CN203080892U - Boiler water wall installment construction scaffold - Google Patents

Boiler water wall installment construction scaffold Download PDF

Info

Publication number
CN203080892U
CN203080892U CN 201320012422 CN201320012422U CN203080892U CN 203080892 U CN203080892 U CN 203080892U CN 201320012422 CN201320012422 CN 201320012422 CN 201320012422 U CN201320012422 U CN 201320012422U CN 203080892 U CN203080892 U CN 203080892U
Authority
CN
China
Prior art keywords
water wall
right angle
angle trigonometry
type support
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320012422
Other languages
Chinese (zh)
Inventor
唐家波
高黎明
黎军保
潘财生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electrical Construction Group Henan Engineering Co Ltd
Original Assignee
Henan No2 Thermal Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan No2 Thermal Power Construction Co ltd filed Critical Henan No2 Thermal Power Construction Co ltd
Priority to CN 201320012422 priority Critical patent/CN203080892U/en
Application granted granted Critical
Publication of CN203080892U publication Critical patent/CN203080892U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a boiler water wall installment construction scaffold. The boiler water wall installment construction scaffold comprises a right triangle support installed on the inner side of a water wall and a tension device installed on the outer side of the water wall. A steel plate used for penetrating through a water wall fin is arranged at the rear end of a right triangle support transverse supporting plate. The rear end portion of the steel plate is provided with a suspension hole. The right triangle support and the tension device are connected and fixed through the suspension hole. Because the right triangle support is installed on the inner side of the water wall, and the tension device is arranged outside the water wall, temporary welding on boiler equipment is avoided, the boiler equipment is protected, and the scaffold is convenient to arrange, can be repeatedly used, and greatly reduces material consumption.

Description

Boiler water wall installation scaffold
Technical field
The utility model relates to a kind of construction tool, is specifically related to a kind of boiler water wall installation scaffold.
Background technology
The boiler water wall installation is the important component part in the thermoelectricity construction, because the platform that can not rely on around when water-cooling wall is installed, and belong to work high above the ground, therefore, how to set up the needed scaffold of water-cooling wall installation, guarantee an important topic that just becomes the water-cooling wall installation smoothly, safely of every installation work.In the past water-cooling wall is installed the interim welding manner of taking that scaffold has, though this mode has improved safety of construction, water-cooling wall equipment has been caused the secondary injury, be unfavorable for the safe operation of equipment, and the workload of setting up, removing is big; Though the method for having taked unjointed insertion water-cooling wall fin to set up that also has lacks the whole consideration that utilizes of scaffold, often with taking with usefulness, can't second use after the dismounting, caused a large amount of wastes of material.
Summary of the invention
The utility model provides a kind of boiler water wall installation scaffold at the problems referred to above, and itself and boiler unit need not welding, and can reuse, and saves resource.
For achieving the above object, the technical scheme taked of the utility model is:
A kind of boiler water wall installation scaffold, comprise right angle trigonometry type support that is installed in the water-cooling wall inboard and the take-up device that is installed in the water-cooling wall outside, right angle trigonometry type support horizontal support plate rear end is provided with the steel plate that is used to pass the water-cooling wall fin, this steel plate rearward end is provided with hanging hole, and described right angle trigonometry type support is connected and fixed by hanging hole and take-up device.
Described take-up device comprises the pull bar that has hook, and pull bar is provided with screw thread, and the pull bar leading section outside is with steel pipe, and steel pipe is fixed by the nut that is arranged on the fixed head on the pull bar and is positioned at the fixed head rear side.
Be provided with the backing plate I between described right angle trigonometry type support horizontal support plate rear end and the steel plate, right angle trigonometry type support horizontal support plate front end top is provided with the railing intubate, and the perpendicular gripper shoe bottom of right angle trigonometry type support rear side is provided with the backing plate II.
Described steel plate thickness is 6-10mm.
The utility model has right angle trigonometry type support in the water-cooling wall installed inside; the water-cooling wall arranged outside has take-up device; avoided the interim welding on boiler unit; protected boiler unit; and this kind scaffold building is convenient; professional skill to the constructor is less demanding; after the process simple training; can both finish this work; the utility model device can reuse, and greatly reduces material consumption, and this scaffold building, dismounting speed are fast; reduce labour hour, greatly reduce labor cost.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is Fig. 1 vertical view;
Fig. 3 is the utility model right-angled triangle supporting structure schematic diagram;
Fig. 4 is the utility model take-up device.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As Fig. 1-shown in Figure 4, a kind of boiler water wall installation scaffold, comprise right angle trigonometry type support 1 that is installed in water-cooling wall 14 inboards and the take-up device that is installed in water-cooling wall 14 outsides, right angle trigonometry type support horizontal support plate 2 rear ends are provided with the steel plate 3 that is used to pass water-cooling wall fin 15, steel plate 3 thickness are 6-10mm, can be 6mm, 8mm, 8.5mm or 10mm etc., be arbitrary value between the 6-10mm, preferred steel plate 3 thickness are 8mm, steel plate 3 rearward end are provided with hanging hole 4, take-up device comprises the pull bar 5 that has hook 6, in hook 6 hanging holes 4 that hang on the steel plate 3, pull bar 5 is provided with screw thread, the pull bar 5 leading sections outsides is with steel pipe 7, and steel pipe 7 is fixing by being arranged on the fixed head 8 on the pull bar 5 and being positioned at the nut 9 of fixed head 8 rear sides, and fixed head 8 central authorities are provided with through hole, the length of fixed head 8 is greater than the diameter of steel pipe 7, and the diameter of nut 9 is greater than the diameter of the through hole on the fixed head 8.Be provided with backing plate I 10 between right angle trigonometry type support horizontal support plate 2 rear ends and the steel plate 3, right angle trigonometry type support horizontal support plate 2 front ends top is provided with railing intubate 11, can conveniently scaffold tube commonly used be inserted, to set up the scaffold fence, the perpendicular gripper shoe 12 bottom rear sides of right angle trigonometry type support are provided with backing plate II 13, so that scaffold can be supported on the water-cooling wall 14 of all size reliably.
When the utility model specifically uses, the steel plate 3 of right angle trigonometry type support horizontal support plate 2 rear ends is passed water-cooling wall fin 15 be inserted into water-cooling wall 14 outsides, hook 6 with pull bar 5 front ends of take-up device hangs on the hanging hole 4 of steel plate 3 again, put steel pipe 7 in the pull bar outside then, install fixed head 8 and nut 9 at pull bar successively again, screw nut 9 then and just right angle trigonometry type support be pressed on the water-cooling wall 14, right angle trigonometry type support with the Load Transfer of scaffold to water-cooling wall 14.When the utility model is specifically worked, with two the utility model as one group, on the transverse slat of two right angle trigonometry type supports, set up the steel springboard, the spacing of this scaffold can rationally be set according to the length of steel springboard, bigger construction space can be provided, and the utility model is laid down nut 9 after using and finishing, pull down take-up device, and then remove the right-angled triangle support.The utility model has thoroughly been avoided the interim welding on boiler unit, has protected boiler unit, and this kind scaffold building is convenient, and is less demanding to constructor's professional skill, through after the simple training, can both finish this work.The utility model is produced once, the permanent use, avoided each engineering repeat make, greatly reduce material consumption, and this scaffold building, dismounting speed are fast, reduce labour hour, greatly reduce labor cost.

Claims (4)

1. boiler water wall installation scaffold, it is characterized in that: comprise right angle trigonometry type support that is installed in the water-cooling wall inboard and the take-up device that is installed in the water-cooling wall outside, right angle trigonometry type support horizontal support plate rear end is provided with the steel plate that is used to pass the water-cooling wall fin, this steel plate rearward end is provided with hanging hole, and described right angle trigonometry type support is connected and fixed by hanging hole and take-up device.
2. boiler water wall installation scaffold according to claim 1, it is characterized in that: described take-up device comprises the pull bar that has hook, pull bar is provided with screw thread, the pull bar leading section outside is with steel pipe, and steel pipe is fixed by the nut that is arranged on the fixed head on the pull bar and is positioned at the fixed head rear side.
3. boiler water wall installation scaffold according to claim 1 and 2, it is characterized in that: be provided with the backing plate I between described right angle trigonometry type support horizontal support plate rear end and the steel plate, right angle trigonometry type support horizontal support plate front end top is provided with the railing intubate, and the perpendicular gripper shoe bottom of right angle trigonometry type support rear side is provided with the backing plate II.
4. according to boiler water wall installation scaffold according to claim 3, it is characterized in that: described steel plate thickness is 6-10mm.
CN 201320012422 2013-01-10 2013-01-10 Boiler water wall installment construction scaffold Expired - Fee Related CN203080892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320012422 CN203080892U (en) 2013-01-10 2013-01-10 Boiler water wall installment construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320012422 CN203080892U (en) 2013-01-10 2013-01-10 Boiler water wall installment construction scaffold

Publications (1)

Publication Number Publication Date
CN203080892U true CN203080892U (en) 2013-07-24

Family

ID=48826743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320012422 Expired - Fee Related CN203080892U (en) 2013-01-10 2013-01-10 Boiler water wall installment construction scaffold

Country Status (1)

Country Link
CN (1) CN203080892U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106090874A (en) * 2016-08-10 2016-11-09 山东丰汇设备技术有限公司 A kind of boiler water wall hanging rack special
CN106639333A (en) * 2017-02-24 2017-05-10 中国电建集团河南工程公司 Installation method of rigid scaffold during spiral water wall installation process
CN107217830A (en) * 2017-07-04 2017-09-29 中国能源建设集团天津电力建设有限公司 The outstanding ladder scaffolding and its erection method installed for water-cooling wall spiral section
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106090874A (en) * 2016-08-10 2016-11-09 山东丰汇设备技术有限公司 A kind of boiler water wall hanging rack special
CN106639333A (en) * 2017-02-24 2017-05-10 中国电建集团河南工程公司 Installation method of rigid scaffold during spiral water wall installation process
CN107217830A (en) * 2017-07-04 2017-09-29 中国能源建设集团天津电力建设有限公司 The outstanding ladder scaffolding and its erection method installed for water-cooling wall spiral section
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method
CN107720580B (en) * 2017-10-19 2023-09-01 中国电建集团福建工程有限公司 Quick construction hoisting device and method for boiler construction water-cooled wall

Similar Documents

Publication Publication Date Title
CN203080892U (en) Boiler water wall installment construction scaffold
CN206487126U (en) A kind of scaffold for the architectural engineering being easily installed
CN110439249B (en) Overhanging bearing frame and mounting method thereof
CN202658872U (en) Tool connecting tube of building scaffold
CN104141392A (en) Tool type edge protecting device for balconies and floor slabs and installing method of tool type edge protecting device
CN206917309U (en) Provisional elevator door opening mouth protecting device
CN103306473A (en) Tool type anchoring part for overhanging scaffold
CN203769083U (en) Steel tube fixer
CN203603444U (en) Steel pipe scaffold wall connecting piece
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN103074997A (en) Steel tube scaffold wall connecting piece
CN203361671U (en) Building near edge protective device
CN204001673U (en) Expanded metal lath fastening devices
CN203080897U (en) Steel pipe scaffold connecting tube
CN203547123U (en) Supporting device for deformation joint template
CN202622700U (en) Hanger rod installation tool
CN103556813B (en) Steel pipe scaffold wall-connecting piece
CN203356960U (en) Loom motor belt pulley detaching tool
CN105484510A (en) Tool type elevator shaft protection device
CN204983616U (en) Scaffold is wall pole even
CN203834959U (en) Safety protective fence used for building construction
CN214062329U (en) Quick-release wall penetrating rod for climbing formwork
CN203452369U (en) Tool type safeguard
CN204174906U (en) A kind of builder's jack anchor ring
CN216076430U (en) Face limit entrance to a cave protector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee after: China Electric Power Construction Group Henan engineering company

Address before: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee before: Henan No.2 Thermal Power Construction Co.,Ltd.

CP03 Change of name, title or address

Address after: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee after: China Electrical Construction Group Henan Engineering Co., Ltd.

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee before: China Electric Power Construction Group Henan engineering company

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130724

Termination date: 20190110

CF01 Termination of patent right due to non-payment of annual fee