CN203096732U - 三类预应力管桩处理施工装置 - Google Patents
三类预应力管桩处理施工装置 Download PDFInfo
- Publication number
- CN203096732U CN203096732U CN 201320066149 CN201320066149U CN203096732U CN 203096732 U CN203096732 U CN 203096732U CN 201320066149 CN201320066149 CN 201320066149 CN 201320066149 U CN201320066149 U CN 201320066149U CN 203096732 U CN203096732 U CN 203096732U
- Authority
- CN
- China
- Prior art keywords
- prestressed pipe
- steel bar
- pile
- class
- pipe pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种三类预应力管桩处理施工装置,包括预应力管桩,所述预应力管桩内设置有圆柱形空腔,所述空腔内安装有管桩处理施工骨架,所述管桩处理施工骨架包括纵向受力钢筋、箍筋和固定钢筋环,所述固定钢筋环圆心在同一直线上,轴心的平面相互平行且等距离排列,所述纵向受力钢筋的轴心线与固定钢筋环的轴心线相互垂直,所述纵向受力钢筋沿着固定钢筋环外侧均匀分布,并与固定钢筋环焊接固定,所述箍筋成螺旋状围绕固定在纵向受力钢筋的外侧。本实用新型实用的优点是:结构简单,安全可靠;施工方便,施工周期短,工程费用低,材料损耗小,可有效降低施工成本。
Description
技术领域
本实用新型涉及一种安全施工处理装置,尤其是涉及一种三类预应力管桩处理施工装置。
背景技术
预应力管桩完整性是在基坑开挖后进行检测的,一旦遇到三类桩桩身有明显桩身断裂,裂缝,夹泥,空洞,蜂窝,松散等缺陷的情况,就会对桩身结构承载力有不利影响,这种情况下常采用补桩处理,补桩处理包含基坑回填、桩机进退场、补压桩、二次开挖等工作。这种处理方式处理周期长,工作量大,费用高,大大增加了工程中人力物力的投入,影响施工进度,存在安全隐患。
实用新型内容
本实用新型的目的是针对现有产品的不足,而提供一种结构简单,安全可靠,施工方便,施工周期短,工程费用低,材料损耗小,可有效降低施工成本的三类预应力管桩处理施工装置。
本实用新型的三类预应力管桩处理施工装置,包括预应力管桩,所述预应力管桩内设置有圆柱形空腔,所述空腔内安装有管桩处理施工骨架,所述管桩处理施工骨架包括纵向受力钢筋、箍筋和固定钢筋环,所述固定钢筋环圆心在同一直线上,轴心的平面相互平行且等距离排列,所述纵向受力钢筋的轴心线与固定钢筋环的轴心线相互垂直,所述纵向受力钢筋沿着固定钢筋环外侧均匀分布,并与固定钢筋环焊接固定,所述箍筋成螺旋状围绕固定在纵向受力钢筋的外侧。
所述纵向受力钢筋和固定钢筋环由钢筋制成。所述固定钢筋环的外直径比预应力管桩的圆柱形空腔的直径小5~10cm。所述纵向受力钢筋的数量为4~10根。所述箍筋5为直径4~10cm的钢筋。
本实用新型的有益效果是:(1)结构简单,安全可靠;(2)施工方便,施工周期短,工程费用低,材料损耗小,可有效降低施工成本。
附图说明
图1是本实用新型的三类预应力管桩处理施工装置的主视图;
图2是本实用新型的三类预应力管桩处理施工装置的俯视图;
图中:预应力管桩1、桩尖2、裂纹3、纵向受力钢筋4、箍筋5、混凝土6、固定钢筋环7。
具体实施方式
下面结合附图对本实用新型做进一步描述。
在图中,本实用新型的三类预应力管桩处理施工装置主要由预应力管桩1、桩尖2、裂纹3、纵向受力钢筋4、箍筋5、混凝土6和固定钢筋环7组成。
所述预应力管桩1内设置有圆柱形空腔,所述空腔内安装有管桩处理施工骨架,所述管桩处理施工骨架包括纵向受力钢筋4、箍筋5和固定钢筋环7,所述固定钢筋环7圆心在同一直线上,轴心的平面相互平行且等距离排列,所述纵向受力钢筋4的轴心线与固定钢筋环7的轴心线相互垂直,所述纵向受力钢筋4沿着固定钢筋环7外侧均匀分布,并与固定钢筋环7焊接固定,所述箍筋5成螺旋状围绕固定在纵向受力钢筋4的外侧。
所述纵向受力钢筋4和固定钢筋环7由钢筋制成。所述固定钢筋环7的外直径比预应力管桩1的圆柱形空腔的直径小6cm。所述纵向受力钢筋4的数量为6根。所述箍筋5为直径6cm的钢筋。
使用本实用新型的三类预应力管桩处理施工装置时,把钢丝绳从该管桩处理施工骨架顶部一个固定钢筋环7下穿过,用塔吊通过钢丝绳把管桩处理施工骨架起吊立起,移动到预应力管桩1圆柱形空腔的上方慢慢下降,将管桩处理施工骨架放到预应力管桩1的桩尖2上表面,完成钢筋笼安装。然后将混泥土6直接灌入空腔内,灌到该预应力管桩1的顶部,待混泥土6凝固,即可有效防止预应力管桩1的裂纹3继续扩大,使预应力管桩1的支撑强度大大提升,可避免重复施工,降低施工费用。
Claims (5)
1.一种三类预应力管桩处理施工装置,包括预应力管桩(1)、桩尖(2)、混凝土(6),其特征是,所述预应力管桩(1)内设置有圆柱形空腔,所述空腔内安装有管桩处理施工骨架,所述管桩处理施工骨架包括纵向受力钢筋(4)、箍筋(5)和固定钢筋环(7),所述固定钢筋环(7)圆心在同一直线上,轴心的平面相互平行且等距离排列,所述纵向受力钢筋(4)的轴心线与固定钢筋环(7)的轴心线相互垂直,所述纵向受力钢筋(4)沿着固定钢筋环(7)外侧均匀分布,并与固定钢筋环(7)焊接固定,所述箍筋(5)成螺旋状围绕固定在纵向受力钢筋(4)的外侧。
2.根据权利要求1所述的三类预应力管桩处理施工装置,其特征是,所述纵向受力钢筋(4)和固定钢筋环(7)由钢筋制成。
3.根据权利要求1所述的三类预应力管桩处理施工装置,其特征是,所述固定钢筋环(7)的外直径比预应力管桩(1)的圆柱形空腔的直径小5~10cm。
4.根据权利要求1所述的三类预应力管桩处理施工装置,其特征是,所述纵向受力钢筋(4)的数量为4~10根。
5.根据权利要求1所述的三类预应力管桩处理施工装置,其特征是,所述箍筋(5)为直径4~10cm的钢筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320066149 CN203096732U (zh) | 2013-02-05 | 2013-02-05 | 三类预应力管桩处理施工装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320066149 CN203096732U (zh) | 2013-02-05 | 2013-02-05 | 三类预应力管桩处理施工装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203096732U true CN203096732U (zh) | 2013-07-31 |
Family
ID=48848149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320066149 Expired - Lifetime CN203096732U (zh) | 2013-02-05 | 2013-02-05 | 三类预应力管桩处理施工装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203096732U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410182A (zh) * | 2013-08-22 | 2013-11-27 | 天津大学 | 桩基单侧卸荷水平顶拉纠偏及断桩补强加固施工方法 |
-
2013
- 2013-02-05 CN CN 201320066149 patent/CN203096732U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410182A (zh) * | 2013-08-22 | 2013-11-27 | 天津大学 | 桩基单侧卸荷水平顶拉纠偏及断桩补强加固施工方法 |
CN103410182B (zh) * | 2013-08-22 | 2015-07-22 | 天津大学 | 桩基单侧卸荷水平顶拉纠偏及断桩补强加固施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243961B (zh) | 火力发电厂烟囱钛板钢内筒倒装施工装置 | |
CN203779015U (zh) | 一种钢筋笼成型机 | |
CN102398305B (zh) | 一种预制混凝土桩的生产方法 | |
CN203343650U (zh) | 大直径钢筋笼的连接用定位钢板 | |
CN203096732U (zh) | 三类预应力管桩处理施工装置 | |
CN203625894U (zh) | 一种桩孔内钢筋笼安装辅助装置 | |
CN202954490U (zh) | 一种钢筋笼吊装滚动式垫块 | |
CN203924039U (zh) | 一种灌注桩钢筋笼保护层控制结构 | |
CN105672574A (zh) | 年轮式配筋高强混凝土圆柱 | |
CN202595638U (zh) | 桥梁桩柱结合部位快速加固结构体系 | |
CN207642213U (zh) | 一种灌注桩钢筋笼螺旋箍筋定位辅助装置 | |
CN201567572U (zh) | 钢筋笼+钢护筒组合护筒结构 | |
CN205314372U (zh) | 一种钢筋笼保护层垫块 | |
CN204039923U (zh) | 深水桥梁基础施工中用于钢围堰底节拼装的升降装置 | |
CN204225098U (zh) | 超重钢筋笼 | |
CN202989910U (zh) | 一种防止钢筋笼上浮的抗浮装置 | |
CN205990200U (zh) | 360°变幅独立提升装置 | |
CN204590008U (zh) | 一种拼装式空心桩 | |
CN205955016U (zh) | 主筋与箍筋的连接结构 | |
CN203613545U (zh) | 一种用于深基坑支护的角钢格构柱 | |
CN203452065U (zh) | 非预应力高强离心混凝土管桩 | |
CN203049569U (zh) | 一种大直径灌注桩钢筋笼的加固结构 | |
CN202595733U (zh) | 竖向预应力锚索抗滑桩 | |
CN204456164U (zh) | 一种通信塔的拼接式基座 | |
CN204282920U (zh) | 一种配有拼接式基座的通信塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130731 |
|
CX01 | Expiry of patent term |