conversion attachment device

Similar Documents

Publication Publication Date Title
CN202117556U (en) Auger driller for moulding concrete piles with different depth and shapes
CN203145004U (en) Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile
CN105114029A (en) Water plugging method for poor sealing borehole in mine laneway
CN108166486A (en) Deep layer buried tube type prefabrication type energy pile pile and its construction technology
CN102852141A (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN107542106A (en) The pipe gallery built using the pavement underground space
WO2021097937A1 (en) Long tunnel water drainage system
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN208900029U (en) A kind of cutter high-pressure rotary-spray drill bit of Novel drill spray one
CN104878745A (en) Pile-forming device with double-helix drill rod and pile-forming method
CN103161157B (en) Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado
CN208056108U (en) A kind of prefabricated assembled underground pipe gallery depression Disease Treatment structure
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN111852556B (en) Forward and reverse drainage method in downward through-layer drilling
CN103742098A (en) Device and method for sealing hole by using returned slag of layer-through drill hole of low drainage roadway of coal mine
CN201443382U (en) Downhole dosing device
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN102536248A (en) Replacement method for filling retarded cement paste in annular space of freezing pipe
CN205142817U (en) Alkali device falls in saline soil reclamation wind -force vacuum
CN201650102U (en) Drilling mechanism of compound rotary drilling rig
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN207673287U (en) A kind of jet-propelled high-efficiency helical drilling tool
CN102155157B (en) Spiral drilling machine for forming concrete piles of different depths and shapes
CN212716747U (en) Forward and reverse drainage device in downward through-layer drilling
CN209178989U (en) A kind of PHC tubular pole anti-freeze expansion processing unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20160327