CN203067008U - Railway tunnel fire prevention ventilation system - Google Patents

Railway tunnel fire prevention ventilation system Download PDF

Info

Publication number
CN203067008U
CN203067008U CN 201220706134 CN201220706134U CN203067008U CN 203067008 U CN203067008 U CN 203067008U CN 201220706134 CN201220706134 CN 201220706134 CN 201220706134 U CN201220706134 U CN 201220706134U CN 203067008 U CN203067008 U CN 203067008U
Authority
CN
China
Prior art keywords
railway tunnel
control cabinet
axial flow
fire prevention
ventilation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220706134
Other languages
Chinese (zh)
Inventor
陈增海
王志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG JINDUN FANS HOLDING CO Ltd
Original Assignee
ZHEJIANG JINDUN FANS HOLDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG JINDUN FANS HOLDING CO Ltd filed Critical ZHEJIANG JINDUN FANS HOLDING CO Ltd
Priority to CN 201220706134 priority Critical patent/CN203067008U/en
Application granted granted Critical
Publication of CN203067008U publication Critical patent/CN203067008U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model relates to a railway tunnel fire prevention ventilation system, and belongs to the technical field of fire protection ventilation systems. The railway tunnel fire prevention ventilation system comprises an axial flow fan, an on-site control cabinet, a remote control cabinet and multiple signal acquisition devices, wherein the axial flow fan, the remote control cabinet and the multiple signal acquisition devices are all connected with the on-site control cabinet, meanwhile the multiple signal acquisition devices are installed in a railway tunnel, and the axial flow fan is mounted in an evacuation exit cave opening of the railway tunnel. The railway tunnel fire prevention ventilation system has efficient fire prevention ventilation performance, and can feed fresh air outside railway tunnel the into the railway tunnel in time under an accident condition so as to meet requirements of railway tunnel fire prevention and ventilation to realize the purpose that people are successfully evacuated under the accident condition.

Description

Railway tunnel fire prevention ventilation system
Technical field
The utility model relates to a kind of railway tunnel fire prevention ventilation system, belongs to fire-fighting ventilation system technical field.
Background technology
Requirement according to " railway tunnel is taken precautions against natural calamities to rescue and evacuated the engineering design standard " TB10020-2012, press for a kind of fire-fighting ventilation system, this system need be under emergency conditions, outdoor fresh air can be sent in the railway tunnel, to satisfy the demand that railway tunnel is taken precautions against natural calamities and ventilated, reach the purpose of smooth evacuation personnel under the emergency conditions.
The utility model content
The purpose of this utility model provides a kind of railway tunnel fire prevention ventilation system with the performance of ventilating of efficiently taking precautions against natural calamities.
For achieving the above object, the technical scheme that the utility model adopts is:
A kind of railway tunnel fire prevention ventilation system, comprise axial flow blower, field control cabinet, Long-distance Control cabinet, some collection recoil simulators, wherein axial flow blower, Long-distance Control cabinet, some collection recoil simulators all are connected with the field control cabinet, some collection recoil simulators are installed in the railway tunnel simultaneously, and axial flow blower is installed in the fire escape hole of railway tunnel.
As the further setting of such scheme, described axial flow blower links to each other by cable with the field control cabinet, and the Long-distance Control cabinet links to each other by cable line with the field control cabinet, and some collection recoil simulators link to each other by holding wire with the field control cabinet.
Described field control cabinet is installed in the fire escape hole of railway tunnel.
The utility model railway tunnel fire prevention ventilation system has three kinds of different control modes, comprises control mode, Long-distance Control mode and fire-fighting control mode on the spot.
1: control mode on the spot
Take precautions against natural calamities in the tunnel axial flow blower field control cashier's office in a shop, select control on the spot, with field control cabinet control opening-closing shaft flow fan.
2: the Long-distance Control mode
Receive the order that starts axial flow blower in the janitor's room, start axial flow blower (field control selection handle cashier's office in a shop needs at remote port) cashier's office in a shop in Long-distance Control, control signal is by the PLC of optical cable to the field control cabinet, by PLC start signal output axial flow blower, and resetting shaft flow fan run signal to Long-distance Control cashier's office in a shop.Stop axial flow blower, stop in the operation of Long-distance Control cabinet, control signal stops axial flow blower by the PLC of optical cable to the field control cabinet by the PLC output signal.
3: the fire-fighting control mode
(CO of collection site or the signal of CO2, concentration reach certain alarming value output signal when some collection recoil simulators have the fire-fighting signal; Or the fire-fighting signal that provides of tunnel system) when sending to control system, system starts axial flow blower automatically, and the overload protection of axial flow blower is excised.The maximum ventilation that assurance is taken precautions against natural calamities.When stopping axial flow blower, must or turn off the axial flow blower power supply to execute-in-place field control cabinet.
In a word, the utility model railway tunnel fire prevention ventilation system has the performance of ventilating of efficiently taking precautions against natural calamities, and can timely the fresh air outside the railway tunnel be sent in the railway tunnel under emergency conditions, to satisfy the demand that railway tunnel is taken precautions against natural calamities and ventilated, reach the purpose of smooth evacuation personnel under the emergency conditions.
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is on-the-spot arrangement schematic diagram of the present utility model;
Fig. 2 is control system schematic diagram of the present utility model.
The specific embodiment
As shown in Figure 1 and Figure 2, the utility model railway tunnel fire prevention ventilation system, comprise axial flow blower 4, field control cabinet 3, Long-distance Control cabinet 6, some collection recoil simulators 1, wherein axial flow blower 4, Long-distance Control cabinet 6, some collection recoil simulators 1 all are connected with field control cabinet 3, some collection recoil simulators 1 are installed in the railway tunnel 2 simultaneously, and axial flow blower 4 is installed in the fire escape hole 5 of railway tunnel 2.
As optimal technical scheme, axial flow blower 4 links to each other by cable 9 with field control cabinet 3, and Long-distance Control cabinet 6 links to each other by cable line 8 with field control cabinet 3, and some collection recoil simulators 1 link to each other by holding wire 7 with field control cabinet 3.Field control cabinet 3 is installed in the fire escape hole 5 of railway tunnel 2.
In the utility model railway tunnel fire prevention ventilation system, axial flow blower 4, field control cabinet 3 etc. be exposed to on-the-spot equipment must be under 250 ℃ of conditions safe operation 1 hour.
Operating principle of the present utility model is as follows:
When mode is controlled on the spot, the control on the spot of field control cabinet 3, operation site switch board 3 starts axial flow blower 4.When stopping axial flow blower 4, operation site switch board 3 is controlled.
During remote mode control, field control cabinet 3 can carry out Long-distance Control, when starting axial flow blower 4, start axial flow blower 4 at Long-distance Control cabinet 6, control signal is passed through cable line 8 to the PLC of field control cabinet 3, by PLC start signal output axial flow blower 4, and resetting shaft flow fan 4 run signal are to Long-distance Control cabinet 6 screens.When stopping axial flow blower 4, operation Long-distance Control cabinet 6 stops axial flow blower 4, and control signal stops axial flow blower 4 by the PLC of cable line 8 to field control cabinet 3 by the PLC output signal.
When the fire-fighting mode was controlled, some collection recoil simulators 1 sent the fire-fighting signal to field control cabinet 3, and system starts axial flow blower 4 automatically, and the excision of the overload protection of axial flow blower 4, guarantees the maximum ventilation of taking precautions against natural calamities.When stopping axial flow blower 4, must or turn off axial flow blower 4 power supplys to execute-in-place field control cabinet 3.
Above-described embodiment only is used for explaining inventive concept of the present utility model, but not to the restriction of the utility model rights protection, allly utilizes this design that the utility model is carried out the change of unsubstantiality, all should fall into protection domain of the present utility model.

Claims (3)

1. railway tunnel fire prevention ventilation system, it is characterized in that: comprise axial flow blower, field control cabinet, Long-distance Control cabinet, some collection recoil simulators, wherein axial flow blower, Long-distance Control cabinet, some collection recoil simulators all are connected with the field control cabinet, some collection recoil simulators are installed in the railway tunnel simultaneously, and axial flow blower is installed in the fire escape hole of railway tunnel.
2. railway tunnel as claimed in claim 1 fire prevention ventilation system, it is characterized in that: described axial flow blower links to each other by cable with the field control cabinet, the Long-distance Control cabinet links to each other by cable line with the field control cabinet, and some collection recoil simulators link to each other by holding wire with the field control cabinet.
3. railway tunnel as claimed in claim 1 fire prevention ventilation system, it is characterized in that: described field control cabinet is installed in the fire escape hole of railway tunnel.
CN 201220706134 2012-12-19 2012-12-19 Railway tunnel fire prevention ventilation system Expired - Fee Related CN203067008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220706134 CN203067008U (en) 2012-12-19 2012-12-19 Railway tunnel fire prevention ventilation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220706134 CN203067008U (en) 2012-12-19 2012-12-19 Railway tunnel fire prevention ventilation system

Publications (1)

Publication Number Publication Date
CN203067008U true CN203067008U (en) 2013-07-17

Family

ID=48765817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220706134 Expired - Fee Related CN203067008U (en) 2012-12-19 2012-12-19 Railway tunnel fire prevention ventilation system

Country Status (1)

Country Link
CN (1) CN203067008U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670479A (en) * 2013-12-13 2014-03-26 青岛文创科技有限公司 Ventilation display device for safety of underground pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670479A (en) * 2013-12-13 2014-03-26 青岛文创科技有限公司 Ventilation display device for safety of underground pipeline
CN103670479B (en) * 2013-12-13 2016-06-01 青岛文创科技有限公司 For the ventilation display device of safety of underground pipeline

Similar Documents

Publication Publication Date Title
CN102083286B (en) Combined self-control energy-saving safety cabinet
CN203133641U (en) Grain bin detecting and alarm system based on wireless sensor network
CN204390397U (en) Based on the automatic fire alarm infosystem of BIM
CN207337191U (en) Intelligent substation environment comprehensive monitoring system
CN109683534A (en) A kind of long-range smoke controlling intelligence control system of structural fire protection Internet of Things
CN203480299U (en) Intelligent building energy-saving system
CN101117891A (en) Coal mine gas detecting and draught fan automatic control device
CN102635924A (en) Automatically controlled energy saving system for 10kV power distribution station
CN107732678A (en) A kind of high-voltage board of automatic dehumidifying
CN203067008U (en) Railway tunnel fire prevention ventilation system
CN2934582Y (en) Coal mine methane detection and automatic fan control device
CN202563284U (en) Coal mine adaptive ventilator system
CN201612960U (en) Fire extinguishing system of electrical cabinet of wind turbine generator unit
CN208172630U (en) A kind of electric panel room temperature and humidity control system
CN202547015U (en) Automatic control energy saving system for 10 kV power distribution station
CN203311272U (en) Intelligent indoor gas monitoring and regulating device
CN206161709U (en) A warning electric energy meter box that can put out a fire for distribution network resident end
CN202289285U (en) Fire-fighting linkage control system
CN206035524U (en) Tunnel real -time monitor system
CN205158120U (en) Unattended substation gis room ventilation control system
CN209197077U (en) A kind of emergency ventilation of Underground Garage room and mean time ventilation common system
CN207067784U (en) A kind of weak current engineering building intelligence monitoring system
CN206700537U (en) Novel fan active suppression device
CN202929423U (en) Power station ventilation control system
CN205507583U (en) Environment protection of electric substation integration controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20211219