CN203081488U - Hard rock heading machine cutter feeding dust removing spraying system - Google Patents

Hard rock heading machine cutter feeding dust removing spraying system Download PDF

Info

Publication number
CN203081488U
CN203081488U CN 201320038103 CN201320038103U CN203081488U CN 203081488 U CN203081488 U CN 203081488U CN 201320038103 CN201320038103 CN 201320038103 CN 201320038103 U CN201320038103 U CN 201320038103U CN 203081488 U CN203081488 U CN 203081488U
Authority
CN
China
Prior art keywords
pressure
hard rock
spraying system
water
hydraulic pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320038103
Other languages
Chinese (zh)
Inventor
刘飞香
程永亮
郑大桥
秦邦江
刘佩芝
文中保
张明明
郑亚魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Heavy Industry Group Co Ltd
Original Assignee
China Railway Construction Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Heavy Industry Group Co Ltd filed Critical China Railway Construction Heavy Industry Group Co Ltd
Priority to CN 201320038103 priority Critical patent/CN203081488U/en
Application granted granted Critical
Publication of CN203081488U publication Critical patent/CN203081488U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a hard rock heading machine cutter feeding dust removing spraying system which comprises a plurality of sprayers arranged on a shield cutter, a water tube provides water for each sprayer independently, and each water tube is independently provided with a pressure sensor, a flow meter, a pressure gauge, a safety valve, a high-pressure water pump and a ball valve. According to the hard rock heading machine cutter feeding dust removing spraying system, spraying flow of each sprayer can be conveniently controlled, different working conditions are adapted, spraying effects are improved, and dust raising is reduced; and the working state of each sprayer can be conveniently detected, and plugging of each sprayer is prevented.

Description

A kind of dedusting spraying system of hard rock mole cutterhead
Technical field
The utility model belongs to the hard rock mole cutterhead, is specifically related to a kind of dedusting spraying system of hard rock mole cutterhead.
Background technology
For increasing work efficiency and construction quality, reduce personal injury, the hard rock moles (TBM) that use in the mountain tunnel construction of present long distance more.TBM comprises shield body 1, is located at the cutterhead 7 of shield body 1 front end as shown in Figure 1, and the rear end of dish 7 is connected with swivel coupling 8.In the TBM work progress main by cutterhead 7 with tunnel the place ahead catalase, the huge dust of usually can kicking up in the rock dropping process makes that environment becomes more abominable in the relatively poor tunnel of ventilation condition.Just need reduce dust emission at cutterhead front spray for dust suppression this moment.Existing TBM dedusting spraying system comprises the some shower nozzles 2 that are located on the cutterhead 7, and all shower nozzles 2 are supplied water by a water pipe 9, and water pipe 9 is provided with pressure meter 3, safety valve 4, high-pressure hydraulic pump 5 and ball valve 6.This dedusting spraying system provides high-pressure water by high-pressure hydraulic pump from the water intaking of tunnel industry water, has only a pressure meter 3 to be used for monitoring pressure, directly enters cutterhead 7 by swivel coupling 8, carries out spray for dust suppression in cutterhead 7 inside with the pipeline demultiplexing.Its shortcoming one is the discharge skewness, can cause one or several shower nozzle water yield bigger than normal, and remaining water yield is less than normal or do not have the water ejection, and dust removing effects is undesirable; The 2nd, often occur shower nozzle 2 in the construction and stop up; the uncontrollable problem of the water yield; shower nozzle 2 stops up the back is inconvenient to check; need to shut down the back workman emitting spray water to the space very narrow and small and can occur at any time caving in, the face of rock burst carries out inspection and maintenance, the working strength height, there is threat in personal safety.Therefore improve the dedusting spraying system, it is significant to improve nebulization efficiency, reduction personnel labor intensity and danger coefficient.
The utility model content
Technical problem to be solved in the utility model provides and a kind ofly can improve spray effect, reduces airborne dust, prevents the dedusting spraying system of the hard rock mole cutterhead that shower nozzle stops up.
Realize that the technical scheme that the utility model purpose adopts is: the dedusting spraying system of hard rock mole cutterhead comprises the some shower nozzles that are located on the shield body cutterhead, and each shower nozzle is supplied water by a water pipe separately.
Be equipped with pressure sensor, flow meter, pressure meter, safety valve, high-pressure hydraulic pump and ball valve on the described water pipe, wherein ball valve is connected with the water source, high-pressure hydraulic pump 5 is connected on after the ball valve, and safety valve is located on the pipeline that connects the high-pressure hydraulic pump import and export, and pressure meter is located at the exit of high-pressure hydraulic pump.
The water source is through ball valve, pressurize by high-pressure hydraulic pump, the water under high pressure delivery side of pump is installed safety valve, the safety of system when guaranteeing system overpressure, setting pressure table on the pressure piping of high-pressure hydraulic pump outlet can on-the-spot display system pressure, pressure sensor and flow meter be monitoring system pressure and flow at any time, give PLC with signal feedback, judge whether operate as normal of system, whether the phenomenon of stopping up shower nozzle is arranged.The technical scheme that its technical problem that solves the utility model adopts is: each the bar water route that is used to spray all is the single pump control of single channel, provide pressure water source by high-pressure hydraulic pump, dispose flow meter, pressure sensor on the water route in order to monitor mist flow and pressure at any time, by the feedback signal that flow meter and pressure sensor provide, PLC judges automatically whether shower nozzle stops up.
High-pressure hydraulic pump can be supplied high-pressure water, control the rotating speed of high-pressure hydraulic pump with variable frequency adjustment, according to the pressure flow characteristics auto of shower nozzle, utilized pressure sensor, flow meter is accurate measures and feedback, pressure and flow-control in optimum value, can be reached the spray effect of shower nozzle the best.Can also regulate suitable injection flow rate according to the airborne dust size at scene, alleviate the too much water yield and give the inconvenience of slagging tap and bringing, and can save the tunnel water.In work progress, in the duty that just can see each shower nozzle on the cutterhead on the control panel, check to face jeopardously without the staff, not only improved operating efficiency, and reduced threat staff's personal safety.
The utility model can be controlled the mist flow of each shower nozzle easily, adapts to different operating modes, improves spray effect, reduces airborne dust; Can easily detect the duty of each shower nozzle, prevent that shower nozzle from stopping up.
The utility model is described in further detail below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is the dedusting spraying system schematic diagram of existing hard rock mole.
Fig. 2 is a dedusting spraying system schematic diagram of the present utility model.
Among the figure: 1, shield body, 2, shower nozzle, 3, pressure meter, 4, safety valve, 5 high-pressure hydraulic pumps, 6, ball valve, 7 cutterheads, 8 swivel couplings, 9, water pipe, 10, pressure sensor, 11, flow meter.
The specific embodiment
Referring to Fig. 2, hard rock mole comprises shield body 1, is located at the cutterhead 7 of shield body 1 front end as shown in Figure 1, and the rear end of dish 7 is connected with swivel coupling 8.The dedusting spraying system of hard rock mole cutterhead comprises the some shower nozzles 2 that are located on shield body 1 cutterhead 7, and each shower nozzle 2 is supplied water by a water pipe 9 separately; Be equipped with pressure sensor 10, flow meter 11, pressure meter 3, safety valve 4, high-pressure hydraulic pump 5 and ball valve 6 on the described water pipe 9, wherein ball valve 6 is connected with the water source, high-pressure hydraulic pump 5 is connected on after the ball valve 6, safety valve 4 is located on the pipeline that connects high-pressure hydraulic pump 5 import and exports, and pressure meter 3 is located at the exit of high-pressure hydraulic pump 5.
Dedusting spraying system of the present utility model is the single pump control of single channel, and 8 shower nozzles are arranged on the cutterhead, 8 high-pressure hydraulic pumps and other control elements of use, and whether the water yield that can reach each road can be controlled separately, can also monitor shower nozzle at any time and stop up.High-pressure hydraulic pump is all fetched water from the tunnel industrial water use, spraying provides high-pressure water to shower nozzle, and POF and pressure are monitored at any time by pressure sensor and flow meter, and feed back to the PLC control system, on the hard rock mole control panel, show the flow and the parameter on each road.Suitable pressure flow match parameter scope is set all according to the pressure flow characteristics auto of shower nozzle in each road.If flow that monitors and pressure depart from the scope that sets, for example: pressure raises, and flow reduces or do not have flow, illustrates that shower nozzle is blocked.Each bar pipeline is corresponding with the shower nozzle numbering on the cutterhead, and when showing which is blocked on the control panel, the staff can learn easily, gets final product thereby find the fault shower nozzle to repair when shutting down accurately.

Claims (2)

1. the dedusting spraying system of a hard rock mole cutterhead is characterized in that comprising the some shower nozzles that are located on the shield body cutterhead, and each shower nozzle is supplied water by a water pipe separately.
2. the dedusting spraying system of hard rock mole cutterhead according to claim 1, it is characterized in that being equipped with on the described water pipe pressure sensor, flow meter, pressure meter, safety valve, high-pressure hydraulic pump and ball valve, wherein ball valve is connected with the water source, high-pressure hydraulic pump (5) is connected on after the ball valve, safety valve is located on the pipeline that connects the high-pressure hydraulic pump import and export, and pressure meter is located at the exit of high-pressure hydraulic pump.
CN 201320038103 2013-01-24 2013-01-24 Hard rock heading machine cutter feeding dust removing spraying system Expired - Lifetime CN203081488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320038103 CN203081488U (en) 2013-01-24 2013-01-24 Hard rock heading machine cutter feeding dust removing spraying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320038103 CN203081488U (en) 2013-01-24 2013-01-24 Hard rock heading machine cutter feeding dust removing spraying system

Publications (1)

Publication Number Publication Date
CN203081488U true CN203081488U (en) 2013-07-24

Family

ID=48827337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320038103 Expired - Lifetime CN203081488U (en) 2013-01-24 2013-01-24 Hard rock heading machine cutter feeding dust removing spraying system

Country Status (1)

Country Link
CN (1) CN203081488U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631230A (en) * 2013-11-12 2015-05-20 昆明中铁大型养路机械集团有限公司 Large road maintenance mechanical operation dust removal device and spray rate control method of device
CN105507934A (en) * 2016-01-13 2016-04-20 山东科技大学 Dust removal system of full-face tunnel boring machine
CN106121668A (en) * 2016-06-28 2016-11-16 上海市基础工程集团有限公司 Development machine cutter head center revolution priming apparatus
CN106285713A (en) * 2016-08-31 2017-01-04 中国铁建重工集团有限公司 Cutter head for rock tunnel development machine
CN107420110A (en) * 2017-08-30 2017-12-01 中铁工程装备集团有限公司 A kind of cutter head of shield machine washes away spout anti-block apparatus and control method
CN108708761A (en) * 2018-05-21 2018-10-26 西南交通大学 Dust pelletizing system and dust removal method
CN110561528A (en) * 2019-10-10 2019-12-13 重庆长征重工有限责任公司 Cutter disc and cutting equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631230A (en) * 2013-11-12 2015-05-20 昆明中铁大型养路机械集团有限公司 Large road maintenance mechanical operation dust removal device and spray rate control method of device
CN105507934A (en) * 2016-01-13 2016-04-20 山东科技大学 Dust removal system of full-face tunnel boring machine
CN106121668A (en) * 2016-06-28 2016-11-16 上海市基础工程集团有限公司 Development machine cutter head center revolution priming apparatus
CN106285713A (en) * 2016-08-31 2017-01-04 中国铁建重工集团有限公司 Cutter head for rock tunnel development machine
CN106285713B (en) * 2016-08-31 2019-02-19 中国铁建重工集团有限公司 Cutter head for rock tunnel development machine
CN107420110A (en) * 2017-08-30 2017-12-01 中铁工程装备集团有限公司 A kind of cutter head of shield machine washes away spout anti-block apparatus and control method
CN107420110B (en) * 2017-08-30 2023-04-18 中铁工程装备集团有限公司 Shield tunneling machine cutter head scouring nozzle anti-blocking device and control method
CN108708761A (en) * 2018-05-21 2018-10-26 西南交通大学 Dust pelletizing system and dust removal method
CN110561528A (en) * 2019-10-10 2019-12-13 重庆长征重工有限责任公司 Cutter disc and cutting equipment

Similar Documents

Publication Publication Date Title
CN203081488U (en) Hard rock heading machine cutter feeding dust removing spraying system
CN201763370U (en) An automatic spraying dust suppression control system of coal mining machine and control device thereof
CN109622267A (en) A kind of mobile concrete jet robot ejecta automatic adjusting control device and method
CN105134210A (en) External high-pressure automatic spraying dust removing device and method for coal mining machine
CN104381095A (en) Grassland automatic irrigation system
CN203835390U (en) Foam-spray dust removal system in heading machine
CN205677656U (en) Comprehesive coal mining frame spraying device
WO2013156792A3 (en) Apparatus and method for entraining a powder in a fluid
CN204191291U (en) The buried rainer of a kind of automatic telescopic
US20160082451A1 (en) Double-nozzle injector capable of spraying evenly at medium and low pressure
CN103089262B (en) Self-adsorption air type foam dust suspension system for coal mining working face
CN202970762U (en) Coal mine tunnel spray and aspirating device
CN209942869U (en) A annular atomizing water curtain dust fall ware for tunnel engineering construction
CN206956641U (en) A kind of engineering machinery hydraulic pressure Dust Improvement device
CN208976052U (en) A kind of crusher depositing dust processing unit
CN201862496U (en) Atomizer spray nozzle with automatic pressure regulating effect
CN207822349U (en) A kind of high-pressure water mist automatic fire extinguishing system
CN205013034U (en) Geomantic omen keeps apart atomizer
CN208347821U (en) A kind of no nozzle anti-blocking plug cavity type is mining wind power ganged spraying
CN210160981U (en) Nozzle combination device for rapidly grooving coal rock wall by using abrasive water jet
CN210529605U (en) Dust device for construction
CN105155864A (en) Visual guide rod repairing device for high-rise stone-like paint outer wall
CN203050758U (en) Roadway dirt retention rapid cleaning sprayer
CN103529882A (en) Controller and control method of automatic filter perfuming machine
CN202768426U (en) High pressure water pump and fire fighting apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 410100 No. 88 East 7 Line, Changsha Economic and Technological Development Zone, Changsha City, Hunan Province

Patentee after: China Railway Construction Heavy Industry Group Co.,Ltd.

Address before: 410100 Changsha economic and Technological Development Zone, Hunan, No. 88 East Road, No. seven

Patentee before: China Railway Construction Heavy Industry Co.,Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20130724

CX01 Expiry of patent term