CN203096695U - 一种梁式渡槽钢筋绑扎模具 - Google Patents
一种梁式渡槽钢筋绑扎模具 Download PDFInfo
- Publication number
- CN203096695U CN203096695U CN 201320062575 CN201320062575U CN203096695U CN 203096695 U CN203096695 U CN 203096695U CN 201320062575 CN201320062575 CN 201320062575 CN 201320062575 U CN201320062575 U CN 201320062575U CN 203096695 U CN203096695 U CN 203096695U
- Authority
- CN
- China
- Prior art keywords
- steel skeleton
- channel
- section steel
- reinforcing bar
- type aqueduct
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及一种梁式渡槽钢筋绑扎模具,包括槽钢骨架,还包括设于所述槽钢骨架上的角铁卡槽以及设于槽钢骨架外侧的支撑架;槽钢骨架的横断面形状为U形,且所述支撑架的内侧与槽钢骨架的外侧紧贴并固定连接,支撑架与槽钢骨架组合形成“凹”字形的横断面形状;所述支撑架由多根钢管搭设组成,且多根钢管之间采用钢管专用扣件进行连接。本实用新型可以重复利用,技术效果明显;施工机具简单,采用钢管、角铁、螺栓等简单器具进行加工,人工定位安装,加工费用低廉;能够加快施工进度,保证工程质量,节省劳动力,达到施工的高效、快捷。
Description
技术领域
本实用新型涉及一种绑扎模具,特别涉及一种梁式渡槽钢筋绑扎模具。
背景技术
渡槽又称高架渠、输水桥,是一组由桥梁,隧道或沟渠构成的输水系统。通常架设于山谷、洼地、河流之上,用于通水、通行和通航。用来把远处的水引到水量不足的城镇、农村以供饮用和灌溉。
现在许多水利工程、引水工程等大量地使用着渡槽,创造出很多富有特色的新式渡槽、现代化渡槽。20世纪30年代出现了钢筋混凝土渡槽。60年代以后,随着大型灌区工程的发展,各种轻型结构渡槽、大跨度拱式渡槽被广泛采用。二十世纪中期的中国,由于水利设施落后,直接影响了农村的发展。为了摆脱这种困境,引水灌溉就成为一项突出的民生工程。
传统的渡槽钢筋绑扎工艺:在基础、墩台或墩柱上放样后逐根进行绑扎,此方法绑扎施工难度大,施工进度慢、钢板绑扎精确度底,钢筋安装质量难以保证。
实用新型内容
为解决上述技术问题,本实用新型提供一种梁式渡槽钢筋绑扎模具,能够改善渡槽钢筋绑扎质量标准,使施工进度的快速、便捷,实现输水、调水渡槽工程施工中钢筋绑扎工厂化、标准化施工。所述技术方案如下:
一种梁式渡槽钢筋绑扎模具,包括槽钢骨架,还包括设于所述槽钢骨架上的角铁卡槽以及设于槽钢骨架外侧的支撑架;槽钢骨架的横断面形状为U形,且所述支撑架的内侧与槽钢骨架的外侧紧贴并固定连接,支撑架与槽钢骨架组合形成“凹”字形的横断面形状;所述支撑架由多根钢管搭设组成,且多根钢管之间采用钢管专用扣件进行连接。
进一步,所述的角铁卡槽与槽钢骨架之间为焊接连接。
进一步,所述的槽钢骨架与支撑架之间为焊接连接。
进一步,该模具整体的长度、宽度与高度的比例是30:(9.3至9.6):(9.2至9.6)。
进一步,所述支撑架中的钢管的直径为50mm。
本实用新型的有益效果是:采用钢筋模具安装的钢筋横平竖直、间距均匀、基线流畅、结构合理,钢筋安装精度高;可以重复利用,技术效果明显;施工机具简单,采用钢管、角铁、螺栓等简单器具进行加工,人工定位安装,加工费用低廉;能够加快施工进度,保证工程质量,节省劳动力,达到施工的高效、快捷。
附图说明
图1是本实用新型梁式渡槽钢筋绑扎模具立体图;
图2是本实用新型梁式渡槽钢筋绑扎模具断面图;
1、槽钢骨架;2、角铁卡槽;3、支撑架。
具体实施方式
为使本实用新型的目的、技术方案和优点更加清楚,下面结合附图对本实用新型实施方式进一步详细地描述。
如图1、图2所示,本实施例提供了一种梁式渡槽钢筋绑扎模具,包括槽钢骨架1,还包括设于所述槽钢骨架1上的角铁卡槽2以及设于槽钢骨架1外侧的支撑架3;槽钢骨架1的横断面形状为U形,且所述支撑架3的内侧与槽钢骨架1的外侧紧贴并固定连接,支撑架3与槽钢骨架1组合形成“凹”字形的横断面形状;所述支撑架3由多根钢管搭设组成,且多根钢管之间采用钢管专用扣件进行连接。
进一步,所述的角铁卡槽2与槽钢骨架1之间为焊接连接。
进一步,所述的槽钢骨架1与支撑架3之间为焊接连接。
进一步,该模具整体的长度、宽度与高度的比例是30:9.4:9.4。
进一步,所述支撑架3中的钢管的直径为50mm。
本实用新型的有益效果在于,运用钢筋绑扎模具后只需对钢筋模具进行定位,然后可由钢筋模具来控制其间、排距及保护层,安装的钢筋横平竖直、间距均匀、基线流畅、结构合理。从而提高钢筋安装精度,保证质量,同时钢筋模具可以重复利用,技术效果明显,在渡槽钢筋绑扎工程中能够矫正钢筋加工中遗留的扭曲、U型钢筋加工成型后反弹,不平整等因素。
需说明的是,以上所述的实施方式是对本实用新型技术方案的说明而非限制,所属技术领域的普通技术人员的等同替换或根据现有技术而做的其它修改只要没有超出本实用新型技术方案的思路和范围,均应包含在本实用新型所要求的权利和范围之内。
Claims (5)
1.一种梁式渡槽钢筋绑扎模具,包括槽钢骨架(1),其特征在于:还包括设于所述槽钢骨架(1)上的角铁卡槽(2)以及设于槽钢骨架(1)外侧的支撑架(3);槽钢骨架(1)的横断面形状为U形,且所述支撑架(3)的内侧与槽钢骨架(1)的外侧紧贴并固定连接,支撑架(3)与槽钢骨架(1)组合形成“凹”字形的横断面形状;所述支撑架(3)由多根钢管搭设组成,且多根钢管之间采用钢管专用扣件进行连接。
2. 根据权利要求1所述的梁式渡槽钢筋绑扎模具,其特征在于:所述的角铁卡槽(2)与槽钢骨架(1)之间为焊接连接。
3. 根据权利要求1或2所述的梁式渡槽钢筋绑扎模具,其特征在于:所述的槽钢骨架(1)与支撑架(3)之间为焊接连接。
4. 根据权利要求1或2所述的梁式渡槽钢筋绑扎模具,其特征在于:该模具整体的长度、宽度与高度的比例是30:(9.3至9.6):(9.2至9.6)。
5. 根据权利要求3所述的梁式渡槽钢筋绑扎模具,其特征在于:所述支撑架(3)中的钢管的直径为50mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320062575 CN203096695U (zh) | 2013-02-04 | 2013-02-04 | 一种梁式渡槽钢筋绑扎模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320062575 CN203096695U (zh) | 2013-02-04 | 2013-02-04 | 一种梁式渡槽钢筋绑扎模具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203096695U true CN203096695U (zh) | 2013-07-31 |
Family
ID=48848112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320062575 Expired - Fee Related CN203096695U (zh) | 2013-02-04 | 2013-02-04 | 一种梁式渡槽钢筋绑扎模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203096695U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104195990A (zh) * | 2014-09-16 | 2014-12-10 | 葛洲坝集团第一工程有限公司 | 大跨度u型渡槽环向钢筋安装方法 |
CN109702694A (zh) * | 2018-12-11 | 2019-05-03 | 筑梦高科建筑有限公司 | 钢筋骨架加工的u形装置 |
-
2013
- 2013-02-04 CN CN 201320062575 patent/CN203096695U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104195990A (zh) * | 2014-09-16 | 2014-12-10 | 葛洲坝集团第一工程有限公司 | 大跨度u型渡槽环向钢筋安装方法 |
CN104195990B (zh) * | 2014-09-16 | 2016-03-30 | 葛洲坝集团第一工程有限公司 | 大跨度u型渡槽环向钢筋安装方法 |
CN109702694A (zh) * | 2018-12-11 | 2019-05-03 | 筑梦高科建筑有限公司 | 钢筋骨架加工的u形装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761092B (zh) | 大跨度深基坑可移动整体大模板侧墙施工方法 | |
CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
CN201560780U (zh) | 一种超小净距隧道中岩柱预应力对拉锚杆结构 | |
CN201933646U (zh) | 预制剪力墙的型钢连接节点 | |
CN202055263U (zh) | 钢筋混凝土廊道 | |
CN103603313A (zh) | 一种深水造流的整流墙结构及其施工方法 | |
CN105386404A (zh) | 开口u型钢箱梁与混杂纤维混凝土桥面板组合的梁桥结构 | |
CN103161139A (zh) | 一种装配整体式导流屏及其施工方法 | |
CN203096695U (zh) | 一种梁式渡槽钢筋绑扎模具 | |
CN204676608U (zh) | 一种用于地下室墙体预留后浇带的模板设置结构 | |
CN202989781U (zh) | 宽幅变宽现浇箱梁移动支架 | |
CN202865812U (zh) | 船闸引航道隔流结构 | |
CN215979399U (zh) | 一种中洞法中隔墙衬砌施工台架 | |
CN204551172U (zh) | 一种装配式钢筋混凝土空心预制路面 | |
CN202510132U (zh) | 高速铁路隧道仰拱模板 | |
CN109162293A (zh) | 一种排水管道基础施工工艺 | |
CN205223980U (zh) | 一种金属铸造坝面的活动坝 | |
CN104790353A (zh) | 一种中小型拦河闸闸墩施工方法 | |
CN205604289U (zh) | 一种能够抵抗大变形的单仓地下管廊 | |
CN202227319U (zh) | 钢管支架临时渡槽 | |
CN204491630U (zh) | 一种可重复使用的装配式竖井圈梁 | |
CN203765784U (zh) | 预制t梁肋板钢筋、预应力管道固定抽插式安装模架 | |
CN204080857U (zh) | 地铁车站y型铸钢结合钢管柱内混凝土顶升装置 | |
CN113445739A (zh) | 一种可调式单侧模板支撑装置 | |
CN202559291U (zh) | U型渡槽仿真试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130731 Termination date: 20210204 |