CN203118042U - Mine production planning management information system based on 3G terminal - Google Patents
Mine production planning management information system based on 3G terminal Download PDFInfo
- Publication number
- CN203118042U CN203118042U CN 201320100326 CN201320100326U CN203118042U CN 203118042 U CN203118042 U CN 203118042U CN 201320100326 CN201320100326 CN 201320100326 CN 201320100326 U CN201320100326 U CN 201320100326U CN 203118042 U CN203118042 U CN 203118042U
- Authority
- CN
- China
- Prior art keywords
- information
- network
- coal
- terminal
- production planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a mine production planning management information system based on a 3G terminal. The mine production planning management information system comprises a coal mine information network, an isolation gatekeeper, a coal-mining industry Ethernet ring network, a firewall and a wireless mobile network. The coal-mining industry Ethernet ring network is connected with the coal mine information network through the isolation gatekeeper which is used for achieving information one-way flow. The wireless mobile network is connected with the coal mine information network through the firewall. The coal mine information network is connected with an application server which is used for verifying user identity and dispatching and a database server which is used for storing information. The coal-mining industry Ethernet ring network is connected with a plurality of data acquisition host machines which are used for collecting various professional projects. The wireless mobile network is connected with a management extension set which is used for achieving a dispatching function, and the wireless mobile network is connected with 3G terminal equipment in a wireless mode. The mine production planning management information system based on the 3G terminal is simple in structure, good in using effect, and capable of enabling staff to timely know various professional projects and field operating conditions and timely make adjustments, thereby having a wide application prospect.
Description
Technical field
The utility model relates to a kind of mine production planning management infosystem, specifically relates to a kind of mine production planning management infosystem based on 3G terminal.
Technical background
In recent years, China's coal-mine trade information technology application level is progressively improving, an important height is mentioned in the safety in production in colliery and the raising of production technology day by day, along with the whole nation in recent years recurs a lot of great especially mine safety accidents, safe coal produces the focus of paying close attention to into people, it also is state key construction investment project, and to the Safety of Coal Mine Production early warning, emergency management and rescue scheduling and omnidistance monitor network are all had higher requirement, and will realize operation condition in site is optimized management, seeking a kind of IMIS so becomes the key that addresses this problem.
The utility model content
The purpose of this utility model is to overcome above-mentioned deficiency of the prior art, a kind of mine production planning management infosystem based on 3G terminal is provided, this system can provide every professional program content, production schedule procedural information and administrative analysis information for the staff who uses 3G terminal, the staff can in time be understood field condition, and adjust according to information, be with a wide range of applications.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of mine production planning management infosystem based on 3G terminal, it is characterized in that: comprise the coal information network, isolation gap, colliery industry ethernet ring network, fire wall and mobile radio network, industry ethernet ring network in colliery is by being used for isolation gap and the described coal information network connection of realization information uniflux, mobile radio network joins by fire wall and described coal information network, be connected on the described coal information network for identifying user identity and for the application server of scheduling with for storage database of information server, be connected with a plurality of for the data collection host that every specialty plan is gathered on the described colliery industry ethernet ring network, be connected on the described mobile radio network for the management extension set of realizing scheduling feature, described mobile radio network is wirelessly connected with 3G terminal equipment.
The above-mentioned mine production planning management infosystem based on 3G terminal, it is characterized in that: described data collection host comprises microprocessor and is used to the power module of each electricity consumption module for power supply, the input end of described microprocessor is connected with the load module for input data information, the output terminal of described microprocessor is connected with output module and is used for the display of demonstration information, be connected to communication module on the described microprocessor, be used for the storer of storing data information and for the GPRS module that realizes the spontaneous function of note, be connected to the communication interface modules for the described colliery industry of access ethernet ring network on the described communication module.
The above-mentioned mine production planning management infosystem based on 3G terminal, it is characterized in that: described output module is printer.
The above-mentioned mine production planning management infosystem based on 3G terminal, it is characterized in that: described load module is keyboard.
The utility model compared with prior art has the following advantages:
1, simple in structure, result of use is good.
2, can provide every professional program content, production schedule procedural information and administrative analysis information for the staff who uses 3G terminal, the staff can in time be understood field condition, and adjust according to information, be with a wide range of applications.
Below by drawings and Examples, the utility model is described in further detail.
Description of drawings
Fig. 1 is schematic block circuit diagram of the present utility model.
Fig. 2 is the schematic block circuit diagram of the utility model data collection host.
Description of reference numerals:
1-coal information network; 2-application server;
3-isolation gap; 4-database server;
5-colliery industry ethernet ring network; 6-data collection host;
7-fire wall; 8-mobile radio network;
9-3G terminal equipment; 10-management extension set;
6-1-microprocessor; 6-2-communication module;
6-3-communication interface modules; 6-4-output module;
6-5-storer; 6-6-power module;
6-7-load module; 6-8-display;
6-9-GPRS module.
Embodiment
A kind of mine production planning management infosystem based on 3G terminal as shown in Figure 1, comprise coal information network 1, isolation gap 3, colliery industry ethernet ring network 5, fire wall 7 and mobile radio network 8, colliery industry ethernet ring network 5 passes through to be connected with described coal information network 1 for the isolation gap 3 of realization information uniflux, mobile radio network 8 joins by fire wall 7 and described coal information network 1, be connected on the described coal information network 1 for identifying user identity and for the application server 2 of scheduling with for storage database of information server 4, be connected with a plurality of for the data collection host 6 that every specialty plan is gathered on the described colliery industry ethernet ring network 5, be connected on the described mobile radio network 8 for the management extension set 10 of realizing scheduling feature, described mobile radio network 8 is wirelessly connected with 3G terminal equipment 9.
The data message that described data collection host 6 is gathered comprises the specialty plan of mining, the plan of driving specialty, the plan of protrusion-dispelling specialty, take over the specialty plan, production operation and the management and running production schedule, management site safety information record, equipment logout and material service recorder, a plurality of sectors establishment coal mining specialty plan is separately finished in the described specialty plan of mining, and the personnel of Fei Ben sector can't work out, inquire about the professional plan information of other sectors, the multi-faceted planning data of the specialty of mining plan is described, cook up the complete general picture of coal mining plan from many aspects, planning finish confirm errorless after, report plan, described data collection host 6 gathers the coal mining specialty plan that a plurality of sectors report with arrangement, finally provide a complete production schedule, after plan is set up and is finished, can realize the tracking to plan, and according to the tracking situation, the performance of plan is analyzed;
A plurality of sectors establishment driving specialty plan is separately finished in the plan of described driving specialty, and the personnel of Fei Ben sector can't work out, inquire about the professional plan information of other sectors, the plan of driving specialty provides multi-faceted planning data to describe, and cooks up the complete situation of driving plan from many aspects.Planning is finished and is confirmed to report after errorless, described data collection host 6 gathers the driving specialty plan that a plurality of sectors report with arrangement, finally provide a complete production schedule, after plan is set up and is finished, can realize the tracking to plan, and according to the tracking situation, the performance of plan is analyzed;
The plan of described protrusion-dispelling specialty is at the plan of drilling, the extraction plan, pipeline erection schedule and waterfrac treatment plan, provide the planning data that contains most of outburst prevention measures to describe, comprise at the number of drilling and boring amount and fate, gas drainage amount and fate, plan and the arrangement of all working of the installation situation of pipeline and waterpower pressure hole count etc., formulate perfect as far as possible protrusion-dispelling specialty plan, planning is finished and is confirmed to report after errorless, described data collection host 6 gathers the boring specialty plan that a plurality of sectors report with arrangement, finally provide a complete production schedule, after plan is set up and is finished, can realize the tracking to plan, and planned tracking situation, the performance of plan is analyzed;
Describedly take over professional plan and can realize unified management is carried out in the under-study plan of different operating face, and the query function of providing convenience, complete under-study plan data description is provided simultaneously, as: the working face, construction department, the date of taking over, trend, remaining quantities etc., planning is finished and is confirmed to report after errorless, described data collection host 6 gathers the specialty plan of taking over that a plurality of sectors report with arrangement, finally provide a complete production schedule plan set up finish after, can realize the tracking to plan, and planned tracking situation, the performance of plan is analyzed;
Described production operation and management and running provide the planning chart produced in year and explanation of compilation, monthly production schedules typing or by yearly plan directly generate, day production plan typing or generated by monthly plan, actually finish contrast; The dispatching log that record production abnormal problem and processing are followed the tracks of, yield data is gathered in the progress record of production operation class and drilling depth is noted down is provided simultaneously, also record other and produce relevant content, the issue of port operation meeting summary and problem implementation of conditions information is provided, provide that prediction scheme information is uploaded, query function and scheduling duty management record, production operation and scheduling are worked out and are confirmed to report after errorless, described data collection host 6 is followed the tracks of plan in system, and planned tracking situation, the performance of plan is analyzed;
Described production management plan is added up year, the manufacturing program of a month of production division's establishment on the one hand, can decompose the Average Month Program amount automatically, the manufacturing program of a month detail derives from the specialty plan that each sector reports, finish data integration, issue are carried out in the specialty plan, warning function at excavation work is provided on the other hand, when excavation work enters into certain time period or enters into certain drilling depth, described data collection host 6 sends the early warning information that presets automatically according to the message sink people who arranges, when recipient's login system, can send and see early warning information;
Described site safety information record is the typing work that realizes well head information, three is disobeyed process information, hidden danger process information and safe daily paper information by described data collection host 6, and newly-increased, modification, deletion and query function to the accredited information of special work post personnel are provided simultaneously;
Described equipment logout be by 6 pairs of basic archives of equipment of described data collection host, technical parameter, equipment part, etc. Device File Information register, can Device File Information be inquired about by the device class tree; Provide standby, use, unusual, wait to repair, send information such as repair, leave unused, seal up for safekeeping, wait to give up, scrap, all-the-way tracking is carried out in circulation to equipment, the unit exception failure logging is provided simultaneously, after equipment breaks down, carry out the fault information acquisition record, and can inquire about by conditions such as equipment failure Exception Type, accountability unit;
Described material service recorder is the summary by 6 pairs of material essential informations of described data collection host, plan of needs and neck material management information.
As shown in Figure 2, described data collection host 6 comprises microprocessor 6-1 and is used to the power module 6-6 of each electricity consumption module for power supply, the input end of described microprocessor 6-1 is connected with the load module 6-7 for input data information, the output terminal of described microprocessor 6-1 is connected with output module 6-4 and is used for the display 6-8 of demonstration information, be connected to communication module 6-2 on the described microprocessor 6-1, be used for the storer 6-5 of storing data information and for the GPRS module 6-9 that realizes the spontaneous function of note, be connected to the communication interface modules 6-3 for the described colliery industry of access ethernet ring network 5 on the described communication module 6-2.
In the present embodiment, described output module 6-4 is printer.
In the present embodiment, described load module 6-7 is keyboard.
As depicted in figs. 1 and 2, principle of work of the present utility model is: the staff of each section is sent to data message among the described microprocessor 6-1 by described communication interface modules 6-3 and communication module 6-2 and handles, information after the processing leaves among the described storer 6-5, also show by described display 6-8 simultaneously, the staff is by described load module 6-7 input information, described microprocessor 6-1 controls described GPRS module 6-9 with the production information in colliery, production information, security incident information, and manufacturing schedule and schedule information etc. send to each person in charge with the form of note, described microprocessor 6-1 with the information among the described storer 6-5 by described communication module 6-2 and communication interface modules 6-3, and described colliery industry ethernet ring network 5, isolation gap 3 and coal information network 1 are sent in the described database server 4 and store, when the user need understand information, the user sends a request message by described 3G terminal equipment 9, message is sent in the described management extension set 10 by described mobile radio network 8,10 pairs of information that receive of described management extension set detect and realize scheduling feature according to information, information is sent in the described coal information network 1 by described fire wall 7,2 pairs of described user profile of described application server are carried out authentication, the result shows that this user does not have the rights of using of this function after checking, described application server 2 is by described coal information network 1, fire wall 7 and described mobile radio network 8 send the information of described 3G terminal equipment 9 no rights of using to, the result shows that this user has the rights of using of this function after checking, this moment, information was sent to described database server 4, and the data message that after 4 pairs of information of described database server are analyzed the user is called is by described coal information network 1, fire wall 7 and described mobile radio network 8 send described 3G terminal equipment 9 to.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every according to the utility model technical spirit to any simple modification, change and equivalent structure transformation that above embodiment does, all still belong in the protection domain of technical solutions of the utility model.
Claims (4)
1. mine production planning management infosystem based on 3G terminal, it is characterized in that: comprise coal information network (1), isolation gap (3), colliery industry ethernet ring network (5), fire wall (7) and mobile radio network (8), colliery industry ethernet ring network (5) is connected with described coal information network (1) by the isolation gap (3) that is used for realization information uniflux, mobile radio network (8) joins by fire wall (7) and described coal information network (1), be connected on the described coal information network (1) for identifying user identity and for the application server (2) of scheduling with for storage database of information server (4), be connected with a plurality of for the data collection host (6) that every specialty plan is gathered on the described colliery industry ethernet ring network (5), be connected on the described mobile radio network (8) for the management extension set (10) of realizing scheduling feature, described mobile radio network (8) is wirelessly connected with 3G terminal equipment (9).
2. the mine production planning management infosystem based on 3G terminal according to claim 1, it is characterized in that: described data collection host (6) comprises microprocessor (6-1) and is used to the power module (6-6) of each electricity consumption module for power supply, the input end of described microprocessor (6-1) is connected with the load module (6-7) for input data information, the output terminal of described microprocessor (6-1) is connected with output module (6-4) and is used for the display (6-8) of demonstration information, be connected to communication module (6-2) on the described microprocessor (6-1), be used for the storer (6-5) of storing data information and for the GPRS module (6-9) that realizes the spontaneous function of note, be connected to the communication interface modules (6-3) for the described colliery industry ethernet ring network of access (5) on the described communication module (6-2).
3. the mine production planning management infosystem based on 3G terminal according to claim 2, it is characterized in that: described output module (6-4) is printer.
4. the mine production planning management infosystem based on 3G terminal according to claim 2, it is characterized in that: described load module (6-7) is keyboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320100326 CN203118042U (en) | 2013-03-05 | 2013-03-05 | Mine production planning management information system based on 3G terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320100326 CN203118042U (en) | 2013-03-05 | 2013-03-05 | Mine production planning management information system based on 3G terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203118042U true CN203118042U (en) | 2013-08-07 |
Family
ID=48898366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320100326 Expired - Fee Related CN203118042U (en) | 2013-03-05 | 2013-03-05 | Mine production planning management information system based on 3G terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203118042U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103810573A (en) * | 2014-02-25 | 2014-05-21 | 中国科学院自动化研究所 | Real-time production scheduling management system and method based on mobile terminals |
WO2017152248A1 (en) * | 2016-03-10 | 2017-09-14 | Vale S.A. | Network planning method and mine planning method |
CN111810144A (en) * | 2020-08-28 | 2020-10-23 | 四川长宁天然气开发有限责任公司 | Shale gas well engineering intelligent scheduling method and system |
-
2013
- 2013-03-05 CN CN 201320100326 patent/CN203118042U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103810573A (en) * | 2014-02-25 | 2014-05-21 | 中国科学院自动化研究所 | Real-time production scheduling management system and method based on mobile terminals |
WO2017152248A1 (en) * | 2016-03-10 | 2017-09-14 | Vale S.A. | Network planning method and mine planning method |
CN108702633A (en) * | 2016-03-10 | 2018-10-23 | 淡水河谷公司 | Network plan method and mine planing method |
CN108702633B (en) * | 2016-03-10 | 2021-09-28 | 淡水河谷公司 | Network planning method and mine planning method |
CN111810144A (en) * | 2020-08-28 | 2020-10-23 | 四川长宁天然气开发有限责任公司 | Shale gas well engineering intelligent scheduling method and system |
CN111810144B (en) * | 2020-08-28 | 2023-04-21 | 四川长宁天然气开发有限责任公司 | Shale gas well engineering intelligent scheduling method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chen et al. | Coal mine safety intelligent monitoring based on wireless sensor network | |
CN107798401B (en) | Comprehensive pipe rack intelligent management method based on Internet of things | |
CN102509245B (en) | Temporary grounding wire management method and system | |
CN2856425Y (en) | Safety dynamic monitoring management system of mine | |
CN110957811B (en) | Full-flow intelligent monitoring method and system for temporary grounding wire | |
WO2015081788A1 (en) | System and method for two-level centralized deployment power supply voltage automatic collection | |
CN102708699A (en) | WebGIS (Web Geographic Information System)-based traffic light fault supervision system | |
CN105626149A (en) | Coal mine safety monitoring system based on Internet of Things | |
CN107944284B (en) | Method and system for internal security control of enterprise data | |
CN203118042U (en) | Mine production planning management information system based on 3G terminal | |
CN106251240A (en) | Power transmission network method for early warning based on big data | |
CN106529901A (en) | Integrated management system for construction engineering | |
CN201741234U (en) | City fire-fighting remote monitoring management system | |
CN104155962A (en) | Underground coal mine environment information monitoring system based on Internet of Things | |
CN109341756A (en) | Cable duct of substation environmental monitoring system | |
CN111610759A (en) | Intelligent management system for coal mine production safety | |
CN206115222U (en) | Be applied to energy -conserving management system's of building environment self -adaptation energy -saving monitoring center | |
CN111178551A (en) | Power protection system intelligent decision method based on power protection big data | |
CN103226755A (en) | Energy management device and energy management system | |
CN203706341U (en) | Regional fire alarm system based on Internet of things | |
CN202210236U (en) | Textile industry on-site monitoring system | |
CN203097947U (en) | Coal mine video remote monitoring system base on service-oriented architecture (SOA) | |
CN203038090U (en) | Shale gas exploitation electric control system | |
CN103325003A (en) | Electric power ground lead managing system | |
CN107301606A (en) | A kind of energy management monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130807 Termination date: 20140305 |