CN106529901A - Integrated management system for construction engineering - Google Patents
Integrated management system for construction engineering Download PDFInfo
- Publication number
- CN106529901A CN106529901A CN201610892970.6A CN201610892970A CN106529901A CN 106529901 A CN106529901 A CN 106529901A CN 201610892970 A CN201610892970 A CN 201610892970A CN 106529901 A CN106529901 A CN 106529901A
- Authority
- CN
- China
- Prior art keywords
- management
- module
- project
- management module
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 230000005540 biological transmission Effects 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 107
- 238000013500 data storage Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 239000004973 liquid crystal related substance Substances 0.000 claims description 3
- 238000011112 process operation Methods 0.000 claims description 3
- 230000006870 function Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000034994 death Effects 0.000 description 1
- 231100000517 death Toxicity 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 208000019622 heart disease Diseases 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/10—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a construction engineering integrated management system. The system comprises an integrated processor which is used for core data processing operation, a power supply which is used for transmitting power to the whole system, a memory which is used for storing integrated data, an on-site management module which is used for on-site coordination management of a construction site, and a project management module which is used for engineering project schedule control. The integrated processor is connected with the power supply, the on-site management module, the data transmission module, the memory and the project management module. According to the invention, the construction engineering integrated management system integrates attendance management, GPS positioning, on-site management and other functions into a whole body, which is advantageous for centralized or separate management of construction site admission personnel in large-scale engineering construction; each admission person can be timely notified in case of an emergency; and the information scheduling of the entire project is greatly improved.
Description
Technical field
The present invention relates to a kind of vehicle electric circuitry, specifically a kind of construction work total management system.
Background technology
In recent years, with expanding economy, the paces of domestic capital construction also greatly speed up.But due at present for building
Contractor, laboring service company, rural migrant worker's mode of management are excessively simple, lack effective supervision and management system, therefore for rural migrant worker
Routine work, upper work situation, paying out wages situation management it is more weak, therefore also some unnecessary societies are caused and are entangled
Confusingly.
There is more, extensive management in current workmen's management, be in particular in several aspects:Civilian worker is flowed
Property it is big, in many Engineering Project Implementations, more in the form of professional subpackage, project content is different, and each work post cross-operation is entered
Relatively arbitrarily, Peasant Workers ' Floating is big for appearance, and project management department is difficult accurate management, but construction area generation is related to project under construction
Civilian worker's injures and deaths, project management department is difficult to get rid of relation.Lack into appearance and register, most of civilian worker lacks into appearance registration, project management department
It is difficult to accurately grasp field worker particular number, and cannot detail statistics, once group casualty accident occurs to be difficult to tackle.Lack
Weary professional training, most of civilian worker lack after marching into the arena to project characteristic, difficult point, construction environment, project under construction potential safety hazard point, behaviour
Make the professional knowledge training such as work post, lack electricity consumption, with fire, with safety educations such as gas, anti-falling overhead, deep basal pit, lifting are made
The potential safety hazards such as industry, constructing tunnel lack education.Civilian worker's information is not enough.Project management department grasps not enough to civilian worker's information of marching into the arena, such as the people
Work health, suitable job category are short in understanding, and cause part civilian worker construction and the unconformable work post of own bodies situation, such as
Heart disease and hyperpietic's work high above the ground.
Safety management is weightier than Mount Tai, and project is stablized weightier than Mount Tai.Current construction enterprises strengthen rural migrant worker's fine-grained management work
Make significant, it is extremely urgent, but numerous items manage inadequate specification in the past, and administrative staff lack the managerial ability of specialty, item
The effective informationization means of mesh lack of control, manage to rural migrant worker and manage in extensive property.Rural migrant worker's management work once occurs
Safety and stable problem, easily cause larger social contradications, and consequence is extremely serious, and construction enterprises' social image, enterprise are sent out
Exhibition will make a very bad impression.
The content of the invention
It is an object of the invention to provide a kind of simple structure, construction work total management system easy to use, to solve
The problem proposed in certainly above-mentioned background technology.
For achieving the above object, the present invention provides following technical scheme:
A kind of construction work total management system, including the comprehensive treatment device for core data process operation, for whole
The power supply of system transfers electric energy, the memory for integrated data storage, the field management mould coordinated and managed for building-site
Block and the project management module for construction project scheduling control;The comprehensive treatment device connects power supply, field management mould respectively
Block, data transmission module, memory and project management module.
As the preferred version of the present invention:The field management module is also respectively connected with orientation management module and attendance management
Module, orientation management module connect historical information enquiry module and position orientation management module respectively, and field management module is used for
Third-party site staff's alignment system is accessed, personal information is shared, staff attendance, the message tube of personnel positions inquiry is realized
Reason.
As the preferred version of the present invention:The project management module is also respectively connected with management framework module, information registration
Module and the project plan arrange module, the project plan to arrange module to be also respectively connected with people initiative and arrange module and wage plan peace
Row's module.
As the preferred version of the present invention:The position orientation management module includes that the GPS that admission personnel carry with is fixed
Position device and GPS location liquid crystal display.
As the preferred version of the present invention:The attendance management module is C8U color screen fingerprint attendance machines.
As the preferred version of the present invention:The memory is solid state hard disc.
As the preferred version of the present invention:The data transmission module includes that jtag interface, USB interface and GPRS are wirelessly passed
Defeated module.
As the preferred version of the present invention:The comprehensive treatment device is WINDOWS series computers.
Compared with prior art, the invention has the beneficial effects as follows:Construction work total management system of the present invention is by work attendance pipe
The function such as reason, GPS location, field management collection is together in one, collection when being conducive to large-scale engineering to build to building site admission personnel
In or individually manage, each admission personnel can be notified when running into urgent emergency case in time, while the letter to whole engineering
Breathization scheduling also has greatly improved.
Description of the drawings
Entire block diagrams of the Fig. 1 for construction work total management system.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is referred to, a kind of construction work total management system, including the integrated treatment for core data process operation
Device, for whole system transmit electric energy power supply, for integrated data storage memory, for building-site coordinate and manage
Field management module and for construction project scheduling control project management module;The comprehensive treatment device connects electricity respectively
Source, field management module, data transmission module, memory and project management module.
Field management module is also respectively connected with orientation management module and attendance management module, and orientation management module connects respectively
Historical information enquiry module and position orientation management module, field management module are used for accessing third-party site staff's positioning system
System, shares personal information, realizes staff attendance, the information management of personnel positions inquiry.
Project management module is also respectively connected with management framework module, information Registration Module and the project plan and arranges module, item
Mesh plan arranges module to be also respectively connected with people initiative and arranges module and wage plan arrangement module.
Position orientation management module includes the GPS positioning device and GPS location liquid crystal display that admission personnel carry with.
Attendance management module is C8U color screen fingerprint attendance machines.Memory is solid state hard disc.Data transmission module includes JTAG
Interface, USB interface and GPRS wireless transport modules.Comprehensive treatment device is WINDOWS series computers.
The present invention operation principle be:Using means such as computer technology, network technology, information technologies, it is established that one
Information integration, resource-sharing, powerful rural migrant worker's information management system, improve the holistic management level and peace of engineering troop
Full prevention and control ability, " admission personnel information management system " as the important component part of management system, for for gerentocratic day
Often manage and take security protection to provide accurately and timely information necessary to analysis decision.Promoted by this system platform
Enter civilian worker's management work regulation and standardization, be conducive to carrying out the engineering management business norms of management unit.Rural migrant worker's management essence
Refinement, realizes projects, personnel, the comprehensive organic management of finance.Traditional manual poor efficiency has been abandoned in civilian worker's management
Management mode, all with information-based means, big data management rural migrant worker's information, hierarchy management is apparent, greatly improves management
The validity of data, authenticity and promptness.Various data to producing in civilian worker's essential information and operation process carry out depth
Excavate, flexibly generate various forms, auxiliary is analyzed and predicts.Communication efficiency is lifted, is reduced and is linked up cost.Realize rural migrant worker
Effective accumulation of managerial experiences and data, changes traditional rural migrant worker's extensive management pattern, real to realize by advanced pipe
Reason brings benefits.
For the management of engineering site admission workman, it is divided into the following steps:Step 1, the role-security for dividing user, importing
The identity information of rural migrant worker, formation rural migrant worker's data information storehouse, realize resource-sharing, dynamic management;Step 2, according to different item
Mesh, rural migrant worker's information bank of different bid sections realize the integrated management to the pay of migrant rural workers, including:Record, sign for, change, delete
Except, inquiry, statistics;Step 3, the third-party site staff's alignment system of introducing, share personal information, realize staff attendance, people
Member's position enquiring;Step 4, to Project Process manage, as the management starting point of project, carry out project management, construction part management,
Engineering type is managed;Step 5, rural migrant worker is managed during the form that needs be associated with system, from project management module
Extract each bore data of project for needing, there is provided form, including work attendance form, safety education situation form, paying out wages form;
Step 6, preserve and manage containing sign and information of affixing one's seal scanning originals part, and conveniently can inquire about;Step 7, by mobile phone A PP
Quick Response Code on scanning rural migrant worker's release, shows rural migrant worker's information;As the instrument of video acquisition, mobile phone shooting can be uploaded and regarded
Frequently;Receive safety training, participate in safety examination, link of getting one's salary, available handsets scanning Quick Response Code automatically records;Check statistics
Summary information;Step 8, management of withdrawing from the arena is carried out to rural migrant worker, can carry out that batch is withdrawn from the arena and construction team withdraws from the arena management.
Field management module, for accessing third-party site staff's alignment system, shares personal information, and the personnel of realization examine
The information management of diligent, personnel positions inquiry.
The project management module, for managing to Project Process, as the management starting point of project, carry out project management,
Construction part management, engineering type management.
Construction work total management system of the present invention is by the function such as attendance management, GPS location, field management collection together in one
Body, collectively or individually management when being conducive to large-scale engineering to build to building site admission personnel, energy when running into urgent emergency case
It is enough to notify each admission personnel in time, while the information-based scheduling to whole engineering also has greatly improved.
Claims (8)
1. a kind of construction work total management system, including the comprehensive treatment device for core data process operation, for whole
The power supply of individual system transfers electric energy, the memory for integrated data storage, the field management coordinated and managed for building-site
Module and the project management module for construction project scheduling control;Characterized in that, the comprehensive treatment device connects electricity respectively
Source, field management module, data transmission module, memory and project management module.
2. a kind of construction work total management system according to claim 1, it is characterised in that the field management module
Orientation management module and attendance management module is also respectively connected with, orientation management module connects historical information enquiry module and position respectively
Orientation management module is put, field management module is used for accessing third-party site staff's alignment system, shares personal information, realizes
Staff attendance, the information management of personnel positions inquiry.
3. a kind of construction work total management system according to claim 1, it is characterised in that the project management module
Being also respectively connected with management framework module, information Registration Module and the project plan arranges module, the project plan to arrange module also to distinguish
Connection people initiative arranges module and wage plan to arrange module.
4. a kind of construction work total management system according to claim 2, it is characterised in that the position orientation management
Module includes the GPS positioning device and GPS location liquid crystal display that admission personnel carry with.
5. a kind of construction work total management system according to claim 2, it is characterised in that the attendance management module
For C8U color screen fingerprint attendance machines.
6. a kind of construction work total management system according to claim 1, it is characterised in that the memory is solid-state
Hard disk.
7. a kind of construction work total management system according to claim 1, it is characterised in that the data transmission module
Including jtag interface, USB interface and GPRS wireless transport modules.
8. a kind of construction work total management system according to claim 1, it is characterised in that the comprehensive treatment device is
WINDOWS series computers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610892970.6A CN106529901A (en) | 2016-10-13 | 2016-10-13 | Integrated management system for construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610892970.6A CN106529901A (en) | 2016-10-13 | 2016-10-13 | Integrated management system for construction engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106529901A true CN106529901A (en) | 2017-03-22 |
Family
ID=58332215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610892970.6A Withdrawn CN106529901A (en) | 2016-10-13 | 2016-10-13 | Integrated management system for construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106529901A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107545610A (en) * | 2017-09-30 | 2018-01-05 | 上海法赫桥梁隧道养护工程技术有限公司 | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system |
CN107730203A (en) * | 2017-09-30 | 2018-02-23 | 四川民工加网络科技有限公司 | The management system of builder's information and the discriminating method of builder's information |
CN108647929A (en) * | 2018-03-26 | 2018-10-12 | 崔战宾 | Construction Visualized management system with feedback and method |
CN110334893A (en) * | 2019-04-30 | 2019-10-15 | 深圳市万睿智能科技有限公司 | A kind of management platform system applied to building site |
CN111047302A (en) * | 2019-12-25 | 2020-04-21 | 安徽省交通控股集团有限公司 | Engineering construction project full-life informatization management platform based on accurate collaborative office |
CN111160858A (en) * | 2019-12-25 | 2020-05-15 | 安徽省交通控股集团有限公司 | Big data acquisition system based on thing allies oneself with equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101261700A (en) * | 2008-04-25 | 2008-09-10 | 广东高新兴通信股份有限公司 | An engineering progress management system |
KR20100001875A (en) * | 2008-06-27 | 2010-01-06 | 주식회사 건축사사무소건원엔지니어링 | Method for constructing a value engineering database, computer readable medium storing a program thereof and system for performing the method |
CN105260857A (en) * | 2015-11-16 | 2016-01-20 | 苏州天地微易智能科技有限公司 | Intelligent management system and method thereof for rural migrant workers |
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
-
2016
- 2016-10-13 CN CN201610892970.6A patent/CN106529901A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101261700A (en) * | 2008-04-25 | 2008-09-10 | 广东高新兴通信股份有限公司 | An engineering progress management system |
KR20100001875A (en) * | 2008-06-27 | 2010-01-06 | 주식회사 건축사사무소건원엔지니어링 | Method for constructing a value engineering database, computer readable medium storing a program thereof and system for performing the method |
CN105260857A (en) * | 2015-11-16 | 2016-01-20 | 苏州天地微易智能科技有限公司 | Intelligent management system and method thereof for rural migrant workers |
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107545610A (en) * | 2017-09-30 | 2018-01-05 | 上海法赫桥梁隧道养护工程技术有限公司 | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system |
CN107730203A (en) * | 2017-09-30 | 2018-02-23 | 四川民工加网络科技有限公司 | The management system of builder's information and the discriminating method of builder's information |
CN108647929A (en) * | 2018-03-26 | 2018-10-12 | 崔战宾 | Construction Visualized management system with feedback and method |
CN110334893A (en) * | 2019-04-30 | 2019-10-15 | 深圳市万睿智能科技有限公司 | A kind of management platform system applied to building site |
CN111047302A (en) * | 2019-12-25 | 2020-04-21 | 安徽省交通控股集团有限公司 | Engineering construction project full-life informatization management platform based on accurate collaborative office |
CN111160858A (en) * | 2019-12-25 | 2020-05-15 | 安徽省交通控股集团有限公司 | Big data acquisition system based on thing allies oneself with equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106529901A (en) | Integrated management system for construction engineering | |
CN105260857A (en) | Intelligent management system and method thereof for rural migrant workers | |
CN107665419B (en) | Labor service real-name management system of intelligent building site management and control platform of national power grid | |
CN107358305A (en) | A kind of business model of intelligence community management | |
CN104636879A (en) | Intellectual property operation management service platform | |
CN107103078A (en) | Transformer substation construction complete period digitlization managing and control system based on BIM | |
CN104361445A (en) | Real-time labor management system and management method | |
CN104700227A (en) | Station affair management system platform of power supply station of county level power supply enterprise | |
CN110430246A (en) | Capital construction security management and control system | |
CN104123602A (en) | Intelligent school badge management system and method | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN104050545A (en) | Scientific research teaching management information system | |
CN108830468A (en) | A kind of performance appraisal system | |
CN102467705A (en) | Early warning mechanism for controlling operational risk of container terminal and method for implementing early warning mechanism | |
CN107679841A (en) | A kind of orientation payroll system based on the registration of job site real name | |
CN107564118A (en) | A kind of smart mobile phone fingerprint attendance system | |
CN201838034U (en) | Enterprise comprehensive management system | |
CN203118042U (en) | Mine production planning management information system based on 3G terminal | |
CN205028329U (en) | Building practitioner system of real name processor | |
CN106251041A (en) | Firmly build systematic building engineering comprehensive supervisory systems | |
CN111741064A (en) | Mobile terminal for dispatching and monitoring human resource labor service and monitoring system thereof | |
Deng | Research on the problems in the construction of Smart community in china and Its countermeasures | |
Liu et al. | Application Research of Intelligent Site Management System | |
CN202795513U (en) | Visitor registration safety management system | |
CN205913038U (en) | Portable audit is calculated and is used tool holder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170322 |