CN203097286U - Floor slab reserved opening template device with flange - Google Patents
Floor slab reserved opening template device with flange Download PDFInfo
- Publication number
- CN203097286U CN203097286U CN 201320088308 CN201320088308U CN203097286U CN 203097286 U CN203097286 U CN 203097286U CN 201320088308 CN201320088308 CN 201320088308 CN 201320088308 U CN201320088308 U CN 201320088308U CN 203097286 U CN203097286 U CN 203097286U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- floor
- reserved opening
- reserved
- wing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility mode discloses a floor slab reserved opening template device with a flange. The floor slab reserved opening template device with the flange comprises a reserved sleeve pipe arranged in a reserved opening, wherein a flange plate capable of fully covering the reserved sleeve pipe is arranged at the top of the reserved sleeve pipe, the flange plate is connected with the reserved sleeve pipe in a detachable mode, and a positioning device matched with a floor slab at the position of the reserved opening in a clamping-connection mode is arranged at the bottom of the reserved sleeve pipe. The floor slab reserved opening template device with the flange can accurately control the thickness of the floor slab around the reserved opening, guarantees the forming quality of the reserved opening, reduces the processing work of pressing and correcting the floor slab to be flat in later period, brings convenience to construction, is obvious in economic effect and quality effect, and has good popularization and application value.
Description
Technical field
The utility model belongs to the form work engineering field, and a kind of floor with the edge of a wing that relates in particular in the building construction process is reserved opening mould plate device.
Background technology
In recent years, the measure that the control building floor is reserved the hole gets more and more, wherein sleeve pipe directly is placed on the position of reserving the hole and is one by the technical measures of widespread usage, this technical measures easy construction, but there is more problem, easily cause hole skew, hole Forming Quality poor, and reserve place, hole slab thickness and should not control, increased reserve hole periphery floor smear pressures, levelling is dealt with the work.
Summary of the invention
Deficiency at the prior art existence, technical problem to be solved in the utility model is, a kind of its turnover access times height is provided, is connected firmly, constructs simple and easy, quick with the bottom template, can accurately control and reserve hole periphery slab thickness, it is good to guarantee to reserve the hole Forming Quality, reduces the floor on the band edge of a wing of floor post-processed work and reserves opening mould plate device.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of floor with the edge of a wing is reserved opening mould plate device, comprise and be arranged at the reservation sleeve pipe of reserving in the hole, one frange plate that can cover described reservation sleeve pipe fully is set at the top of reserving sleeve pipe, described frange plate with reserve that sleeve pipe is detachable to be connected, it is characterized in that: described reservation sleeve bottom be provided with one with reserve the hole and locate the positioner that the floor clamping cooperates.
The floor on the above-mentioned band edge of a wing is reserved opening mould plate device, described positioner is made up of stator, clamping locating template and hold-down screw, described stator is welded in to be reserved on the internal surface of sleeve pipe, the clamping locating template is located at soffit, described clamping locating template and the lower surface clamping of reservation sleeve pipe of stator by hold-down screw.
The floor on the above-mentioned band edge of a wing is reserved opening mould plate device, and the soffit of described stator is concordant with the lower surface of reserving sleeve pipe.
The floor on the above-mentioned band edge of a wing is reserved opening mould plate device, and described reservation inside pipe casing is provided with the leader.
The floor on the band edge of a wing of stating is reserved opening mould plate device, on the described frange plate bolt is set, and described bolt bottom is threaded with handle, and the bolt top is fastenedly connected frange plate and reservation sleeve pipe by nut.
The floor on the above-mentioned band edge of a wing is reserved opening mould plate device, and the height of described reservation sleeve pipe is identical with the thickness of reserving place, hole floor.
The floor on the above-mentioned band edge of a wing is reserved opening mould plate device, and the size of described clamping locating template is greater than the external diameter of reserving sleeve pipe.
The advantage that the floor on the utility model band edge of a wing is reserved opening mould plate device is: the floor that is adopted is reserved opening mould plate device, can accurately control and reserve hole periphery slab thickness, guarantee to reserve the hole Forming Quality, that reduces the later stage floor smears works of treatment such as pressure, levelling, and easy construction, economic effect and mass effect are obvious, have application value preferably.
Description of drawings
Fig. 1 is the plan structure schematic diagram that removes behind the frange plate;
Fig. 2 is a vertical view of the present utility model;
Fig. 3 is the structure sectional view of A-A among Fig. 1.
The specific embodiment
Below in conjunction with drawings and the specific embodiments the utility model is described in further details;
As shown in Figure 1, 2, 3, a kind of floor with the edge of a wing is reserved opening mould plate device, comprises being arranged at the reservation sleeve pipe of reserving in the hole 1, and the height of reserving sleeve pipe 1 is identical with the thickness of reserving place, hole floor.In reservation sleeve pipe 1 inside leader 2 is set, this handle 2 can adopt pipe also can adopt square tube, and the two ends of handle 2 are welded on the inwall of reserving sleeve pipe 1.Be provided with one at the top of reserving sleeve pipe 1 and can cover the frange plate 3 of reserving sleeve pipe 1 fully, frange plate 3 is detachable the connection with reserving sleeve pipe 1, the dismounting mode that present embodiment adopts is: bolt 4 is set on frange plate 3, the bottom of this bolt 4 is threaded with handle 2, and the top of bolt 4 is fastenedly connected frange plate 3 and reservation sleeve pipe 1 by nut 5.Be provided with a positioner 6 that cooperates with the place's floor clamping of reservation hole in reservation sleeve pipe 1 bottom.This positioner 6 is made up of stator 61, clamping locating template 62 and hold-down screw 63, stator 61 is welded on the inwall of reserving sleeve pipe 1, clamping locating template 62 is located at the soffit of stator 61 by hold-down screw 63, clamping locating template 62 and the lower surface clamping of reserving sleeve pipe 1.The soffit of stator 61 is concordant with the lower surface of reserving sleeve pipe 1.The size of clamping locating template 62 is greater than the external diameter of reserving sleeve pipe 1.
Reserve sleeve pipe 1 and adopt steel material, the about 100mm-250mm of diameter (adjusting flexibly) according to reserving the hole diameter, reservation sleeve pipe 1 upper and lower end face concordant and with its axis normal.Reserve the lower end welding stator 61 of sleeve pipe 1, stator 61 soffits are concordant with the lower surface of reserving sleeve pipe 1, above-mentioned reservation sleeve pipe 1 firmly can be fixed on the clamping locating template 62 by hold-down screw 63, effectively prevent the skew of openings position.Reserve the upper end cover frange plate 3 of sleeve pipe 1, frange plate 3 surfacings, and frange plate 3 can all cover reserving sleeve pipe 1.By bolt 4 frange plate 3 and reservation sleeve pipe 1 are connected firmly, during concreting, concreting is promptly reserved the top edge of sleeve pipe 1 to the lower limb of frange plate 3, frange plate 3 can prevent that concrete from entering reservation sleeve pipe 1, can effectively control again and reserve place, hole slab thickness, guarantee to reserve the Forming Quality at hole.In the inside of reserving sleeve pipe 1, apart from top edge a distance, the steel pipe of the about 15mm of weld diameter, as the handle 2 of this hole to be provided mouth template, after the concrete strength of having built reaches 1.2Mpa, frange plate 3 is removed, hold above-mentioned handle 2, will reserve sleeve pipe 1 and propose quick construction.
Concrete work progress is:
1,, determines to reserve the position at hole by the location unwrapping wire.
2, utilizing hold-down screw 63 to reserve opening mould plate device with the floor of frange plate 3 is fixed on the clamping locating template 62.
3, frange plate 3 is passed bolt 4, fastening nut 5 firmly is fixed on it and reserves on the sleeve pipe 1.
4, concreting is controlled reservation hole slab thickness on every side by frange plate 3.
5, after concrete strength reaches 1.2MPa, remove frange plate 3, hold steel pipe handle 2, firmly will reserve sleeve pipe 1 and propose.
Certainly, above-mentioned explanation is not to be to restriction of the present utility model, and the utility model also is not limited to above-mentioned giving an example; those skilled in the art; in essential scope of the present utility model, the variation of making, remodeling, interpolation or replacement all should belong to protection domain of the present utility model.
Claims (7)
1. the floor with the edge of a wing is reserved opening mould plate device, comprise and be arranged at the reservation sleeve pipe of reserving in the hole, one frange plate that can cover described reservation sleeve pipe fully is set at the top of reserving sleeve pipe, described frange plate with reserve that sleeve pipe is detachable to be connected, it is characterized in that: described reservation sleeve bottom be provided with one with reserve the hole and locate the positioner that the floor clamping cooperates.
2. the floor on the band according to claim 1 edge of a wing is reserved opening mould plate device, it is characterized in that: described positioner is made up of stator, clamping locating template and hold-down screw, described stator is welded in to be reserved on the internal surface of sleeve pipe, the clamping locating template is located at soffit, described clamping locating template and the lower surface clamping of reservation sleeve pipe of stator by hold-down screw.
3. the floor on the band according to claim 2 edge of a wing is reserved opening mould plate device, it is characterized in that: the soffit of described stator is concordant with the lower surface of reserving sleeve pipe.
4. reserve opening mould plate device according to the floor on the claim 2 or the 3 described band edges of a wing, it is characterized in that: described reservation inside pipe casing is provided with the leader.
5. the floor on the band according to claim 4 edge of a wing is reserved opening mould plate device, it is characterized in that: on the described frange plate bolt is set, described bolt bottom is threaded with handle, and the bolt top is fastenedly connected frange plate and reservation sleeve pipe by nut.
6. the floor on the band according to claim 5 edge of a wing is reserved opening mould plate device, it is characterized in that: the height of described reservation sleeve pipe is identical with the thickness of reserving place, hole floor.
7. the floor on the band according to claim 5 edge of a wing is reserved opening mould plate device, it is characterized in that: the size of described clamping locating template is greater than the external diameter of reserving sleeve pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320088308 CN203097286U (en) | 2013-02-27 | 2013-02-27 | Floor slab reserved opening template device with flange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320088308 CN203097286U (en) | 2013-02-27 | 2013-02-27 | Floor slab reserved opening template device with flange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203097286U true CN203097286U (en) | 2013-07-31 |
Family
ID=48848698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320088308 Expired - Fee Related CN203097286U (en) | 2013-02-27 | 2013-02-27 | Floor slab reserved opening template device with flange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203097286U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317230A (en) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | Fixing method of beam and wall pre-embedded horizontal sleeve |
CN105735643A (en) * | 2016-04-08 | 2016-07-06 | 中建八局第一建设有限公司 | Sleeve device for reserved hole of pipeline |
CN105952152A (en) * | 2016-06-27 | 2016-09-21 | 青岛建集团有限公司 | Formwork device for reserved pipeline orifices of floor slabs |
CN106884533A (en) * | 2017-04-24 | 2017-06-23 | 青岛建集团有限公司 | Adjustable window hole molding board support meanss |
GB2567892A (en) * | 2017-10-31 | 2019-05-01 | Abbey Pynford Holdings Ltd | A retaining barrier |
-
2013
- 2013-02-27 CN CN 201320088308 patent/CN203097286U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317230A (en) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | Fixing method of beam and wall pre-embedded horizontal sleeve |
CN105735643A (en) * | 2016-04-08 | 2016-07-06 | 中建八局第一建设有限公司 | Sleeve device for reserved hole of pipeline |
CN105952152A (en) * | 2016-06-27 | 2016-09-21 | 青岛建集团有限公司 | Formwork device for reserved pipeline orifices of floor slabs |
CN105952152B (en) * | 2016-06-27 | 2019-02-12 | 青岛一建集团有限公司 | A kind of plate device for floor provided pipe road junction |
CN106884533A (en) * | 2017-04-24 | 2017-06-23 | 青岛建集团有限公司 | Adjustable window hole molding board support meanss |
GB2567892A (en) * | 2017-10-31 | 2019-05-01 | Abbey Pynford Holdings Ltd | A retaining barrier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203097286U (en) | Floor slab reserved opening template device with flange | |
CN102041810B (en) | Construction method for pouring dam foundation concrete in zone with centralized water gushing | |
CN204001662U (en) | A kind of fastening devices external member of Cantilever Beams | |
CN202644990U (en) | Fixing device for reserved pipeline or hole template | |
CN202925896U (en) | A hole reservation device for constructional engineering | |
CN203808501U (en) | Early-removing jacking support based on existing fastener-type scaffold | |
CN202467192U (en) | Positioning device for reserved hole of concrete floor | |
CN201362959Y (en) | Floor slab preformed hole device | |
CN103696564A (en) | Novel construction joint formwork | |
CN210421925U (en) | Positioning and embedding device for water stop joint of building | |
CN202969967U (en) | Temporary protecting device for once formed floor reserved hole | |
CN204844469U (en) | Precast shear wall installation is with pre -buried steel tube hole positioner | |
CN204982672U (en) | Bridge bent cap die block anti -leakage device | |
CN202202561U (en) | Floor preformed hole construction sleeve | |
CN204386153U (en) | The adjustable rest of clear-water concrete ater-casting formwork | |
CN108019038A (en) | It is a kind of while mould fixing device and while touch fixed construction method | |
CN107965145B (en) | Horizontal convex concrete construction joint hanging die supporting device | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN209620634U (en) | A kind of fixed device of embedded iron parts | |
CN208604932U (en) | Pour mold plate installation Smoothing structure | |
CN208294080U (en) | Formwork root leakproof sizing device | |
CN204662977U (en) | A kind of position corrector of creeping formwork typified form | |
CN202055549U (en) | Positioning device for water-stopping copper sheet | |
CN206279550U (en) | A kind of chamfer tool for being applied to project of transmitting and converting electricity basic stand column | |
CN203924713U (en) | The reservation device of hole on a kind of concrete floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130731 Termination date: 20160227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |