CN203066981U - Mining system for inclined ore body of surface mine - Google Patents
Mining system for inclined ore body of surface mine Download PDFInfo
- Publication number
- CN203066981U CN203066981U CN 201220636406 CN201220636406U CN203066981U CN 203066981 U CN203066981 U CN 203066981U CN 201220636406 CN201220636406 CN 201220636406 CN 201220636406 U CN201220636406 U CN 201220636406U CN 203066981 U CN203066981 U CN 203066981U
- Authority
- CN
- China
- Prior art keywords
- mining
- rig
- selecting arrangement
- ore
- mining system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model disclosed a mining system for the inclined ore body of a surface mine. The mining system comprises a first selection device, a second selection device, an orientation device, hole drilling devices, a surrounding rock blast shovel-loading and conveying device, and a blast ore removal shovel-loading and conveying device, wherein the first selection device is used for determining a stripping work surface at a place 28-32 metre away from a mining work surface; the second selection device is used for determining the mining work surface at a place 28-32 metre away from a mining work surface; the orientation device is used for enabling the axes of blast holes to be parallel to the inclined surface of the ore body; the orientation device is a hole drilling fixture for the hole drilling devices; the first selection device and the second selection device are in communication connection with at least one hole drilling device respectively, and the at least one hole drilling device which is in communication connection with the first selection device and the second selection device is adjacent to the surrounding rock blast shovel-loading and conveying device, and the blast ore removal shovel-loading and conveying device respectively. With the adoption of the mining system disclosed by the utility model, ore resources can be adequately utilized, ore recovery rate and production efficiency can be increased, ore dilution rate and production cost can be reduced, and work safety degree can be increased.
Description
Technical field
The utility model relates to a kind of mining system of surface mine inclined orebody, and it reduces the rate of dilution and ore loss ratio by means such as the explosions of forward holing, misplace in the stoping operation process.
Background technology
In the prior art, there are the following problems for the mining technology of bargh: adopt straight big gun hole, namely along holing perpendicular to the direction of ore body tendency; With the original idea of the boosting productivity two ends operation simultaneously from ore body; Carry out driling explosion along entire working surface, do not distinguish ore and country rock barren rock.
Therefore, according to the mining technology of prior art, the loss of ore and country rock usually all can occur and sneak into situation in the ore, thereby cause the waste of ore resource and the reduction of head grade.
The utility model content
The purpose of this utility model is to provide a kind of mining system of surface mine inclined orebody, and it can take full advantage of mineral resources, improves ore recovery rate, enhance productivity, reduces ore dilution rate, reduces production costs and improve the job safety degree.
For this reason, the utility model provides a kind of mining system of surface mine inclined orebody, it is characterized in that, described mining system comprises: first selecting arrangement that is used for determining at distance mining face 28-32 rice further overburden operation face; Be used for determining at distance overburden operation face 28-32 rice second selecting arrangement of further mining face; The bearing unit that is parallel to the ore body inclined plane for the axis that makes shot hole; The drilling equipment of shot hole; Country rock explosion shovel dress conveying device; And explosion ore removal shovel dress conveying device, described bearing unit is the drilling tool of described drilling equipment; First selecting arrangement is connected with at least one drilling equipment communication, and at least one drilling equipment that is connected with the first selecting arrangement communication is adjacent with described country rock explosion shovel dress conveying device; Second selecting arrangement is connected with at least one drilling equipment communication, and at least one drilling equipment that is connected with the second selecting arrangement communication is adjacent with described explosion ore removal shovel dress conveying device.
Preferably, the distance of described first selecting arrangement and/or described second selecting arrangement selection overburden operation face is 30 meters.
Preferably, described first selecting arrangement, second selecting arrangement are same devices.
Preferably, described drilling equipment is pneumatic pick, hydraulic drill rig, down-the-hole drill, rotary drill or electric drill.
Preferably, described country rock explosion shovel dress conveying device is truck or belt conveyer.
Preferably, described explosion ore removal shovel dress conveying device is truck or belt conveyer.
Preferably, the angle of regulation range of described bearing unit is the 5-85 degree.
Preferably, described system comprises: big gun hole array positioner; The control device of borer system, described borer system comprise at least one bench drill machine, and the control device of described borer system is for sending movement and halt instruction and making each rig arrive the device of target big gun hole coordinate position at least one bench drill machine; The drive unit of each rig, it is for driving the device that each rig moves and stops; The track-type facilities of each rig, it comprises cross slide way and the longitudinal rail that makes each rig arrive target big gun hole coordinate position; The electric device of each rig, it is the device that makes the drill bit rotation of each rig; And the drill bit of each rig.
Preferably, described rig comprises tilt gauge and tiltedly bores rotating shaft.
Preferably, described big gun hole array positioner is the model of total powerstation or big gun hole array.
According to the utility model, change vertical hole of the prior art and be inclined drill forward, namely hole along the ore body incline direction; Change the operation simultaneously of ore body of the prior art two ends for carrying out operation from a side of ore body tendency; Change of the prior art peeling off with the driling explosion of digging up mine and be the dislocation explosion.Therefore, the useful technique effect that the utility model can bring comprises at least: take full advantage of mineral resources, improve the mining rate of extraction effectively; Reduce ore dilution rate, thereby directly reduce production costs; Improve the job safety degree, avoided cross-operation, make production operation more smooth and easy, and improved work efficiency.
Description of drawings
Fig. 1 is the stope floor map according to surface mine inclined orebody of the present utility model;
Fig. 2 is along the profile in A-B cross section in Fig. 1;
Fig. 3 is the structural representation according to blasthole drilling machine navigation system of the present utility model.
Fig. 4 is the structural representation according to rig of the present utility model.
The specific embodiment
Following term in the utility model does not need to carry out specific description again in manual:
" first selecting arrangement " is used for determining next overburden operation face at distance mining face 28-32 rice;
" second selecting arrangement " is used for determining next mining face at distance overburden operation face 28-32 rice;
" bearing unit " is the drilling tool of described drilling equipment, is used for making the axis of shot hole be parallel to the ore body inclined plane.
" first selecting arrangement ", " second selecting arrangement " they itself all are well-known to those having ordinary skill in the art, have multiple choices, for example, and position indicator, non-contact distance-measurement instrument etc." bearing unit " itself is well-known to those having ordinary skill in the art, and those skilled in the art can select fully as required.
" communication connection " in " first selecting arrangement is connected with at least one drilling equipment communication ", " second selecting arrangement is connected with at least one drilling equipment communication " itself is well-known to those having ordinary skill in the art, have multiple choices, can wire communication, also infinitely communication.
The transfer of data of " selecting arrangement " belongs to common practise for " drilling equipment ", does not also need to carry out in manual specific description again.
Shown in Fig. 1-2, the excavating plant 50 that side slope line 1 and form line 3 center on has A side and B side.Excavating plant 50 has a series of inclined orebodies 2.The utility model adopts the mode of ore deposit useless dislocation explosion 90 alternately to handle overburden operation face 20 and mining face 10.The country rock (overburden operation face 20) that Fig. 1 represents to peel off the left side formerly, and then at mining face 10 production ores, the dislocation distance L of back production and overburden operation face is not less than 28 meters.Fig. 2 represents that vertical hole can increase the position of ore dilution rate and loss late; Simultaneously, reflect intuitively that also inclined drill can not hold the reason of operation from A.Because are inwardly " drawing " less than 90 ° operations, also can directly increase ore dilution rate and loss late.
Be to hole along ore body tendency (shown in arrow D among Fig. 2) according to rock drilling big gun of the present utility model hole implementer's case; The sequence of operation is changed into the outside (shown among Fig. 2 30) beginning of ore body tendency by two ends operation simultaneously; It is not far that the quarrel distance is thrown in loosening blasting, peels off with the dislocation of digging up mine and carry out explosion (shown among Fig. 1 10,20), and the distance L that staggers approximately is about 30 meters of the distance of secondary blasting operation, like this, can avoid the useless heap that mixes in ore deposit well.
Fig. 1 and Fig. 2 have shown main, the main part of system architecture, those skilled in the art such as remaining " communication connection ", " selecting arrangement ", " drilling equipment " understand easily, do not need to be labeled in again on Fig. 1 and Fig. 2 requirement succinct to satisfy, that understand.
The utility model provides a kind of implementation system of improving one's methods of adopting stripping rock drilling operation technique, and it can be advantageously applied in the stoping operation of surface mine inclined orebody.Peel off bursting work face 20 earlier, the production ore scope of operation 10 again, horsestone in the middle of the stripping, and then production ore again.Comprise forward Drilling country rock (shown in arrow D among Fig. 2), explosion shovel loads and transports out, Drilling ore body (shown in arrow D among Fig. 2) forward, and the explosion shovel takes on the ore deposit, also can carry out the 3rd or the 4th time driling explosion according to this, makes that adopting the stripping operation carries out continuously.The utlity model has conveniently, do not need to do other investment, just inclined drill is a bit dark relatively.
According to the utility model, the mining technology of the explosion of implementing forward to hole, to misplace can reduce the rate of dilution and loss late effectively.Forward the drilling and blasting country rock treats that leading about 30 meters of country rock overburden operation face enter forward drilling and blasting of the first lump ore body; Treat that the ore body scope of operation enters country rock overburden operation for the second time for leading about 30 meters, also can carry out according to this adopting the stripping operation the 3rd or the 4th time, adopt the stripping operation at this platform and finish a half that can adopt the stripping operation again simultaneously at next platform, technology is the same.
According to the utility model, by the mode of angling hole explosion, avoided a side to adopt into a leg-of-mutton barren rock, the situation that opposite side has lost a leg-of-mutton ore takes place.According to the utility model, by the dislocation explosion, make that again the rock burst broken heap that divides in ore deposit is better, made things convenient for and adopted the stripping operation, reduced impoverishment rate in mining and loss late effectively, avoided the cross influence in the operation process.
Embodiment as shown in Figure 3, the positioner 100 of big gun hole array; The control device 150 of borer system is communicated with described borer system 120, the horizontal shifter of at least one bench drill machine 121 130 and vertically move device 131 can be respectively along cross slide way 110 and longitudinal rail 111 at horizontal driver 140 with vertically arrive the coordinate position in target big gun hole 101,102,103 etc. under the driving of driver 141.
Embodiment as shown in Figure 4, the electric device 205 of rig make drill bit 206 rotate along the direction shown in the arrow 207; The driving cylinder 200 of drill bit 206 has Hydrauservo System 204, and drill bit 206 has the tilt gauge of comprising 201 and tiltedly bores rotating shaft 202.
Claims (10)
1. the mining system of a surface mine inclined orebody is characterized in that, described mining system comprises: first selecting arrangement that is used for determining at distance mining face 28-32 rice further overburden operation face; Be used for determining at distance overburden operation face 28-32 rice second selecting arrangement of further mining face; Be used for making the axis of shot hole to be parallel to the bearing unit on ore body inclined plane, described bearing unit is the drilling tool of described drilling equipment; The drilling equipment of shot hole; Country rock explosion shovel dress conveying device; And explosion ore removal shovel dress conveying device; First selecting arrangement is connected with at least one drilling equipment communication, and at least one drilling equipment that is connected with the first selecting arrangement communication is adjacent with described country rock explosion shovel dress conveying device; Second selecting arrangement is connected with at least one drilling equipment communication, and at least one drilling equipment that is connected with the second selecting arrangement communication is adjacent with described explosion ore removal shovel dress conveying device.
2. mining system as claimed in claim 1 is characterized in that, it is 30 meters that described first selecting arrangement is selected the distance of overburden operation face, and/or the distance of described second selecting arrangement selection mining face is 30 meters.
3. mining system as claimed in claim 1 is characterized in that, described first selecting arrangement and described second selecting arrangement are same devices.
4. mining system as claimed in claim 1 is characterized in that, described drilling equipment is pneumatic pick, hydraulic drill rig, down-the-hole drill, rotary drill or electric drill.
5. mining system as claimed in claim 1 is characterized in that, described country rock explosion shovel dress conveying device is truck or belt conveyer.
6. mining system as claimed in claim 1 is characterized in that, described explosion ore removal shovel dress conveying device is truck or belt conveyer.
7. mining system as claimed in claim 1 is characterized in that, the angle of regulation range of described bearing unit is the 5-85 degree.
8. mining system as claimed in claim 1 is characterized in that, described system comprises: big gun hole array positioner; The control device of borer system, described borer system comprise at least one bench drill machine, and the control device of described borer system is for sending movement and halt instruction and making each rig arrive the device of target big gun hole coordinate position at least one bench drill machine; The drive unit of each rig, it is for driving the device that each rig moves and stops; The track-type facilities of each rig, it comprises cross slide way and the longitudinal rail that makes each rig arrive target big gun hole coordinate position; The electric device of each rig, it is the device that makes the drill bit rotation of each rig; And the drill bit of each rig.
9. mining system as claimed in claim 1 is characterized in that, described rig comprises tilt gauge and tiltedly bores rotating shaft.
10. the stripping system of adopting as claimed in claim 1 is characterized in that, described big gun hole array positioner is the model of total powerstation or big gun hole array.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220636406 CN203066981U (en) | 2011-12-19 | 2012-11-27 | Mining system for inclined ore body of surface mine |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120533667 | 2011-12-19 | ||
CN201120533667.X | 2011-12-19 | ||
CN 201220636406 CN203066981U (en) | 2011-12-19 | 2012-11-27 | Mining system for inclined ore body of surface mine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066981U true CN203066981U (en) | 2013-07-17 |
Family
ID=48765790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220636406 Expired - Fee Related CN203066981U (en) | 2011-12-19 | 2012-11-27 | Mining system for inclined ore body of surface mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066981U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691888A (en) * | 2020-06-12 | 2020-09-22 | 鞍钢集团矿业有限公司 | Accurate shovel loading system and method for surface mine |
-
2012
- 2012-11-27 CN CN 201220636406 patent/CN203066981U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691888A (en) * | 2020-06-12 | 2020-09-22 | 鞍钢集团矿业有限公司 | Accurate shovel loading system and method for surface mine |
CN111691888B (en) * | 2020-06-12 | 2021-10-22 | 鞍钢集团矿业有限公司 | Accurate shovel loading system and method for surface mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102562071B (en) | Mining technology for inclined orebodies in opencast mines | |
CN106223956B (en) | Medium-length hole courtyard mining afterwards filling method | |
Wang et al. | Non-explosive mining and waste utilization for achieving green mining in underground hard rock mine in China | |
CN105952450B (en) | A kind of new method of the double stope collaboration exploitations in underground mine underground | |
CN101191416A (en) | Rock lane digging method | |
CN101266123B (en) | Crushing station pit digging method | |
CN104612693A (en) | Continuous coal-mining technology for strip mine | |
CN105041317A (en) | Medium-length hole shrinkage stoping method | |
CN103670401B (en) | A kind of drum shearer that can two-wayly creep into of certainly walking | |
CN108150177B (en) | Multi-functional hard-rock tunnel fast digging technique and equipment | |
CN101302932A (en) | Method for underground chamber digging and laneway opening digging | |
CN103643952B (en) | A kind of brill formula coal-winning machine that can two-way creep into of certainly walking | |
CN108457652A (en) | A kind of blockette segmentation full blast pressure shortwall even adopts placement method | |
CN203066981U (en) | Mining system for inclined ore body of surface mine | |
CN101956555B (en) | Mining method with different stope structure parameter transition and application thereof | |
CN201747370U (en) | Digging machine with machine digging operation function and drill carriage drilling operation function | |
CN201534712U (en) | Coal and waste rock separation device | |
CN107237635B (en) | A kind of thick solid potassium salt mine recovery method of spy for once adopting full thickness | |
CN102748032B (en) | Mechanized rapid construction method for traditional rock drivage | |
CN110259450A (en) | Mining method for inclined-steeply inclined medium-thickness ore body | |
WO2022174609A1 (en) | Automated hydraulic block-cutting coal roadway tunneling jumbo | |
CN104481535A (en) | Drilling and production integrated method for steep-inclined coal seam | |
CN103982184A (en) | Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method | |
CN108547658A (en) | A kind of high inclination-angle ultra-thin coal seam spoil is from slipping backfilling goaf method | |
CN203655284U (en) | Self-walking drum shearer capable of drilling in bidirectional mode |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20171127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |